5 KL GLSR: Scheme
5 KL GLSR: Scheme
outh
Steps©300c/c /
150
10 mm 150/c
Note:- SCHEME :
1. Gradeof Concrete :M30
2. Grade of Steel (Tor 40) : Fe415
3. Clear minimum cover
slabs :45MM
side walls :45MM 10 KL GLSR
4. SBC : 10T/SOM
5. All dimensions are in 'mm' unless specified.
6. The Steel should not be overlapped
at the junction points
7. Not more than 1/3rd of the bars should
be curtailed at a given section
10mm @ 150 _ cfcRadial
m
from end of projection CI man holes
0.9'm 2Nos
Top Slab Top slab(150)
Projection 8mm @ 150 c/c
Circumferential
Phenail with
r
fly proof v ntilator
150
• •
Betl/nouth
9 00
7
G.1 Steps@300c/c
10mm @ 150 c/c 150
A\ Both ways 10 mm @ 150/c
•■•
200
e 1 - 4-8 300
SAND FILLING 300
Ld 00
3600
Bottom mesh bothways
10 mm 150 c/c • 3101143
Note:—
1. Gradeof Concrete :M30 SCHEME :
2. Grade of Steel (Tor 40) : Fe415
3. Clear minimum cover
slobs : 45MM
side walls : 45MM
4. SEC : 10 T/SQM
5. All dimensions are in 'mm' unless specified.
6. The Steel should not be overlapped
at the junction points
7. Not more than 1/3rd of the bars should
10 KL SUMP
be curtailed at a given section
8. As per IS 3370, the maximum spacing of
Reinforcement should not exceed 300mm or
thickness of section whichever is less
NW:— Providing Water Supply Scheme
10mm © 150 c c Radial
from end of projection CI man holes
cl 2Nos
Top Slab Top slab(150)
Projection 8mm © 150 c/c
Circumferential
Phenail with
r
fly proof v ntilator
150 EM.
Bell ifnouth
900
G.I Steps©300c/c /
10mm © 150 c/c 150
Both ways 10 mm © 150/c
\
MEOW .• I
t I
200
..•.... , . ' - ' 144:8 , .. •. 300
SAND FILLING 300
Ld 200
3600
Bottom mesh bothways
10 mm 150 c/c
Note:— SCHEME
1. Gradeof Concrete :M30
2. Grade of Steel (Tor 40) : Fe415
3. Clear minimum cover
slobs : 45MM
side wells : 45MM
4. SBC : 10 .1/SOM
5. All dimensions ore in 'mm' unless specified.
12 KL SUMP
6. The Steel should not be overlopped
at the junction points
7. Not more than 1/3rd of the bars should
be curtailed of a given section
8. As per IS 3370, the maximum spacing of
Reinforcement should not exceed 300mm or
thickness If section whichever is less
NW:— Providing Water Supply Scheme
10mm @ 150 c/c Radial
CI man holes
.il#P9 from end of projection 2Nos
Top Slab 1---4411ar a_cm. Phenail with Top slab(150)
8mm @ 150 c/c
Projection
Circumferential 7
fly proof v ntilator
--
150 isommo•II
moos —9 1
• T6o
Bell outh
900
GI 10mm @ 150 c/c
Steps@300c/c__\
150
/A\ Both ways Li— 10 mm © 150/c
4000 VerticalstelY& outerface
115C
4
Top mesh bothways 8 mm 153c/c
10 mm @ 150 c/c Hoop rings inner
RCCIadder
1 Omm491 50c/c & outer race
haunch bars 400mm wide
/
• 200
•
300
SAND FILLING i *..i 30
Ld 200
4600
Bottom mesh bothways
10 mm 150 c/c
Note:— SCHEME :
1. Gradeof Concrete :M30
2. Grade of Steel (Tor 40) : Fe415
3. Clear minimum cover
slabs : 45MM
side walls : 45MM
4. SBC : 10 T/SOM
5. M dimensions are in 'rnrri . unless specified.
6. The Steel should not be overlapped
at the junction points
20 KL SUMP
7. Not more than 1/3rd of the bars should
be curtailed at a given section
8. As per IS 3370, the maximum spocing of
Reinforcement should not exceed 300mm or
thickness of section whichever is less
I
NW:— Providing Water Supply Scheme
1.--5
,
10mm © •KJ0442adial
from end of projection CI man holes
1 piOeyrn cau- 2Nos
Top Slab Top slab(150)
Projection 8mm © 150 c/c
Circumferential
Phenail with
r
fly proof ventilator
150 imomma
mous!.
