The document provides details about aircraft maintenance at an airport hangar. It describes the maintenance work performed, which includes inspecting and performing maintenance, preventative maintenance, and alterations on aircraft and aircraft systems. The hangar layout includes rooms for equipment storage, repairs, painting, tools, and components. The hangar is 105m wide and 75m long, accommodating 2-4 aircraft. It has a steel sliding door and security doors. The hangar functions to shelter aircraft from weather and serve as a place for maintenance, repair, manufacturing, assembly and storage.

Uploaded by

ikke novianti
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views6 pages

Tugas Fom

The document provides details about aircraft maintenance at an airport hangar. It describes the maintenance work performed, which includes inspecting and performing maintenance, preventative maintenance, and alterations on aircraft and aircraft systems. The hangar layout includes rooms for equipment storage, repairs, painting, tools, and components. The hangar is 105m wide and 75m long, accommodating 2-4 aircraft. It has a steel sliding door and security doors. The hangar functions to shelter aircraft from weather and serve as a place for maintenance, repair, manufacturing, assembly and storage.

Uploaded by

ikke novianti
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Nama : Djanli Wiratami Waiulung

NIT : 170709324

Kelas : Golf

Tugas : FOM

Task A :

1. Airplane maintanance- Airbus in individual parts


A colossus is being disassembled 350 mn are in action every detail has to be
controlled because what looks like a scratch can have serious consequence. It
some it may only be a scratch but for us it’s serious structural damage. The six
of the noble first class come out in the economy class every seat is removed
and reupholstered. This reveals a mile-long network of cables there’s separate
hangar for the engine check. Even the tank is inspected from the inside not
harmless. Only 5 weeks to take the plane apart completely and then
reassemble it with a new interior. This long-haul aircraft has barely unloaded
passengers from Bangkok now it goes to the technical headquarters in
hamburg for check up. In the cabin there are new chairs and TV screens that
means 100 a new cables befpre that the old ones have to be taken out. More
than thirty miles of cables run through the cabin. A single cable can keep you
busy the the whole shift.
For 3 hours now danya has been searching for the end of the cable
and he like it. Norman wintwe has the most dangerous job his workplace for
today the interior of the left wing where norman is now crawling there are
usually more than 50.000 liters of kerosene. The technicians accelerate the
plane up to eighty percent of its maximum power in the air this power will
propel it to speeds of over five hundred thirty four miles per hour. Only the
brakes and the wheel chocks prevent four giant from racing against the wall
risky maneuver. The plane is given clearance for the perfect condition of the
machine, her finger will now stand for the perfect condition of the machine
with his good name until the next check in five years. After a short test flight
the airbus A340 in back service next stop south Paulo, Beijing or Delhi
2. Airplane Heavy Maintenance_ Mega Pits Stops

What does it take strip down and reassemble overall the world smart everyone to the
list at the very least it's a major inspection 25000 man hours official name no matter
how small the repair or replace screw perform any repairs needed on the wings never
be sure what kinds of problems a challenging job florence in Anchorage a spare pair
of hands nationalities are standard reverse parking playing Reliance on turning the
wheel at precisely the right time kilo Romeo stays on the yellow line in the middle
will it fit in the van lil Romeo open iHeartRadio where is a 1043 for the next
incoming progesterone cream goalies for all department stores at the same time then
the team slides the checks under the wings operators have form elevates kilo Romeo
7.5 of 4 are 5000 Manor project manager has already performed the interior start
removing old carpet scores I'm supposed to see if it is where every every movement
around 750,000 passengers have travelled the world on the seats the main thing they
leave behind all their own repairs on site airlines from all over the world can you
have something broken you have to check on one of us part number are there and
replace inside the hangar... long press the key to edit stamp - this is just an idea ,
freaking his team are still removing the turbines what's the forecast stripping the outer
shell for damage caused by bad weather flooring how many ounces all right no
seriously are you really ready for this is what I've been waiting for. Call home phone
otherwise they'll follow up schedule good morning how are they before normally
wish I knew what it means to be done and the every job has its Joker number like the
inspection of hoisting for instance this is also a mandatory process in the eye it's so
hard there's so much it wouldn't have a loose in it the ring is mounted to the wink
thanks for everything today meanwhile on top of the wing all over the world it's
impossible to know every detail small items repairs delivery call Chris some heavy
machinery the crane has been calibrated precisely to the weight of the plant 70
Surprise Lake City all the way goes in the air crossword clue center of gravity take
care of the tiny details for example the screws are the smallest components in the
aircraft also repairs the metallic components in the cabinet repair Chula Romeo show
working in a male-dominated environment go to give free food on get your head
straight Beyond Olympia free to be one of The Voice andres team is still struggling
the workers have to lift and pull it away from this final component 17 is removed and
number to all of the parts and I step start repairs in the seat shop 15 days of work
every season has its assigned place as the customer expects the plane to be essentially
the same as before nationstar czech Festival who is starch checking functional of the
face set alarm larger scale damage fortunately for the airline already been scheduled
for kilo Romeo to go before the plane is delivered to the airline inspection place items
need to be like today I wonder if they're still one dangerous job left to do the fuel
tanks are located in the wings in at the bottom of the fuselage if they contain mexican
pointy corner of every rivet it doesn't take long for such defects to expand one thing
I'm bored outside ruben finds a problem everywhere ruben soaks up the Splitters what
is vacuum pump in total right on schedule you still working on the inspection face
400 kilometers this is where it all comes together entertainment systems for the
smoke detectors so what's the difference geraldine long press the key to edit stamp -
this is just an idea **l has to put the plane back together again as quickly manual car
move everything go see hopefully it doesn't happen pokemon you might have to go
back into I was trying to see whether changes can deliver on sometimes this is your
night beautiful install something before another one you might end up removing it
chinese crew and the structures team are making up for lost time clammy forehead
engineer making sure it's safe problem area 2 address 39 kilo

