0% found this document useful (0 votes)
370 views23 pages

Project Scheduling by Critical Path Method CPM

The document discusses critical path method (CPM), a technique used to schedule large construction projects. CPM involves breaking a project into individual tasks, determining the order tasks must be completed in based on technological constraints, drawing a network diagram showing task dependencies, estimating task durations, and using the network to schedule tasks to minimize project duration. Key steps include identifying predecessor and successor tasks, representing task relationships in an activity-on-arrow diagram, checking for consistency in relationships, and using the network to determine earliest and latest start times for tasks. CPM aims to identify critical paths and tasks that must start on time to avoid delaying the entire project.

Uploaded by

Sherif Eltoukhi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
370 views23 pages

Project Scheduling by Critical Path Method CPM

The document discusses critical path method (CPM), a technique used to schedule large construction projects. CPM involves breaking a project into individual tasks, determining the order tasks must be completed in based on technological constraints, drawing a network diagram showing task dependencies, estimating task durations, and using the network to schedule tasks to minimize project duration. Key steps include identifying predecessor and successor tasks, representing task relationships in an activity-on-arrow diagram, checking for consistency in relationships, and using the network to determine earliest and latest start times for tasks. CPM aims to identify critical paths and tasks that must start on time to avoid delaying the entire project.

Uploaded by

Sherif Eltoukhi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 23

12.

Project Scheduling by Critical Path Method (CPM)


Katta G. Murty Lecture slides CPM is application of DP to problems in Construction (project) Management. Many large construction projects going on around world. The recently completed Hong Kong Airport (Chek Lap Kok) and associated rail and bridge work, > US $ 10 Billion The more than US $ 1 billion Shanghai World Financial Center (95 oors, 460 meters tall, 3.5 million feet2, expected to be worlds tallest building when completed). CPM is a method for planning, scheduling, and controlling such projects.

176

Basic Steps in CPM


1 Decompose project into Individual 2 Determine

Jobs or Activities.

Precedence Relationships among jobs. They

come from technological constraints. For example: Suspension bridge road units cannot be lifted into place until pillars are prepared. Painting the walls cannot be started until erecting walls completed. 3 Draw the Arrow Diagram, or AOA Diagram, or Project

Network representing precedence relationships.


4 Estimate job durations. 5 Use CPM to schedule activities over time to minimize project duration (DP used here). 6 In operation, if any job delayed, use CPM to revise schedule for remaining jobs.

177

Precedence Relationships
Predecessor or Job 1 is a Ancestor

Predecessor or Ances-

tor of job 2 if job 2 cannot be started


until job 1 completed. or In above job 2 is a Successor or de-

Successor Descendent Immediate Predecessor

scendent of job 1.
If job 1 is a predecessor of job 2, and no other job is a predecessor to job 2 and successor to job 1; job 1 is an

Immediate Predecessor of job 2


Immediate Successor If job 1 is an immediate predecessor of job 2, then job 2 is an Immediate

Successor of job 1.
A job may have many immediate predecessors, and many immediate successors. It can only be started after all its immediate predecessors have been completed.

178

Transitivity
Job 1 predecessor of job 2, and job 2 predecessor of job 3 job 1 predecessor of job 3. This property called Transitivity. Given immediate predecessors of a job, we can obtain all its predecessors by transitivity. Precedence relationships dene a jobs. If transitivity establishes that a job is a predecessor of itself, there is an Inconsistency in the data that should be corrected. If a distant predecessor of a job is shown as an immediate predecessor, there is

Partial Ordering among

Redundancy in the predecessor data, which

should be corrected.

179

Example: Constructing an Oce Bldg.


Job 1. Site selection & purchase 2. Architectural plans (AP) 3. Revisions to AP 4. Arrange Financing 5. Construct outer frame 6. Plans for interior 7. Order furnishings (desks, etc.) 8. Order Computer equipment 9. Computer Network Design 10. Interior Construction 11. Instal computer equipment 12. Move-In

IPs Duration 30 45 30 60 90 25 120 120 70 70 90 5

Days

180

Construct single family home Job 0. Purchase site 1. Prepare blueprint 2. Excavation 3. Foundations & Basement walls 4. Frame 5. Electrical wiring 6. Insulate 7. Roong 8. Ductwork & Plumbing 9. Drywall installation 10. Instal siding 11. Exterior painting 12. Interior painting 13. Carpeting 14.Instal interior xtures 15. Instal Exterior xtures 16. Move-in

IPs

Duration 16

0 1 2 3 4 4 4 6 5, 7, 8 7 10 9 12 13 11 14, 15
181

6 4 3 5 2 1 2 4 6 4 3 4 2 7 2 1

weeks

Hydroelectric Power Station Building Project No. Job 1. Site Ecological survey 2. Get EPA approval 3. Economic feasibility study 4. Prel. design and cost est. 5. Project approval 6. Call quotations for elec. equip. (turbines, generators, . . .) 7. Select suppliers for elec. equip. 8. Final design 9. Select construction contractors 10. Arrange materials supply 11. Dam building 12. Power station building 13. Power lines erection 14. Elec. equip. installation 15. Build up reservoir water level 16. Commission the generators 17. Start supplying power 182