■ fr-
outh
900
G.L 12.5 Steps©300c/c
10mm '0 ivra c/c 150
Both ways 10 mm 150/c
4500 Vertica4le& outerface
145C
Top mesh bothways
8 mm 150c/c
10 mm @ 150 c/c Hoop rings inner
RCCladder
1 Omm01 50c/c & outer face
haunch bars 400mm wide
150
200
300
SAND FILLING 300
Ld ?00
4600
Bottom mesh bothways
10 mm 150 c/c
P.2-, 4
s1 .3
Note:—
1 Grodeof Concrete :M30
2. Grade of Steel (Tor 40) : Fe415 SCHEME :
3. Clear minimum cover
slobs : 45MM
side walls
4. SBC
: 45MM
: 10 T/SQM
5. All dimensions are in 'mm' unless specified.
30 KL SUMP
6. The Steel should not be overlapped
at the junction points
7. Not more than 1/3rd of the bars should
be curtailed at a given section
8. As per IS 3370, the moximum spacing of
Reinforcement should not exceed 300mm or
thickness of section whichever is less
NW:— Providing Water Supply Scheme MVS -ro PA DrrIANA .01 1 141
- - - -
outh
900
G.L Steps©300c/c
10mm © 150 c/c 150
ATI Both ways 10 mm 150/c
T7
Ld
ili — 5600
0
00 f
Bottom mesh bothways
10 mm 150 c/c /t58
) 4 4)
CONDITIONS
1. Gradeof Concrete :M30 Note:– As per IS 3370, the maximum spacing SCHEME : MVS to PADMANA8HAM
2. Grade of Steel (Tor 40) : Fe415 of Reinforcement should not exceed
3. Clear minimum cover
slobs :45MM 300mm or thickness of section whichever LOCATION:
side walls : 45MM is less
4. All dimensions are in 'mm' unless specified. SBC : 10 T/SQM 04DeztigiN§
5. The Steel should not be overlapped
at the junction points
6. Not more than 1/3rd of the bars should
be curtailed at a given section
40 KL SUMP
8mm dia radially & circumferentially for both directions
12:5 c/c curtail alternate radial bars © 1.75m & again Top dome 125mm thick
curtail alternate bars 0 2.65 m from the edge and continue
the remaining bars
Phenail with
r fly proof ventilat
CI man hole
2Nos)
Top dome UPTO 1M(150 th.)
Abb.
RCCIadder
0
0 40 m wide Ring Beam 200x250
c\J
main steel 4-12mmilr
S 2 L-8 mm -gT @150 c/c
2,5 0
0 outh
Steps©300c/c
—150 Thick Side Wall
900
250
,• 300 CC(1:4:8)
Sand Filling 300 Sand Filling
Ld
40d 7600
Note:
1.Grade of Concrete:M30
2.Grade of Steel(Tor 40):Fe415
3.Clear Minimum Cover
slobs : 45 mm 4\V P TY) viLdcf
sidewalls : 45 mm
85KL SUMP
Beom : 45 mm
4. SBC : 10 t/sqm
5. All dimensions are in 'mm' unless specified PP
6. The steel should not be overlapped of the junction points
-)11 1)
7. Not more than 1/3rd of the bars should be A5113 ‘2A".
curtailed at a given section
11..1 1.
(I)
ii RCCIadder
400mm wide Ring Beam 200x250
20 ain steel 4-16mmv
*-2 L-8 mmv ©150 c/c
ig
6"D`10 B <73 b-
-...., b V 0
Steps©300c/c
—150 Thick Side Wall
900 \
G.I 1 :0
A\ 10 mm © 150 c/c
2750 Vertical Outer & Inner face 8 mm 7 c c Hoop rings
inner&out r face in staggereu
150
I ncthoac
lornTio
Top mesh bothway-
.46,10 mm © 125 c/.
fashion
200
bars
250
. . ...._ .,:-..,..: - ...,..,•,,,. •-• .- 300 CC(1:4:8)
Sand Filling 300 Sand Filling
mirsou
40d 8100
Bottom mesh bothways
All dimensions are in 'mm'
10 mm 125 c/c
Note:
1.Grade of Concrete:M30
2.Grade of Steel(Tor 40):Fe415
3.Clear Minimum Cover
slabs : 45 mm
sidewalls : 45 mm
Beam : 45 mm
4. SBC : 10 t/sqm
100 KL SUMP
5. All dimensions ore in 'mm' unless specified
\‘)
6. The steel should not be overlapped at the juriction points
RCCIadder
400mm wide Ring Beam 250x250
25 main steel 4-16mm7
4 66.