3. A tour around Emirate’s aircraft maintenance

It can be hard keeping up with the world's biggest International Airline Emirates
Airline continues to expand its Fleet let's meet at the one of the leading airlines in the
world to one of the world's best is engineering department people in Engineering
Building at the northeast corner of Dubai International Airport Emirates engineering
which includes to 1200 Engineers along with many others with expertise in
neighbor's disciplines such a software is responsible for making sure the aircraft does
it stay on the ground for long what's wrong with the morals of Columbus's small-time
having the maintenance done wish you could nearly everything from engine thrusters
structural components wheels and even nuts and bolts up to 97% on site to Airbus
A3806255 the world's largest e383 Route 66 the aircraft a complete refurbishment
means tripping there across the mole season in Flight amenities there are stuff
constantly checking and Servicing Inc five coffee machines while subcontractors
regularly check the durability of treacherous and even maybe in two beavers are
repainted it is pretty and controls one side of paint and workers on the job 24 hours a
day for an Airbus A380 freaking over 20 days and 24 hours a day each aircraft in
Emirates Fleet of 238 needs to be painted in such a way that the logo on the side and
the UAE flag on the tail all line up when they're Cross Keys part of the airport and
she didn't really as off for golf news
Task B :

1.Identify the maintenance works, hangar layout and function

Maintanace work : Aircraft maintenance technician refers to a person who is


qualified to carry out aircraft maintenance. Their job is to inspect and perform or
supervise maintenance, preventive maintenance, and alteration of aircraft and aircraft
systems.

Hangar layout : From the picture it can be concluded that on the left side there are
several rooms including additional facilities for keeping equipment, dress rooms,
reparation painting areas, tools stores and component cleaning areas. Then the bottom
side of the picture shows that there are several rooms, including a lavatory, lift, line
maintenance manager and assistance manager, engineering planning, QC DEPT
room, AV station, A & P work station, technical compressor air room, GSE
workshop, main store, training & meeting room, HRD finance room. On the left side ,
there are several rooms including an office store, inspection room, hazmat room and
U / S eqiuipment store. in the middle of the building there are two trench. and the
hangar above can accommodate 2 to 4 aircraft. This hangar is equipped with a steel
sliding door and a steel bliding door. There is also a security door. Around the hangar
there is also a road made of asphalt. This hangar is 105 M wide and 75 M long.

Hangar function : The hangar is used as aircraft protection from the weather,
including direct sunlight, and also the hangar serves as a place for maintenance,
repair, manufacture, assembly and storage of aircraft at the airport.

2. Symbol

a. APAR (Alat Pemadam Api Ringan) atau fire extinguisher , lightis a device used to
extinguish fires or control small fires.

b. X-Ray Security

X-Ray Security is a machine to visually detect all luggage of aircraft passengers that
can endanger passenger safety.

c.Sliding Steel Door

Sliding Door is a type of door that moves sliding on the rail (track). At the top
mounted hanger (hanger) wheeled sliding on rails (track). At the bottom, given the
guide rail (guide) that runs on the canal. for entered area in hanggar.
d. Handy Talkie

HT (Handy Talky) is a communication tool similar to a cell phone that can


communicate two or more people using radio waves and is often used for temporary
communication because the channel can be changed at any time.

e. Use stairs in fire

This emergency staircase is usually used as an evacuation gate if an accident occurs


in the building.

f. First Aid Kit or PP

Is a box containing medicines and equipment that support first aid activities which
include bandages, mitella, red medicine, exposed scissors, and others.

g. Stop contact button

Stop contact button is that serves to turn something on or something off.

h. Walkie Talkie

Is a handheld communication tool that can communicate two or more people using
radio waves.

i. Emergency Access

Emergency Access is a specially designed rescue route that connects all areas to a
safe area as a gathering point for residents or communities in the area.

j. Preparation Painting Area

Preparation Painting Area is an area for painting or repairing aircraft paint.


3. Understanding what are the party should be stated in the Emergency Response Plan

The steps that need to be taken for emergency response planning are: Identification of
emergencies: The first step towards planning an emergency response is the
identification of all emergency situations that the organization presents during
working hours or after working hours. Criteria for company location, nature of
company work, machinery or chemicals used, manufactured, or stored on site. List all
potential emergencies that the company may have. Take the risks associated with this
emergency.

4. The capacity of the hangar can only load 2 aircraft at a time during maintenance for
several weeks of inspection and repair by the technician.

You might also like