IPs

Duration 6.2

1 1 3 2, 4 5

9.1 7.3 4.2 10.2 4.3

6 5 5 8, 9 10 10 7, 8 7, 12 11 14, 15 13, 16

3.1 6.5 2.7 5.2 24.8 18.4 20.3 6.8 2.1 1.2 1.1

months

Project Networks
2 ways to represent predecessor relationships in network form. AON (Activity On Node) network easy to draw, not very useful. We discuss

Activity On Arc (AOA) diagram or Arrow

diagram. Here, jobs correspond to arcs. Each node corresponds


to an Event, jobs corresponding to all arcs incident into it, and all their predecessors, have been completed. To portray predecessor relationships correctly in arrow diagram, sometimes necessary to introduce sponding to Dummy

Dummy arcs corre-

jobs (which always have 0 duration).

183

PROPERTIES SATISFIED BY ARROW DIAGRAM: 1 If job 1 is a predecessor of job 2, there will be a directed path in arrow diagram from the head node of job 1 to the tail node of job 2 (i.e. predecessor relationship represented through directed paths).

2 If job 1 is an immediate predecessor of job 2, Either head node of job 1 is tail node of job 2

Or there is a directed path from head node of job 1 to the tail node of job 2 consisting of dummy arcs only.

184

Need For Dummy Arcs


Dummy arcs necessary whenever there is a subset of jobs A that have some but not all IPs in common. In this case we let arcs corresponding to common IPs of jobs in A to have same head node, and then add dummy arcs from that node to the tail nodes of arcs corresponding to jobs in A.

Example
Job e1 e2 e3 e4 e5 e6 e7 e4 e1, e2, e5 e2, e3, e5 IPs

185

To avoid confusion, we follow convention that there should be no parallel arcs. So, if there are several jobs with same set of IPs, and same set of immediate successors, we represent them using dummy arcs.

How to Draw Arrow Diagram?


Put a

Start node representing event of commencing project.

Represent each job with no predecessor by an arc incident out of this start node. Same way, at end, represent all jobs with no successors by arcs incident into a single nal node Finish of project completion. If a job b has a single IP a, then b can be represented by an arc incident out of the head node of a. If a job b has more than one IP, let p1, . . . , pr be the head nodes of IPs of job b: either represent b by an arc incident out of one of the nodes
186

Node representing event

p1, . . . , pr , say p1, and include dummy arcs from p2, . . . , pr into p1. or represent b by an arc incident out of a new node Q and include dummy arcs (p1, Q), . . . , (pr , Q). If some jobs have identical sets of immediate successors, make the head node of arcs representing them the same. If several jobs have some common IPs, represent these common IPs by arcs with the same head node, and include dummy arcs coming out of this node as necessary. Check: Precedence relationships not implied by original data not introduced. Precedence relationships implied by original data not omitted. See if no. of nodes & no. of dummy nodes can be reduced. For example, if there is a node with a single arc (which is a dummy arc) incident at it, then the 2 nodes on this dummy arc can be merged, and that dummy arc eliminated.
187

Since no job can be its own predecessor, project network cannot contain any directed cycles, so project network must be an acyclic network.

Acyclic Networks
A directed network that contains no circuits (directed cycles): A circuit or directed cycle

A cycle that is not a circuit.

Theorem: A Directed network acyclic i nodes can be numbered s. th. on each arc number of tail < number of head Such numbering of nodes called acyclic numbering or topological ordering.

188

How to check if network acyclic, & nd acyclic numbering of its nodes?


1. Number all nodes with no arcs incident into them, serially beginning with 1. Strike o all these nodes & arcs incident at them. 2. Now continue numbering all nodes with no arcs that are not struck o, incident into them, serially. Strike o all newly numbered nodes & arcs incident at them. 3. Repeat Step 2 until either: all nodes numbered (in this case network acyclic, you have acyclic numbering, terminate) or some unnumbered nodes, but every one has an arc that is not struck o, incident into it (in this case, network not acyclic, terminate).

189

Examples

190

Project Scheduling
Find acyclic numbering of nodes in project network. Node 1 = start node, node n = nish node. To lay out jobs on time axis to minimize project duration. To answer questions like: Start time = 0. How soon can project be completed? How early would event corresp. to each node materialize? What is earliest time at which each job can be started (called

Early Start Time of Job)?


For each job, what is latest time at which it can be started, without delaying project completion? Etc.

191

The Data
For each arc (i, j) in the project network: tij = Duration of job represented by arc (i, j) = Length of arc (i, j)

Earliest Event Times


Dene: ti = Length of longest chain from node 1 to i. Clearly ti = earliest time at which event corresponding to node i can materialize. tn = length of longest chain from start node 1 to nish node n = Minimum

Project Duration. Critical

A longest chain from node 1 to node n is called a

Path. There may be several critical paths.


Arcs on critical paths called

Critical arcs, they represent

Critical jobs.
To complete project in min. time, every critical job should be started at earliest time. Any delay in a critical job delays project
192

completion. Jobs not on any critical path called Slack

jobs.

