The document provides instructions for setting up an integration between SAP ECC and SAP APO systems to allow transfer of data between the two systems. It outlines the key configuration steps needed in both ECC and APO including 1) defining logical systems, 2) setting RFC destinations, 3) assigning destinations to application cases, 4) setting target systems and queue types, 5) setting user parameters. It then demonstrates transferring a test material, work center, BOM and routing from ECC to APO and verifying the data was received successfully in APO.

Uploaded by

Dipak Banerjee
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
443 views29 pages

User Manual Apo Rs6 Connection Config

The document provides instructions for setting up an integration between SAP ECC and SAP APO systems to allow transfer of data between the two systems. It outlines the key configuration steps needed in both ECC and APO including 1) defining logical systems, 2) setting RFC destinations, 3) assigning destinations to application cases, 4) setting target systems and queue types, 5) setting user parameters. It then demonstrates transferring a test material, work center, BOM and routing from ECC to APO and verifying the data was received successfully in APO.

Uploaded by

Dipak Banerjee
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 29

MANUAL A. The following settings must be covered in ECC to allow any transfer of Data from ECC to APO.

Setting Define Logical system Assign logical system to client Specify SAP APO release Set RFC Destination Assign RFC destination to different application cases Set target system and Q type Set user parameters Define filter and selection block size Determine number ranges for parallelization Screen Shots Transaction code BD54 SCC4 or SALEBasic SettingsLogical SystemsAssign logical system to client NDV2 SM59 CFC7 CFC1 CFC2 CFC3 CFC8

1. Define Logical Systems (T code: BD54)

Define Logical Systems

2. Assign Logical System to Client (T code: SCC4)


SALEBasic SettingsLogical SystemsAssign logical system to client

Note: Logical System

Similarly the logical system for Client 800 is shown below.

3. Specify SAP APO release ( T code: NDV2)

Our logical system.

The logical system is mapped onto the release.

4. Set RFC Destination ( T code: SM59)

Select the logical client as you have created earlier. The screen shot is provided for your ready reference.

Put in the RFC destination name which should be the logical system of the destination client (with reference to client 800 i.e. the destination client is 100).Here we have selected AD1 100.Put in the connection type as 3.The drop down of which is shown below:

5. Assign RFC destination to different application cases. (T code: RFC7)

Our logical system

6. Set target system and Q type (T code: CFC1)

The Q-type has two options: Outbound Queues and Inbound Queues. We select Inbound Queues (I).

7. Set user parameters (T code: CFC2)


RFC mode has two selectable options 1. No calls and 2. Queued RFC (Q)

B. The following settings must be covered in APO to allow any transfer of Data from APO to ECC Activities 1. You call the IMG in SAP SCM. In the SAP Reference IMG, choose Integration with SAP Components Integration via APO Core Interface (CIF). 2. You make the relevant settings. Note that some of the basic settings are target-system-dependent or client-specific. These settings are not transported from the Customizing client to the productive client. This means you also have to make the settings in the productive client. i.e. SPRO Integration with SAP Components Integration via APO Core Interface (CIF).

The settings for the circled portions need to be maintained in client 100 (APO)

1. Name Logical systems.

2. Set up RFC destinations.

3. Assign RFC destination to various application cases

To check whether the connections are OK or not i.e. whether the systems are interconnected.

1. Apply the T code SM59.


2. The screen is provided for your ready reference.

3. Check on the Connection Test.

4. After the third operation check on remote Logon. It should take you to Client 100.

This proves that the connection is alright. Now we can transfer master data or Transaction data from SAP ECC to SAP APO and vice versa. We proceed to transfer a test material from 800 to 100. The test material is RN_TEST_1.

1. Use the T code CFM1 and fill in the details as follows:


Model Name: RN_TEST_1 Logical System: AD1 100 APO Application: Materials

Click on execute.

Click on Save.

2. Use the T code: CFM2. (Activate the model)

Click on execute.

Double click on New Status

Click on Start button

Click on ignore

Click on No. The information is displayed showing that the material has been successfully transferred.

Check for the material in APO. Use the transaction: /SAPAPO/MAT1

Production version (T code: C223)

Check on the material master for the production version (T code: MM02)

Use the transaction CFM1 to transfer work center. The screen shot is provided for ready reference.

Activate the model using the T code: CFM2

Double click on New status. Click on Start.

Click on Ignore and proceed.

Another information as shown will be displayed. Click on No and proceed.

Please note that the previous status has been checked in green.

Use the transaction /SAPAPO/RES01 to check whether the Work center has been transferred successfully.

Use the transaction CFM1 to transfer BOM and routing as defined in the production version. The screen shot is provided for ready reference.

Now, we need to activate the model: for this activity us the transaction CFM2

Click on execute

Double click on New Status and click on Start. All the information are set to Ignore or No.

Now we need to check APO master data with respect to BOM and routing. At first we need to check on the transaction /SAPAPO/SCC03(Production process Model)

1. Put in the Product (here RN_TEST) and the location (Plant 1000).Click on display
whence the plan number is generated. 2. Click on display once again whence it takes you to the next screen. The screen shot is provided for ready reference.

Click here to find the list of operations for routing

BOM components Work centers

All the details of the BOM and the corresponding routing can be obtained from the screen.

-------------------------------------------- END ------------------------------------------------------------