100% found this document useful (1 vote)
98 views4 pages

Project Instructions

The document outlines four project plans with varying page requirements and salaries. Applicants are instructed to select a plan, complete sample work, and submit their selection by the deadline to receive project details and start work. Terms specify work must be completed on time, manually typed, and submitted via email to receive a payment report and compensation within 48 hours by a preferred payment method.

Uploaded by

Fernando Piana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
98 views4 pages

Project Instructions

The document outlines four project plans with varying page requirements and salaries. Applicants are instructed to select a plan, complete sample work, and submit their selection by the deadline to receive project details and start work. Terms specify work must be completed on time, manually typed, and submitted via email to receive a payment report and compensation within 48 hours by a preferred payment method.

Uploaded by

Fernando Piana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

PROJECT INSTRUCTIONS;

1. Go through project plans below and select anyone you will be able to do
2. Make sure you can do the work you pick.

subsequent salary payment.


PROJECT DETAILs

PLAN .A
PAGES/DURATION 36PG(S) 5 DAYS)
SALARY $1000
PLAN. B
PAGES/DURATION 55PG(S) 5 DAYS)
SALARY $1400
PLAN C
PAGES/DURATION 85PG(S) 5 DAYS)
SALARY $1800
PLAN. D

PAGES/DURATION 130pgs(S) 5 Days


SALARY $2200

HOW TO START
We will be providing all applicant[s] with a sample of the expected work[PROJECT]. And
applicant[s] will make a decision on which of the four[4] Project he/she can handle and
submit before the deadline of each selected project

TERMS AND CONDITIONS

1. Project should be completed within the deadline.


2. If any extra or duplicate file found in the zip file, the entire work will be
rejected.
3. Incomplete project will not be accepted.
4. Only type manually, using third party software is prohibited

IMPORTANT NOTICE

1. You’ll receive and submit work via mail.


2. You’ll send us only soft copy output files.
3. You’ll get your accuracy report and payment within 1 hour after submitting
project..

IMPORTANT NOTICE

These are the only accepted method of receiving your salary

1. Skrill
2. Netteller
3. Binace
4. Payeer
5. Paxful
6. Direct mobile transfer, [All countries
7. Zele apple pay
8. Google pay
9. Moon pay
10.Cash pay
11.Paypal

PROJECT SUBMISSION

 You will receive and submit project via Email.


 You will send us only soft copy of output files.
 You will get your accuracy report and payment within 48 hours after submission of
your work.
 You will get your payment in your preferred payment method within 48 hours after
submission of work.
 Project once chosen can be change or upgraded later.

You might also like