V200R003C01
Commissioning Guide
Issue 01
Date 2012-12-24
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the
customer. All or part of the products, services and features described in this document may not be within the
purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,
and recommendations in this document are provided "AS IS" without warranties, guarantees or representations
of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Website: http://www.huawei.com
Email: [email protected]
Introduction
This document describes how to install the NetEco application software on the server, and
commission the NetEco system. Commissioning the NetEco consists of the configuration of the
site information, the commissioning of the network, and the collection of the performance
analysis data.
Product Versions
The related product versions are as follows:
NetEco V200R003C01
Intended Audience
This document is intended for network planning engineers and network management engineers.
Change History
01 (2012-12-24)
This issue is the first official release.
Compared with issue Draft A (2012-07-30), this issue includes the following changes:
Modifica 5.1 Uploading the The method of uploading files is changed from FTP-
tion NetEco Server based upload on the command-line interface (CLI) to
Software to the the FTP-based upload in the FileZilla window.
Server
6.1 Uploading the NE The method of uploading files is changed from FTP-
Mediation to the based upload on the CLI to the FTP-based upload in the
NetEco Server FileZilla window.
Draft A (2012-07-30)
This issue is a draft.
Organization
1 Process for Commissioning the NetEco
This section describes how to commission the NetEco system when the RH2285, DL380 or
DL580 server is used. After the server is delivered to the site, you need to modify the server
parameters as required and install the NetEco server software.
2 Preparing for NetEco Commissioning
This section describes the preparations that you must make before commissioning the NetEco
system.
3 Powering On the Server
This chapter describes how to power on the server before installing applications of the
NetEco.
4 Checking the Preinstallation and Configuration of the Server
This section describes how to configure the site information. Before commissioning, you need
to check the initial installation of the NetEco server and ensure that the operating system and
database meet the requirements of the NetEco server software to be installed. During the
commissioning, you need to modify the initial configuration of the server, such as the host name,
IP address, route, and time, according to the actual situation so that the communication between
devices is normal and the NetEco works properly.
5 Installing the NetEco Server Software
This section describes how to install the NetEco server software.
6 Installing NE Mediation
Mediations must be installed for each type of NEs. For the NEs that are of the same type but of
different versions, their mediation versions are different. An example is provided to describe
how to install the NE mediation software. When installing the NE mediation software on site,
you can refer to the NE mediation software installation guide.
7 Checking the installation of the NetEco Server Software
You need to check whether the installation of the NetEco Server Software is successful by
starting and stopping the NetEco Service.
8 Installing the NetEco License
After the NetEco software and the NE mediations are installed completely, you can log in to the
NetEco client using a local PC to install a license.
This section describes the typical NetEco inband and outband networking modes and
commissioning methods.
On the basis of the definition of remote alarm notification, this chapter describes the
commissioning procedures of the remote alarm notification based on short messages and emails.
11 FAQ
12 Appendixes
Conventions
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol Description
General Conventions
The general conventions that may be found in this document are defined as follows.
Convention Description
Convention Description
Command Conventions
The command conventions that may be found in this document are defined as follows.
Convention Description
GUI Conventions
The GUI conventions that may be found in this document are defined as follows.
Convention Description
Keyboard Operations
The keyboard operations that may be found in this document are defined as follows.
Format Description
Key Press the key. For example, press Enter and press Tab.
Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt
+A means the three keys should be pressed concurrently.
Key 1, Key 2 Press the keys in turn. For example, pressing Alt, A means
the two keys should be pressed in turn.
Mouse Operations
The mouse operations that may be found in this document are defined as follows.
Action Description
Click Select and release the primary mouse button without moving
the pointer.
Drag Press and hold the primary mouse button and move the
pointer to a certain position.
Contents
6 Installing NE Mediation............................................................................................................32
6.1 Uploading the NE Mediation to the NetEco Server.........................................................................................33
6.2 Installing the NE Mediation.............................................................................................................................33
11 FAQ..............................................................................................................................................68
11.1 How to Log In To the Server in SSH Mode?.................................................................................................70
11.2 How Do I Log In to the Server Using TightVNC?.........................................................................................72
11.3 How Do I Open the Command Terminal?......................................................................................................72
11.4 Starting MySQL Database Services...............................................................................................................73
11.5 Checking Whether the MySQL Database Is Started......................................................................................73
11.6 Stopping MySQL Database Services.............................................................................................................74
11.7 Starting the NetEco Service............................................................................................................................74
11.8 Stopping the NetEco Service..........................................................................................................................75
11.9 How Do I Uninstall the NetEco Server Software?.........................................................................................76
12 Appendixes...............................................................................................................................103
12.1 Partition Planning of the Server....................................................................................................................104
12.2 Planning Host Names and IP Addresses of NetEcoDevices........................................................................105
12.3 Planning Operating System Users and Their Initial Passwords...................................................................105
12.4 Planning Database Users and Their Initial Passwords.................................................................................106
This section describes how to commission the NetEco system when the RH2285, DL380 or
DL580 server is used. After the server is delivered to the site, you need to modify the server
parameters as required and install the NetEco server software.
