MEHP-1-SF-021 Risk Assessment Procedure (Rev. 2)
MEHP-1-SF-021 Risk Assessment Procedure (Rev. 2)
MEHP-1-SF-021 Risk Assessment Procedure (Rev. 2)
Approved by:
GM, Industrial Security,
Fahad Muhajje Al-Anazi 20/02/2020
EHS&S
Name Title/Dept. Signature Date
Issued by:
Jordan Dela Torre Toriaga Document Controller, IMS 20/02/2020
1.0 Purpose
To enable the identification of hazards at work, and the risk assessment of those hazards
are key to a successful occupational health and safety management system. The risk
assessment procedure is the opportunity to be proactive and to identify those situations in
the workplace that might cause illness or injury; and to address these situations before their
consequences happen.
The purpose of this procedure is to define the requirements for Risk Assessments to be
conducted and approved, thereby enabling safety standards within Marafiq to be
improved, periodically reviewed and maintained.
2.0 Scope
The scope of this procedure includes all Marafiq controlled locations & activities requiring
PTW for execution involving employees or / and contractors. Preparation of Risk
Assessment is fully automated through SAP - EHSM module. In case of unavailability of SAP,
Risk Assessment can be prepared manually.
3.2 Definitions
SN Item Definitions
The evaluation of possible harm (consequence), together with the
Risk
1 likelihood that the harm will be realized, in order to determine necessary
Assessment
control measures.
Something with the potential to cause harm. This can be a substance,
2 Hazard plant, process, or environment; and be physical, chemical, biological,
ergonomic, or combinations of these.
The chance of something happening, usually measured in terms of the
3 Risk likelihood of harm from a hazard being realized combined with the
consequences of that harm.
Existing
Items (Physical or Procedural) used to eliminate, reduce or control the
4 Control
risk that are existing in place.
Measures
Additional
Further items (Physical or Procedural) used to eliminate, reduce or control
Control
the risk.
Measures
A documented plan of work identifying all key steps, the significant hazards
Method
5 that may result from not adhering to the agreed plan and the control
Statement
measures that will be implemented to avoid those hazards
The risk assessor responsible for leading a team of employees for a
6 Team Leader
particular risk assessment.
Team
7 A member of the team for a particular risk assessment
Member
8 Initial Risk The risk result from performing any work step or activity
9 Residual Risk The risk remains after applying additional control measures
RHM is a 5 × 5 two-dimensional risk matrix. The matrix demonstrates the
increase in probability (Likelihood) in the vertical axis and the potential
consequence (Impact) of an incident in the horizontal axis. Impact is
Risk heat classified as health & safety, environmental and financial consequences.
10
Map
Risk values are generated through multiplying probability (Likelihood) by
the potential consequence (impact). The potential consequence (impact) is
determined by using the URAC (Unified Risk Assessment).
Table - a
Likelihood Risk Bands
Medium CriticalCritical
5 Expected High (10) High (15)
(5) (25) (20)
Highly Medium Critical High
4 Low (4) High (12)
likely (8) (20) (16)
Risk Heat Medium Medium High High
11 3 Likely Low (3)
Map Table (6) (9) (15) (12)
Medium High Medium
2 Slight Low (2) Low (4)
(6) (10) (8)
Not Medium
1 Low (1) Low (2) Low (3) Low (4)
likely (5)
Minor Moderate Important Material Severe
Impact 1 2 3 4 5
Table - b
Score Range (RPN) Risk Level
Risk Bands / 1–4 1 Low
12
Risk Levels 5–9 2 Medium
10 – 19 3 High
20 – 25 4 Critical
The following table illustrates the defined score range against each level
along with typical risk mitigation strategies.
Table - c
Score Risk Level Typical Mitigation Strategies
Range
Mitigation 1–4 Low (1) Accept and continually monitor the risk.
strategies of 5–9 Reduce/transfer the risk to acceptable level.
13 the Risk Medium (2)
Level Table
10 – 19 Reduce/transfer/avoid the risk to acceptable
High (3) level – priority action/decision required.
Unified Risk
The URAC of the company is a two dimensional criteria, i.e., each risk is
Assessment
14 assessed based on (1) impact of an event or a series of similar events and
Criteria
(2) likelihood of occurrence of such an event or a series of similar events.
