Bar Bending Schedule (BBS) Estimate of Steel in Building Construction
Bar Bending Schedule (BBS) Estimate of Steel in Building Construction
Bar Bending Schedule (BBS) Estimate of Steel in Building Construction
Contact Us
AUTHOR
Engineering
Discoveries
2. Weight of Bar
D2/162
for length = 1m
(were D =
Dia of Bar)
Weight of bar =
D2/162Therefore for length 1m
= 1m x D2/162
= 7.40Kgs
Hope, now you are clear with the Hook length calculation.
2- Bend Length
θ0 D/
Sinθ
D/
tanθ la =D/Sinθ – D/tanθ
900 D/1 0 1D
Total
Bar Length of Total Bend Total Length
Shapes Hooks Length of Bar
= 18d
only 18d**d=Dia. =
0.42DRemember
D = Depth of
Slab-Top Cover-
Bottom cover
= 18d =(40d to
45d)+18d
Have You seen the below picture on your top floor of the
building? We generally project some length of Bar on the
last floor i.e., 50D. It is used for further construction
purpose. (Constructing a new floor)
BBS of Column
(3mx0.3mx0.3m)
2. Stirrups
2. Stirrups = 30
2. Stirrups = 1.44m
2. Stirrups = 43.2m
2. Stirrups =17Kgs
Main bars = 4
Longitudinal bars = 30
Stirrups:
= 3 x 2d + 2 x 3d = 12d = 12 x 8 =0.096m
= 4 x 4.6 = 18.4m
=30×1.44=43.2m
SOCIAL LINKS
Weight of steel bar:
CATEGORIES
3- With the help of reinforcement drawings, cutting and
bending can be done at the factory and transported to the Architectural Engineering (1,098)
site. This increases faster construction and reduces the Civil Engineering (880)
total construction cost.
Electrical Engineering (42)
Math (43)
Share this
Safety (6)
Technology (13)
Uncategorised (9)