TANK
4. ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS. ANY RELOCATIONS REQ'D FOR PROPER EXECUTION OF OTHER TRADE SHALL BE W/
PRIOR APPROVAL OF THE EMPLOYER'S REPRESENTATIVE.
HB
LAUNDRY AREA
5. IT IS NOT INTENDED THAT THE DRAWINGS SHALL SHOW EVERY PIPE, FITTING, VALVE AND APPLIANCE. ALL SUCH ITEMS WHETHER SPECIFICALLY HB District / City / Municipality
MENTIONED OR NOT, OR INDICATED ON THE DRAWINGS SHALL BE FURNISHED AND INSTALLED. IF NECESSARY, TO COMPLETE THE SYSTEM IN
ACCORDANCE WITH THE BEST PRACTICE OF THE PLUMBING TRADE AND TO THE SATISFACTION OF THE EMPLOYER'S REPRESENTATIVE.
4000
4000
HB
6. PIPING SHALL BE PROPERLY GRADED OR PITCHED TO ENSURE EASY DRAINAGE. THE MINIMUM SLOPES SHALL BE AS FOLLOWS: HB
7. EXACT LOCATION OF EXISTING UTILITIES ( WATERLINES, SEWER LINES, MANHOLES, AND STORM DRAINAGE LINES ) SHALL BE VERIFIED BY THE
CONTRACTOR AT JOBSITE.
LAND USE & ZONING
8. THE PROPOSED UTILITIES SHALL BE MADE TO CONFORM TO THE ACTUAL LOCATION, TAPPING POINT, DEPTH AND INVERT LEVELS OF ALL EXISTING
PIPES AND STRUCTURES AS VERIFIED BY THE CONTRACTOR.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL GOVERNMENT / LOCAL CONSTRUCTION OPERATION PERMITS. OTHER PERMITS
REQUIRED BY ANY REGULATORY AGENCY.
Ø100 SEWAGE DISCHARGE PIPE TAP
10. EXTERIOR UNDERGROUND RAMP DISCHARGE PIPES SHALL BE HDPE PIPE & FITTINGS
TO CITY SEWER LINE
11. ALL WORKS SHALL BE DONE WITH UTMOST CARE AND HIGHEST LEVEL OF QUALITY AND SAFETY; WITH NO ADVERSE DISRUPTION TO EXISTING
UTILITIES AND / OR OPERATION.
LINE & GRADE
12. ANY EXISTING UTILITIES EQUIPMENT, PIPING OR PAVED AREAS AFFECTED SHALL BE RESTORED TO ORIGINAL CONDITION AND BE PROPERLY
13.
SCHEDULED PRIOR TO ACTUAL WORK WITH THE OWNER OR HIS AUTHORIZED REPRESENTATIVE.
ALL PIPES PENETRATING THRU WALLS, CEILING, FLOORS SHALL BE ACOUSTICALLY SEALED WITH STC FIRE RATED MATERIALS. FRO
1 COLD WATER LAYOUT 2 WASTE PIPE LAYOUT
ME
XIST P 1 SCALE
P 1 SCALE
14. EACH HORIZONTAL DRAINAGE PIPES SHALL BE PROVIDED WITH CLEANOUTS AS FOLLOWS: ING
WAT
ER
SUP
PLY
a. AT EVERY 15.0 METER LENGTH OR A FRACTION THEREOF,
b. AT EVERY CHANGE IN DIRECTION GREATER THAN 45 DEGREES,
WA
c. AT ITS UPPER TERMINAL TE
RT ARCHITECTURAL
AN
15. ALL VERTICAL PIPES IN THE CHASE (SHAFTS) SHALL BE ANCHORED IN WALLS OR COLUMNS. KPR
TAESS
WP NK UR
16. ALL SANITARY AND STORM DRAINAGE PIPES SHOWN IN THE DRAWINGS ARE LOCATED BELOW SLAB AND ALL PLUMBING, UNLESS OTHERWISE E
SPECIFIED.
17. ALL DIMENSIONS SHALL BE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED IN THE DRAWING.
18. ALL PIPE SLEEVE LOCATIONS SHALL BE PROPERLY COORDINATED W/ STRUCTURAL DRAWING. H
HB B
71
19. WHERE SERVICES PENETRATE ANY FIRE RATED BARRIERS, THE CONTRACTOR SHALL SEAL THE PENETRATION WITH THE USE OF APPROPRIATE H
HB B
26
HB
MATERIALS TO ENSURE THE INTEGRITY OF THE FIRE BARRIER. H
HB
HB B
20. ALL PIPING PASS THRU-SEISMIC GAP SHALL BE PROVIDED W/ SUITABLE FLEXIBLE JOINT. LA
HB
HB STRUCTURAL
UN
DR
Y AR
EA
0.30m
20 32 -
25 40 -
EXISTING SOIL PIPE -
ELECTRICAL
PIPE UP -
32 50 -
Ø
TO 100 S
PIPE DOWN -
40 63 -
CITY EW FLOOR/GROUND CLEAN OUT BRASS
50 75 -
150
-
-
125
180
PI PE T DRAIN PROVISION BRONZE
200 - 225
AP GREASE TRAP STAINLESS STEEL
PLUMBING PLAN
LABADIVA LAUNDRY SHOP MS. JOANNA ALFONSO P
-
WATER LINE LAYOUT
WASTE PIPE LAYOUT
ISOMETRIC VIEW 1 1
PROFESSIONAL IN-CHARGE ADDRESS: ADDRESS:
PLUMBING
18A ROTC STREET, ROSARIO PASIG CITY 18A ROTC STREET, ROSARIO PASIG CITY PLAN