Commissioning Process
Table 1-1 describes the process for commissioning the NetEco system.
This section describes the preparations that you must make before commissioning the NetEco
system.
Prerequisites
You have had a user account on http://support.huawei.com, and you have been authorized to
download the NetEco software package. If you are not authorized to download software
packages, contact the website administrator to apply for the rights.
Context
You can download the NetEco server software package from http://support.huawei.com by
choosing Software Center > Version Software > Energy and Infrastructure > Imanager
Neteco > Neteco.
Procedure
l Download the software packages of the NetEco applications to the PC by referring to Table
2-1.
----End
Context
l The NetEco license file is not delivered with the NetEco installation DVD-ROM.
l The license certificate contains information such as product name, license authorization
code (LAC), customer name, and validity period. It is delivered on paper to customers along
with the equipment.
l You can obtain the NetEco license application guide from http://support.huawei.com.
Procedure
Step 1 Huawei engineers apply for the NetEco license based on the LAC and server equipment serial
number (ESN) in the license certificate.
----End
Procedure
l Before installing the system software, ensure that the hardware configuration of the server
meets the requirements. After the server is installed, ensure that the cable connections
comply with industry standards.
– Ensure that the hardware configuration of the server meets the site requirement. Table
2-2 describes the standard hardware configuration of the server provided by Huawei.
Configuration Requirement
Item
Configuration Requirement
Item
NOTE
To know the method of checking the hardware configuration of the server, consult the
manufacturer of the server.
– Check that the hardware devices are securely placed and cables are connected correctly.
Ensure that the power cable connection meets ESD requirements. For details, see section
"Check After Installation" in the NetEco Hardware Installation Guide.
– Ensure that the operating environment meets the requirements. For details, see section
"Check After Installation" in the NetEco Hardware Installation Guide.
----End
This chapter describes how to power on the server before installing applications of the
NetEco.
Procedure
Step 1 Prepare for powering on the server.
1. Ensure that the power switches of all the devices in the cabinet are set to OFF. If a power
switch is ON, set it to OFF.
2. Ensure that the hardware devices are correctly placed and cable connections (especially the
power cable connections) are correct and meet ESD specifications. For details about how
to check the hardware installation, see "Check After Installation" in NetEco Hardware
Installation Guide.
Step 3 Remotely log in to the server in BMC Web mode on a PC. For detailed operations, see 11.10
How Do I Remotely Log In to the Server in BMC Web Mode?.
----End
Procedure
Step 1 Prepare for powering on the server.
1. Ensure that the power switches of all the devices in the cabinet are set to OFF. If a power
switch is ON, set it to OFF.
2. Ensure that the hardware devices are correctly placed and cable connections (especially the
power cable connections) are correct and meet ESD specifications. For details about how
to check the hardware installation, see "Check After Installation" in NetEco Hardware
Installation Guide.
Step 2 Power on the keyboard, video, and mouse (KVM) connected to the server.
l A KVM is an operation and maintenance console used to control multiple PCs and servers
through a set of keyboard, monitor, and mouse.
l For details about the connection mode between the server and the KVM, see NetEco
Hardware Installation Guide.
l You need to install the operating system and database using the KVM.
l You are advised to modify the default parameter settings of the server using the KVM.
----End
Procedure
Step 1 Prepare for powering on the server.
1. Ensure that the power switches of all the devices in the cabinet are set to OFF. If a power
switch is ON, set it to OFF.
2. Ensure that the hardware devices are correctly placed and cable connections (especially the
power cable connections) are correct and meet ESD specifications. For details about how
to check the hardware installation, see "Check After Installation" in NetEco Hardware
Installation Guide.
Step 2 Power on the keyboard, video, and mouse (KVM) connected to the server.
l A KVM is an operation and maintenance console used to control multiple PCs and servers
through a set of keyboard, monitor, and mouse.
l For details about the connection mode between the server and the KVM, see NetEco
Hardware Installation Guide.
l You need to install the operating system and database using the KVM.
l You are advised to modify the default parameter settings of the server using the KVM.
