Proposal For Facade Repair Work, Mill Building Phase.1
Proposal For Facade Repair Work, Mill Building Phase.1
Proposal For Facade Repair Work, Mill Building Phase.1
1.2 Our company use kaeser screw compressor type BSD 75 and ASD 37 to supplies all pressure utility needed in mill and mixing area, and intensive care is absolutely needed 3.1 If it rains, water seeps into the factory building, this is a problem that interferes with the plant's operations, so it needs to be fixed, in the manner described below.
to keep it work properly. So the case of compressor shut-off because Over-heating is should not happen.
1.3 One of the causes of over-heating is : Heat dissipation on the cooler unit is not working properly, and Air circulation in the compressor room is not good (too hot).
Existing condition, all surface of the gab wall with column and beam structure,
there are cracks that are large enough. 4.1
VI . Cost Summary