Yousif Aysar Yas Basra I Raq (+964) 7750001376
Yousif Aysar Yas Basra I Raq (+964) 7750001376
Yousif Aysar Yas Basra I Raq (+964) 7750001376
Basra ‐ I raq
(+964) 7750001376
[email protected]
About Me:
Structural Engineer I Graduated In 2016 From Mustansiriya University I Worked For Several
Companies And Several Specializations Including Construction Engineer And Senior Qa/Qc Engineer
And I Have Six Years’ Experience In The Implementation Of Construction Projects And Oil Well Pads
And Earthworks And Steel Structures And My Strengths In The Work Is As An Engineer
Implementation And Qa/Qc Works And I Aspired In The Future To Became Structural Designer For
Concrete And Steel Structures.
Objective:
Seeking A Position in An Organization Where I Can Utilize My Background in Civil Engineering
And Management to Contribute Towards Mutual Growth.
Education:
Degree of Bsc From Al-Mustansiriya University 2012 –2016 College of Civil Engineering,
Structural Department.
I Got First Place in The Academic Achievement of The Department & The Fifth Place on My
University with An Overall Average (83.6) For Four Years.
Graduation Project are Structural Design of Cable Stayed Bridge Using Computer Program
(Sap2000)
Key Responsibilities:
Ensuring That The Quality Of Work Performance IS Done As Per Client Requirements
And Standards.
Monitoring And Reviewing The Implementation Of The Epc Contractor’s Site
Quality Management System.
Preperation of Method Statement and Quality Assurance procedures for all the
activities as per the Contract agreement.
setting up Quality Control Laboratory as per the contractual requirement.
Preparing ITP and all other Quality Assurance/Quality Control related Inception reports.
Conducting Tests on Aggregate, Soil, Cement, Concrete ,soil, pipes etc... As per the approved ITP.
Assisting QA/QC In-Charge in Management review meeting and solving the issues related to
Quality Assurance & Quality control.
Conducting various training program for the supervisor, site engineer in order to provide the
knowledge of the work activity as per the method statement to ensure quality work at site.
Issuing Internal NCR’s for Site team on record of abortive works and follow-up for Corrective
action and preventive action (CAR, PAR) for immediate closure.
maintaining quality of concrete like slump, density, air void, sampling concrete, temperature test,
and casting cubes at site, as per QCP and project specifications
Key Responsibilities:
Key Responsibilities:
Key Responsibilities:
Key Responsibilities:
Check the Bm, Elevation, Layout Coordination, Preparing Shop Drawings As Needed
To Ensure Proper Installation Of Material.
Make Daily Report for Contractor and Follow Up the Updates of Work Progress.
Working with Construction Manager to Prepare with Vendors to Ensure Accuracy.
Responsible for Preparation of Daily Field Reports to Construction Manager.
Certificates:
Training Courses:
Training and Take A Course on Infrastructure Works Sewer& Storm and Drinking Water
Completed 4 Story Building (Solid Slab) With Basement and Pool In Baghdad
Completed 9 Story Building (One-Way Ripped Slab) With Basement in Al Arasat Karada, Baghdad.
Completed Rehabilitations Work for Defac Truss in Kuwait Energy Company at Al Siba Oil Field In Al
Basra.
Completed Al Alaam Sport Centers Commercial Shops and Offices (Surveying Works Only).
Completed 3 Well Pad In Majnoon Oil Field With The Client From Kbr Company In Al Basra.
Completed the Cpf - Early Civil Works and Steel Piling Works in Majnoon Oil Field with The Client from
Petrofac Company In Al Basra.
Completed All the Internal Rigid Pavement in Basmaya Gas Power Station in Baghdad.
Completed 4 Warehouse (Portal Frame) And (Gable Frame) For Rand Company in Baghdad.
Completed 2 Steel Structure Building for Rand Company in Baghdad.
Completed 4 Warehouse (Portal Frame) With Internal 2 Story Steel Building For Al Fakher Company in
Baghdad.
Completed 4 Story Building (Flat Slab) For Al Fakher Company in Baghdad.
Completed 2 Concrete Water Tanks For Al Fakher Company in Baghdad.
Completed 2 Sector (17th & 18th) Roadway (Earthworks and Flexible Pavement) Works in Jawhara
Baghdad Project.
Completed More Than 1700 House With 4 Types House and Villas (100m2, 150m2,200m2,400m2)
Foundation and Structural Works Only in Jawhara Baghdad Project.
5 Pump Station for Sewage and Storm Water with Civil and Mechanical Works Only in Al Qurna-Basra.
Completed Some Infrastructure Works for Sewage, Storm and Ground Water Network With 4 Types of
Pipes (Grp, Hdpe, Upvc, Prf) In Al Qurna-Basra.
Working Now in Majnoon Oil Field on Soar Gas Treatment Facilities (Sgtf) Project and Central Planet
Facilities (Cpf2)
Memberships:
Personal Details