Early start time of job (i, j) = ti Early Finish Time of job (i, j) = ti + tij . Forward pass DP Algorithm to nd Early Start Times tis Data Structures
The Forward

label on node i will be (Li, ti) where Li called

Predecessor Index of node i, is the previous node to i on a


longest chain from 1 to i.

Boundary Conditions: t1 = 0. Forward label node 1 with


(, 0). This label indicates it is Origin

node.

In this pass nodes labeled in the order 1 to n. The recurrence eq. for node r is: tr = max{ti + tir : i s. th. (i, r) is an arc}

Lr in the label for node r is the i that attains the maximum in


193

the above eq. The longest path from node 1 to i can be traced using the predecessor indices backwards beginning with node i. The longest path from 1 to n is one critical path.

To nd all critical jobs & Latest Start Times:


The forward pass gives only one critical path. To nd all critical arcs, we dene: i = Latest point of time at which the event corresponding to node i has to materialize for the project to nish in minimum duration. n = tn (Boundary Condition)

i = n length of the longest chain from node i to node n.

194

The Backward Pass


This pass determines the i by DP. They are determined in the order i = n, n 1, . . . , 2, 1. n = tn Boundary condition. j s. th. (i, j) is an arc} i = min{j tij : The Late The Late The

Finish of job (i, j) = j Staret of job (i, j) = j tij

Total Slack of job (i, j) = Late start - early start =

j tij ti. Job (i, j) is critical i its total slack = 0. HOMEWORK PROBLEMS:
1.Draw the arrow diagram and determine the early and late start and nish times of the various jobs in the following projects (A. Kanda and N. Singh [1988]).

195

No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23.

Project: Setting Up a Fossil Fuel Power Plant Job IPs Job duration (months) Land acquisition 6 Identi. trained personnel 1 3 Land dev. & infrastructure 1 2 Control room eng. 1 12 Lag in turbine civil works 1 8 Delivery of TG 1 12 Delivery of boiler 1 10 Joining time for personnel 2 3 Boiler prel. civil works 3 2 Control room civil works 4 5 TG civil works 5 9 Training 8 6 Boiler nal civil works 9 9 Erection of control room 10 8 Erection of TG 6, 11 10 Boiler erection 7, 13 12 Hydraulic test 16 2 Boiler light up 14, 17 1.5 Box up of turbine 15 3 Steam blowing, safety 18, 19 2.5 valve oating Turbine rolling 20 1.5 Trial run 21 1 Synchronization 22 1 IP = Immediate predecessors

2. Draw an arrow diagram for each of the following projects. Prepare a schedule for the various jobs in each project to complete it in minimum time. (R. Visweswara Rao). (a) Sewer and Waste System Design for a Power Plant No. Activity IPs Duration (days) 1. Collection system 40 outline 2.. Final design & 1 30 approval 3. Issue construction 2 30 drawings 4. Get sewer pipe 1 145 & manholes 5. Fabricate & ship 3,4 45 6. Treat. system 70 drawings & approval 7. Issue treat. system 6 30 construction drawings 8. Award contract 7 60 9. Final construction 8, 5 300 IP = Immediate predecessors

196

(b) Data Process and Collection System Design for a Power Plant No. Activity IPs Duration (days) 1. Prel. Syst. 40 description 2. Develop specs. 1 100 3. Client approval 2 50 & place order contd. Data Process and Collection System Design contd. No. Activity IPs Duration (days) 4. Develop I/O 2 60 summary 5. Develop alarm 4 40 list 6. Develop log 3, 5 40 formats 7. Software def. 3 35 8. Hardware 3 35 requirements 9. Finalize I/O 5, 6 60 summary 10. Anal. performance 9 70 calculation 11. Auto. turbine 9 60 startup anal. 12. Boiler guides anal. 9 30 13. Fabricate & ship 10, 11, 12 400 14. Software preparation 7, 10, 11 80 15. Install & check 13, 14 130 16. Termination & 9 30 wiring lists 17. Schematic wiring 16 60 lists 18. Pulling & term. 15, 17 60 of cables 19. Operational test 18 125 20. First ring 19 1 IP = Immediate predecessors

197

(c) Electrical Auxiliary System Design for a Nuclear Plant No. Activity IPs Duration (days) 1. Aux. load list 120 2. 13.8 switchgear 1 190 load ident. 3. 4.16kv & 480 v. switchgear 1 45 load ident. 4. Vital AC load 1 300 determination 5. DC load determ. 1 165 6. Voltage drop study 2 84 7. Diesel gen. sizing 3 77 8. Inventer sizing 4 20 9. Battery sizing 5, 8 40 10. DC fault study 9 80 11. Prel. AC fault 6, 7 20 current study 12. Power transformer 2, 11 80 sizing 13. Composite oneline 2,3 72 diagram 14. Safety (class 1E) 13 200 system design 15. Non-class 1E 13 190 system design 16. Relaying oneline 13 80 & metering dia. 17. 3-line diagram 14, 15, 16 150 18. Synchronizing & 17 100 phasing diagrams 19. Client review 10, 18 25 20. Equipment purchase 19 800 & installation

198

You might also like