Itp For Valves
Itp For Valves
INSPECTION BY
RSL.NO DESCRIPTION OF ACTIVITY SUB RECORDS REMARK
VENDOR OIF/TPIA
VENDOR
Detailed Inspection & Test Plan after
1 issue of PO/PR/PS (including for bought - H R X
out items)
Hydrostatic Test, Heat Treatment, NDT,
2 Helium Leak Test, Cyclic test, Hyperbaric - H R X
test And Other Procedures
3 WPS, PQR & WPQ - H W/R X
Inward material inspection of Casting &
4 Forgings
Chemical, Mechanical, Heat Treatment,
a NDT, IGC & Other Properties as P R R X
applicable
b Visual & Dimension P H RW X
Inspection of Body and Bonnet Casting
c with NDT examination
P R R X
6 Final Inspection
Hydrostatic / Pneumatic Test / Cyclic test
a / Cavity Relief Test, Hyperbaric Test and P H RW X
Helium Leak test (as applicable)
b Visual / Dimension P H RW X
Functional Test for Actuator Operated
c Valves (As applicable) with satisfactory P H RW X
performance
d PMI Check P H RW X
e Strip Check P H RW X
f Final Stamping of Accepted Valve P H H X
Painting & Colour Coding (As applicable)
7 with Visual and DFT Check
P H RW X
Verification of packing list, item including
8 spare as per PO
P H W X
Final Stamping, Review Of Inspection
9 Documents
P H H X
10 Final Dossier P H H X
Page 1 of 2
INDICATIVE INSPECTION AND TEST PLAN
CLIENT: Black Mountain Complex ITEM NO: VALVES
PROJECT: Zinc Concentrate Plant DOCUMENT NO:
REVISION NO.0 ISSUE DATE: 02-July-2022
LEGENDS:
H:- HOLD (OFFER FOR WITNESS & OBTAIN CLEARANCE) , W:- WITNESS , RW:- RANDOM
WITNESS , R:- REVIEW , P:- PERFORM
1. This document describes the generic test requirements. Any additional test or Inspection scope if
specified in contract documents shall also be applicable. (Unless otherwise agreed upon)
2. Acceptance Norms for all the activities shall be as per PO/PR/STANDARDS referred there in /Job
Specification /Approved Documents.
Page 2 of 2