Checklist For UG Drainage Pipe
Checklist For UG Drainage Pipe
Checklist For UG Drainage Pipe
Building Affairs
ALMISNAD
PROJECT: CONSTRUCTION OF SIX (6) NOs. NEW KINDERGARTENS AROUND DOHA AND VILLAGES – PACKAGE 8
1 Check the pipes and other fittings / material used have approved submittals.
3 Inspect all the pipes and fittings used are new and undamaged.
4 Ensure that trench bedding is examined leveled and sloped as per the specifications / requirement (Where Applicable).
7 All the joints are completed properly with appropriate / approved jointing material and as per manufacturer’s instructions.
10 Temporary supports as required, thrust blocks and concrete encasing provided as specified (where applicable).
The under ground piping system is checked for leaks and defects as per approved / specified method of testing. Test results are
11
recorded and documented.
12 All the pipe work is protected during the remainder of the construction period and plugs are placed for the incomplete piping.
Name
Signature
Date