Description Description Basement Floor: Midroc Construction Ethiopia P.L.C Prime Real Estate Project
Description Description Basement Floor: Midroc Construction Ethiopia P.L.C Prime Real Estate Project
C
Prime Real Estate Project
Basement floor
50mm lean concrete quality C-5, 150 kg of
cement/m3,
a) Under footing
2.01 5 2.20 F1
2.20 24.20
7 1.85 F2
1.85 23.96
4 1.56 F3
1.56 9.73
5 1.21 F4
1.21 7.32
1 3.50 F5
2.80 9.80
75.01
Contractor Consultant
MIDROC CONSTRUCTION ETHIOPIA P.L.C
Prime Real Estate Project
7 1.85 F2
1.85 16.77
0.70
4 1.56 F3
1.56 5.84
0.60
5 1.21 F4
1.21 3.29
0.45
1 3.50 F5
2.80 6.86
0.70
52.13
1 0.25 C1'
0.40 0.22
2.20
2 0.20 C2
0.40 0.35
2.20
3 0.40 C3
0.50 1.32
2.20
2 0.30 C4
0.50 0.66
2.20
3 0.40 C5=C3
0.50 1.32
2.20
Contractor Consultant
MIDROC CONSTRUCTION ETHIOPIA P.L.C
Prime Real Estate Project
1 0.30 C6=C4
0.50 0.33
2.20
3 0.40 C7
0.50 1.32
2.20
2 0.30 C8
0.50 0.66
2.20
7.06
basement column
4 0.25 C1
0.40 1.28
3.20
1 0.25 C1'
0.40 0.32
3.20
2 0.20 C2
0.40 0.51
3.20
3 0.40 C3
0.50 1.92
3.20
2 0.30 C4
0.50 0.96
3.20
3 0.40 C5=C3
0.50 1.92
3.20
1 0.30 C6=C4
0.50 0.48
3.20
3 0.40 C7
0.50 1.92
3.20
Contractor Consultant
MIDROC CONSTRUCTION ETHIOPIA P.L.C
Prime Real Estate Project
2 0.30 C8
0.50 0.96
3.20
10.27
2.02 C c) beams
Basement floor beams Ground floor beam
4 15.21 B9
0.25 6.84
0.45
1 13.44 B6
0.25 1.51
0.45
1 13.44 B8
0.25 1.51
0.45
1 24.93 B1
0.25 2.80
0.45
1 1.35 B2
0.25 0.15
0.45
2 26.98 B3
0.25 6.07
0.45
1 2.99 B4
0.25 0.34
0.45
1 23.53 B5
0.20 2.12
0.45
21.35
Contractor Consultant
MIDROC CONSTRUCTION ETHIOPIA P.L.C
Prime Real Estate Project
d)Slab
1 403.98 column area=7.06/2.2=3.02
0.10 40.40 407-3.02=403.98
Basement level
1 1.55
3.20 4.96
Contractor Consultant
Contractor Consultant
Contractor Consultant
Contractor Consultant