Step 3 Power on the server, as shown in Figure 3-3.
NOTE
After the server is started properly, the button/indicator of its power switch is displayed green.
----End
This section describes how to configure the site information. Before commissioning, you need
to check the initial installation of the NetEco server and ensure that the operating system and
database meet the requirements of the NetEco server software to be installed. During the
commissioning, you need to modify the initial configuration of the server, such as the host name,
IP address, route, and time, according to the actual situation so that the communication between
devices is normal and the NetEco works properly.
This section describes how to configure the NetEco server as the NTP client to synchronize its
time with the NTP server.
Prerequisites
You have logged in to the server as user root.
Procedure
Step 1 Open a command line window, and run the following command to view the version of the
operating system:
# uname -a
Linux osssvr 2.6.16.60-0.54.5-smp #1 SMP Fri Sep 4 01:28:03 UTC 2009 x86_64 x86_64
x86_64 GNU/Linux
In the system output, 2.6.16.60-0.54.5-smp refers to the release number, and #1 SMP
Fri Sep 4 01:28:03 UTC 2009 refers to the kernel ID of UTC. If incorrect information
is displayed, install the SUSE Linux operating system again by referring to the NetEco Software
Initial Installation Guide.
Step 2 Run the following command to view the version of the operating system patch:
# cat /etc/SuSE-release
SUSE Linux Enterprise Server 10 (x86_64)
VERSION = 10
PATCHLEVEL = 4
If the previous information is displayed, the operating system patch of the correct version has
been installed. If incorrect information is displayed, install the SUSE Linux operating system
again by referring to the NetEco Software Initial Installation Guide.
----End
Prerequisites
You have logged in to the server as user root.
Procedure
l Run the following command to display the disk partitions:
# fdisk -l /dev/sda
The following system output shows the information about two 300 GB disks working in
RAID1 mode.
Disk /dev/sda: 298.9 GB, 298999349248 bytes
255 heads, 63 sectors/track, 36351 cylinders
Units = cylinders of 16065 * 512 = 8225280 bytes
Device Boot Start End Blocks Id System
/dev/sda1 * 1 262 2104483+ 83 Linux
/dev/sda2 263 1306 8385930 82 Linux swap / Solaris
/dev/sda3 1307 11749 83883397+ 83 Linux
/dev/sda4 11750 36351 197615565 8e Linux LVM
If incorrect information is displayed, install the SUSE Linux operating system again by
referring to the NetEco Software Initial Installation Guide.
----End
Prerequisites
You have logged in to the server as user root.
Procedure
l Run the following command to display the disk partitions:
# fdisk -l /dev/cciss/c0d0
The following system output shows the information about five 146 GB disks working in
RAID5 and hot standby modes.
Disk /dev/cciss/c0d0: 440.3 GB, 440345714688 bytes
255 heads, 63 sectors/track, 53535 cylinders
Units = cylinders of 16065 * 512 = 8225280 bytes
Device Boot Start End Blocks Id System
/dev/cciss/c0d0p1 * 1 262 2104483+ 83 Linux
/dev/cciss/c0d0p2 263 1306 8385930 82 Linux swap / Solaris
/dev/cciss/c0d0p3 1307 11749 83883397+ 83 Linux
/dev/cciss/c0d0p4 11750 53535 335646045 8e Linux LVM
If incorrect information is displayed, install the SUSE Linux operating system again by
referring to the NetEco Software Initial Installation Guide.
----End
Prerequisites
You have logged in to the server as user root.
Procedure
l Run the following command to display the disk partitions:
# fdisk -l /dev/cciss/c0d0
The following system output shows the information about five 146 GB disks working in
RAID5 and hot standby modes.
Disk /dev/cciss/c0d0: 440.3 GB, 440345714688 bytes
255 heads, 63 sectors/track, 53535 cylinders
Units = cylinders of 16065 * 512 = 8225280 bytes
Device Boot Start End Blocks Id System
/dev/cciss/c0d0p1 * 1 262 2104483+ 83 Linux
/dev/cciss/c0d0p2 263 1306 8385930 82 Linux swap / Solaris
/dev/cciss/c0d0p3 1307 11749 83883397+ 83 Linux
/dev/cciss/c0d0p4 11750 53535 335646045 8e Linux LVM
If incorrect information is displayed, install the SUSE Linux operating system again by
referring to the NetEco Software Initial Installation Guide.
