This document appears to be an assignment for a Civil Engineering Materials course at Universiti Teknologi MARA in Sarawak, Malaysia. It includes the student's name and ID, course details, a description of assignments to be completed with their point values, and appendices providing reference materials on topics like concrete mix design and properties.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
122 views6 pages

ECS246 Individual Assignment

This document appears to be an assignment for a Civil Engineering Materials course at Universiti Teknologi MARA in Sarawak, Malaysia. It includes the student's name and ID, course details, a description of assignments to be completed with their point values, and appendices providing reference materials on topics like concrete mix design and properties.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

UNIVERSITI TEKNOLOGI MARA

FAKULTI KEJURUTERAAN AWAM


UiTM CAWANGAN SARAWAK
KAMPUS KOTA SAMARAHAN

COURSE: CIVIL ENGINEERIN MATERIALS

COURSE CODE: Ecs246

PROGRAM CODE: EC110

SEMESTER: MARCH-JULY 2022

STUDENT - ONON&
pEBKA DEIRDRE
NAME
STUDENT ID
2010613238 GROUPECno49.
LECTURER Z0E DAVYLYN ANAC NYIN
NAME

DESCRIPTION MARKS CO2:PO5

cONCRETE VOLUME 15

cONCRETE MIX DESIGN FORM 30

CONCRETE MIX DESIGN 55


APPENDICES

TOTALMARKS PERCENTAGE

100 10

Prepared By: Vetted By:

Name: JOE DAVYLYN NYUIN


Name C. MSLHAMAB NOHAIDZAT GIN MOHAMED RASHID
Pansyarah Kansn, Fakultl Kejuruteraan Awam
Date: 9 June 2022 Date: Universitd Teknologi MARA
Kampus Paslr Gudang Johor
9/6/2022
Cnfhdenng the Conrete watage i &7 Calculote the vølume Cvncvete vemuived. (15marte) .

Volume
3
6Cubts 6 x (0.i5 0.15 x o.i5) 0. 02015 m
x

3
3
bemc 1 3x (0.I x0. x 0.6) 0.018 m

Total volurme
D. 02025 0 . 0 8

0 03825 +0-00306
= 0.0413| m3
ASSIGNMENT MAR-JULY 2021

APPENDIX 1 (1)

Table 2.0: Approximate compressive strengths of concrete mixes mode with a free-water/
cement ratio of 0.5

Type of Compressive strength' (MPa (psi) at the age of (days):


Type of
coarse
cement 28 91
aggregate
Ordinary
Portland
(Type l) Uncrushed 22 (3200) 30 (3200) 42(6100) 49 (7100)

Sulphate-
resisting Crushed 27 (3900) 36 (5200) 49 (7100) 56 (8100)
Portland
Type V
Rapid- Uncrushed 29 (4200) 37 (5400) 48 (7000) 54 (7800)
hardening
Portland
Crushed 34 (4900) 43 (6200) 55 (8000) 61 (8900)
Type l)

Table 3.0: Approximate free water content required for various level of workability
according to the 1988 DOE method (Source: Neville, A.M., 1995, p: 765)

Aggregate Water content, kg/m (lblyd*) for:

Max.
Slump, mm 0-10(0 10-30 30-60 60 180 go-i00
size mm Type (in) 1/2) (1/2-1) (1-2 %) (2 %-7)
Vebe test, s >12
(in) 6-12 3-6 0-
Jncrushed 150(255) | 180 (305)| 205 (345) 225 (380)
10 (3/8)
Crushed 180 (305) 205(345) 230 (390) 250 (420)
Uncrushed 135(230) 160 (270) 180 (305) 195(330)
20 (3/4) 170 (285)
Crushed 190 (320) 210 (355)225 (380)
Uncrushed
40 (11/2) Crushed |115 (195) 140 (235) 160 (270) 175 (295)
155 (260) 175 (295) 190 (320) 205 (345)

M5)lox)
ASSIGNMENT MAR-JULY 2021

APPENDIX 1 (2)

90
Starting line
using data
from Table 2
80

70

60

50

40

30F

20

10F

l
0.3 0.4 0.5 5 0.6 0.7 0.8 0.9
Free-water/cement ratio
ASSIGNMENT MAR-JULY 2021

APPENDIX 1 (3)
free-waterl cement ratio.
Figure 1: Relationship between compressive strength and

2700

2600 Relative density of


combined aggregate
lon saturated and
surface-dry basis)
2500
2.9
82400 ASSumed for crushed 2.8
ASSumed for aggregates 2.7
uncrushed
2300 aggregates 2.6
2.5
2200
2.4
2100L
100 120 140 160 180 200 220 240 260 28

Free-water content tkg/m )

Figure 2: Estimated wet density of fully compacted concrete

Maximum aggregate sizel 10mm

Slump: 0-10mm 10-30mm 30-60mm 60-180mm


Vebe time:>]2s 6-125 3-6s -3s-

bO

UOT

10
0.2 0.4 0.6 0.8 0.2 0.4 .6. 0.8 0.2 0.4 0.8 0.8 0.2 0.4 0.6 0.8

Free-water/cement ratio
ASSIGNMENT MAR-JULY 2021

APPENDIX L4)
Maximum agqregata size|20mm
Slump: 0-10mm 10-30mm
Vebe timo: >12s 0-00mm
0 0-128 3-6s 60-180mn
p3

15

40 40
60
Ei00
o80100o 80 L1001 B100
10
0.2 0.4 0.6 0.8 0.2 0.4 0.6 0.8 0.2 0.4 0.6 0.8 0.2 0.4 0.6 0.8

Free-woter/cement ratio

Maximum aggregate size: 40 mmm


Slump: 0-10mm 10-30mm 30-66Omm 60-180mm
Yebe time:>12s 6-12s 3-6S 0-3s

15 15.

40 40
80
20 E80E100
100
00T
100.2 0.4 0.6 0.8 0.2 0.4 0.6 0.8 0.2 0.4
0.6. 0.8 0.2 0.4 0.6 0.8

Free-water/cement ratio

Figure 3.0: Recommended proportions of fine aggregate according to percentage


passing a 600 um sieve

You might also like