(URAC)
Table - d
Score Description Environment
• Environmental catastrophe
• Long-term environmental damage (require
5 Severe >5 years to recover)
• Require SAR >40 million to restore or rectify
• Revoke of EPO
• Significant environmental damage
• Medium-term environmental damage
(require >1-5 years to recover)
4 Material • Require SAR >4 million up to 40 million to
restore or rectify
• RCER Class III violations (continuous
environmental violation)
• Short-term environmental damage (require
15 >24 hours but <1 year to recover)
Environment
• Require SAR >400,000 up to 4 million to
Impact Scale 3 Important
restore or rectify
• RCER Class II violations (frequent
environmental violation)
• Marginal environmental damage which can
be corrected within 24 hours
2 Moderate • Require SAR >100,000 up to 400,000 to
restore or rectify
• RCER Class I violations
• Negligible environmental damage which can
be corrected within 2 hours
1 Minor • Require SAR 40,000 up to 100,000 to restore
or rectify
• RCER Class 0 violations
Table - e
Score Description Health & Safety
· One or more fatality of employee,
5 Severe
contractor staff or public
· Permanent total disability of one or
4 Material
more employees, contractor staff or public
· Lost time injury
3 Important · In-patient medical care required for
OHS Impact
16 employee, contractor staff or public
Scale
· Minor injury or illness with reversible
2 Moderate health effect
· Restricted work case
· Slight injury or health effect
1 Minor · Out-patient medical treatment to
employee, contractor staff or public
Table - f
Score Description Financial – Site (SAR)
Table- g
Score Description
Likelihood of 5 Expected
18 4 Highly Likely
consequence
3 Likely
2 Less Likely
1 Remote
4.0 Responsibilities
5.0 Validity
This document will remain valid until the need for its subsequent revision of contents
6.0 Procedure
6.1 Risk Assessment
6.1.1 Identify the Job steps and Hazards
Risk Assessments are required for non-routine jobs or routine job for the assessment and
control of occupational health, safety and environmental hazards and risks in order to
provide and maintain a safe and healthy workplace.
For the Specific activity to be assessed, identify the Job steps and Hazards
A multidisciplinary risk assessment team is formed with minimum 3 members including
team leader. The Team Leader will ensure that a method statement is prepared by the
execution team. A method statement should communicate, as a minimum:
• Step by step Job activities
• Anticipated Hazards / risks
• Resources and equipment required / available
• Competencies required
• Emergency procedures
The team then starts identifying the hazards associated with each job step as listed in
Method statement. Hazard identification may be facilitated by using observation, reviewing
records of accidents and incidents, reviewing incidents outside Marafiq, interviewing
individuals and records of audits and inspections.
The Initial risks shall be calculated as per the rating criteria detailed in tables d, e, f & g
above to decide on at Risk Priority Number (RPN) from the table b.
RPN is calculated as ‘RPN=Impact X Likelihood’.
Use table ‘a’, the 5x5 Risk Heat Map to identify the rate for the Impact and likelihood.
While identifying and reviewing the additional control measures consideration shall be given
to the following “Hierarchy of controls” to mitigate /minimize the risk.
• Elimination
• Substitution
• Engineering Controls
• Signage, warning, training or other Administrative controls
• Personal Protective Equipment (PPE)
The Residual risks shall be calculated as per the rating criteria detailed in tables d, e, f & g
above to decide on at Risk Priority Number (RPN) from the table b.
6.1.8 RA Approval:
RA shall be prepared by a multi-disciplinary team consisting of minimum 3 members. The
RA shall be reviewed by Marafiq Coordinating Department and OHS section. The RA shall be
approved by Marafiq Operations Department.
6.1.12 Changes
If the activity, location, substances, types of hazard encountered or equipment change
significantly, it is possible that the risks may not be controlled adequately. A minor change
such as a slight difference in location, sequence or equipment may not have any impact on
the risk. If the change is significant, the work associated with the change should be paused
while the risks are re-assessed and new control measures identified and communicated.
Marafiq OHS section is entitled to demand for the review of the RA.