----End
Prerequisites
You have logged in to the server as user root.
Procedure
Step 1 Switch to the command-line interface (CLI) and run the following command to view the running
status of the MySQL database:
If information similar to the preceding command output is displayed, the database has started.
Go to next step. If different information is displayed, run the following command to start the
MySQL database.
Step 2 Open a command line window, and run the following command to query the version of the
MySQL database:
# mysql --version
mysql Ver 14.14 Distrib 5.5.15, for Linux (x86_64) using readline 5.1
If the version number is Distrib 5.5.15 in the system output, the MySQL database of the
correct version has been installed. If an incorrect version number is displayed, install the MySQL
database software again by referring to the NetEco Software Initial Installation Guide.
----End
Prerequisites
l You have logged in to the server as user root.
l The MySQL database service has been started. For details about how to start the MySQL
database service, see 11.4 Starting MySQL Database Services.
Procedure
Step 1 Switch to the command-line interface (CLI) and run the following command to view the running
status of the MySQL database:
# service mysql status
MySQL running(3288) done
If information similar to the preceding command output is displayed, the database has started.
Go to next step. If different information is displayed, run the following command to start the
MySQL database.
# service mysql start
Step 2 Open a command line window, and run the following command to log in to the database:
# mysql -uroot -proot
Welcome to the MySQL monitor. Commands end with ; or \g.
Your MySQL connection id is 5708
Server version: 5.5.15 MySQL Community Server (GPL)
Copyright (c) 2000, 2010, Oracle and/or its affiliates. All rights reserved.
Type 'help;' or '\h' for help. Type '\c' to clear the current input statement.
mysql>
As shown in the system output, you have logged in to the MySQL database successfully.
Step 3 Run the following command to view the name of the MySQL database:
mysql> show databases;
+--------------------+
| Database |
+--------------------+
| information_schema |
| businessdb |
| mysql |
| omcdb |
| omsfm |
| omsmodel |
| omspm |
| omssm |
| omssys |
| performance_schema |
| pmdb |
| swmdb |
| test |
+--------------------+
13 rows in set (0.00 sec)
If the system output contains the preceding databases, the databases have been created correctly.
Otherwise, contact Huawei technical support engineers for assistance.
Step 4 Run the following command to switch back to user root:
mysql> quit;
----End
Prerequisites
You have logged in to the server as user root.
Context
l You can use a tool to change the host name and IP address of the server.
l The tool has been uploaded to the server during the installation of the operating system. It
can be used only before the installation of the NetEco software.
Procedure
Step 1 Open a command-line interface (CLI), and run the following commands to start the tool for
changing the host name and IP address of the server:
# cd /opt/systool
# ./modify.sh
Step 2 When the following information is displayed, type 3 and press Enter:
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
+ +
+ Welcome to use neteco modify tools +
+ +
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
1--modify system user password
Step 3 When the following information is displayed, type the host name and press Enter:
Please input host name [Default:osssvr,Q:quit]:
CAUTION
l The host name can contain letters, numbers, and the hyphen (-).
l The host name cannot begin with a hyphen (-).
l The host name contains a maximum of 10 characters.
l The host name must be in one of the following formats:
l Letters+number: ossvr1
l Letters+-+number: ossvr-1
l Letters: ossvr
Step 4 When the following information is displayed, type 4 and press Enter:
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
+ +
+ Welcome to use neteco modify tools +
+ +
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
1--modify system user password
2--modify mysql user password
3--modify hostname
4--modify IP
5--exit
Step 5 When the following information is displayed, type the IP address and press Enter:
Please input IP address [Default:192.168.8.11,Q:quit]:
Step 6 When the following information is displayed, type the subnet mask and press Enter:
Please input net masks [Default:255.255.255.0,Q:quit]:
Step 7 When the following information is displayed, type the gateway, and press Enter:
Please input default route [Default:192.168.8.1,Q:quit]:
Step 8 When the following information is displayed, type y, and press Enter:
Are you sure to continue?[Y/N]
The host name and IP address of the server is changed when the message ChangeSystemIP
is completed is displayed.
# shutdown -r now
----End
Follow-up Procedure
After restarting the server, perform the following steps to check whether the host name and IP
address of the server are changed successfully:
1. Log in to the server as user root. Then, run the following command on the CLI and check
that the host name of the server is changed successfully:
# hostname
If the host name is changed to osssvr, check that the system displays osssvr.