2 L-8 mm yr ©150 c/c
.a6i) go. outh
Steps©300c/c
—200 Thick Side Woll
900
G.I 8000
/A\ 10 mm © 200 c/c
2850 Vertical Outer & Inner face 8 mm OOc/c Hoop rings
inner •uter face in stagger
Top mesh bothways fashi.
10 10 mm ( 125 c/c 200
150 allrnm0150c/c
hauncbrs
250
•
!.• 300 CC(1:4:8)
Sand Filling 300 Sand Filling
Ld
40d 8700
Note:
1.Grade of Concrete:M30
2.Grade of Steel(Tor 40):Fe415
3.Cleor Minimum Cover
slabs : 45 mm
sidewalls : 45 mm
Beam : 45 mm
4. SBC : 10 t/sqm
120 KL SUMP
5. All dimensions are in 'mm' unless specified
Top dome(125)
it
0 Beam 300x300 main steel 4-16mm
tO
co 2 L-8 mm 0150 c/c
300
f
500/
Steps©300c/c
Lal 10 mm © 200 c/c 0 mm © 100
vertical in & outerface Hoop rings
11 000 1 inn erArn r Cl/ 0/F Pipe Line
face in 200 Inlet connections
Top mesh bothways staggered fut
2100 10 mm 125c/c
RCCladder
40mwide duck foot bend
• 250
•;• 300 c.c(1:4:8)
L = 4C,d 200
12000
bottommesh bothways
10 mm 1;1- 125c/c
NOTE :-
1. Grade of concrete : M30
2. Grade of steel(Tor 40) : Fe415
Note:— As per IS 3370, the
3. clear minimum cover maximum spacing of
V\ Acp -MArag ( 1
slabs : 45 mm
reinforcement should not
sidewolls : 45 mm
Beam : 45 mm exceed 300 mm or thickness
4. SBC : 18 t/sqm of section whichever is less P'
5. All dimensions are in 'mm' unless specified
psot eA.Przu-sIgf
1
4.r-A
6. The steel should not be overlapped at the junction points Aos)1 5 2g6\
7. Not more than 1/3rd of the bars should be 200KL SUMP
curtailed of a giien section
8mm dia radially and circumfrential for both
directions 0125mmc/c Curtail alternate
bars@ 2.5 m and again Curtail alterna Phenail with
bars03.75 mts and again from the edge
and continue the remaining bars f fly proof ventilator
CI man hole
2Nos)
Top dome (125 mm)
125 mm thick
Top dome Top beam (bxd) 300x300
main steel 4-16mm
2 L-8 mm@150 c/c
300
Steps©300c/c
500 10 m m 150 c/c inrvand CI D/F pipe line
O u :er face Inlet connections
G.l 10000
/A\ 1 2mm01 25mmc/c
3650 Hoop rings inner& 250mm side wall
outer faces in
Staggered fashion
Top mesh bothways
RCC Ladder duck foot bend
10 mm 125 c/c
15 400 mm wide
250
f 300 CC(1:3:6)
200
10800
Haunch bottom mesh both ways 10mm dia ©125mm c/c
200x200
Note:—
1. Gradeof Concrete :M30 SCHEME : MVS to Kondapuram and other
2. Grade of Steel (Tor 40) : Fe415 habitations
3. Clear minimum cover
slabs : 45MM
side walls
Beam
: 45MM
: 45MM 250 KL SUMP if App/oved
4. SBC : 10 T/SQM
5. All dimensions are in 'mm' unless specified.
6. The Steel should not be overlapped M
at the junction points
7. Not more than 1/3rd of the bars should
1'5 AN :\170611)
be curtailed at a given section
8. As per IS 3370, the maximum spacing of 1/37 C
Reinforcement should not exceed 300mm or
thickness of section whichever is less