2. Run the following command to check that the IP address is changed successfully:
# ifconfig
Check that the IP address and subnet mask in the command output are correct.
eth1 Link encap:Ethernet HWaddr 00:25:B3:20:83:A8
inet addr:10.71.30.38 Bcast:10.71.30.255 Mask:255.255.255.0
inet6 addr: fe80::225:b3ff:fe20:83a8/64 Scope:Link
UP BROADCAST RUNNING MASTER MULTICAST MTU:1500 Metric:1
RX packets:2131011 errors:0 dropped:0 overruns:0 frame:0
TX packets:217428 errors:0 dropped:0 overruns:0 carrier:0
collisions:0 txqueuelen:0
RX bytes:740678469 (706.3 Mb) TX bytes:16025790 (15.2 Mb)
4.6 Changing the Time Zone and Time of the Server (Before
Installing the NetEco)
This section describes how to change the time zone and time of the NetEco server. The local
time can be correctly displayed only when the time zone and time are set correctly.
Prerequisites
You have logged in to the server as user root using the TightVNC software. For details, see
11.2 How Do I Log In to the Server Using TightVNC?.
Context
l To change both the time zone and the time, you must change the time zone first.
l You can perform the following operations to change the time zone and time of the server
only before installing the NetEco. If the NetEco has been installed, refer to the relevant
administrator guide to change the time zone and time of the server.
Procedure
Step 1 Stop the MySQL database service.
Check whether the database is started by referring to 11.5 Checking Whether the MySQL
Database Is Started. If the database has been started, see 11.6 Stopping MySQL Database
Services to stop it.
Step 2 Open a command line window by referring to 11.3 How Do I Open the Command
Terminal?, and run the following command. The YaST Control Center dialog box is
displayed.
# yast2
Step 3 Click System in the left pane of the YaST Control Center dialog box. Then, click Date and
Time in the right pane. The Clock and Time Zone dialog box is displayed, as shown in Figure
4-1.
NOTE
If the daylight saving time (DST) is not used, replace the value of Etc with the current GMT time zone.
GMT+N indicates that the local time is N hours behind GMT. GMT-N indicates that the local time is N
hours ahead of GMT.
Step 4 In the Clock and Time Zone dialog box, check whether the settings of Region and Time
Zone comply with the actual situation. If they do not comply with the actual situation, change
them.
Step 5 In the Time and Date group box of the Clock and Time Zone dialog box, check whether the
time and date are correct.
If... Then...
The time and date 1. Click Change in the Date and Time group box. The Change
are incorrect System Date and Time dialog box is displayed.
2. Set the time and date in Current Time and Current Date as
required, and click Apply.
Step 6 In the Clock and Time Zone dialog box, click Accept.
----End
Prerequisites
l You have correctly set the time zone, date, and time of the NetEco server.
l You have obtained the IP address of the NTP server.
l You have logged in to the server as user root using the TightVNC software. For details,
see 11.2 How Do I Log In to the Server Using TightVNC?.
Procedure
Step 1 Open a command line window by referring to 11.3 How Do I Open the Command
Terminal?, and run the following command. The YaST Control Center dialog box is
displayed.
# yast2
Step 2 Click Network Services in the left pane of the YaST Control Center dialog box. Then, click
NTP Configuration in the right pane. The NTP Configuration dialog box is displayed, as
shown in Figure 4-2.
Step 3 In the NTP Configuration dialog box, click During Boot in Automatically Start NTP
Daemon. The Warning dialog box is displayed, as shown in Figure 4-3. Click Continue.
Step 4 In the NTP Configuration dialog box, enter the IP address of the NTP server in the Address
field under NTP Server Configuration, and click Test to test the NTP settings.
l When the system displays Server is unreachable or does not respond
properly., the NTP server is not configured successfully.
l When the system displays Server is reachable and responds
properly. , the NTP server is configured successfully.
----End
Context
l The NetEco software package is available. For details about how to obtain the software
package, see 2.1 Obtaining the Software Package.
l You have uninstalled the NetEco software if it has been installed on the server. For details
about how to uninstall the NetEco software, see 11.9 How Do I Uninstall the NetEco
Server Software?.
l It is assumed that the software package is uploaded to the directory /export/home/
NetEcoSoftware.
If the directory /export/home/NetEcoSoftware does not exist on the server, run the
following commands as user root to create:
# cd /export/home
# mkdir NetEcoSoftware
# chmod 755 NetEcoSoftware
Procedure
Step 1 Upload the NetEco server software package to the NetEco server by using FileZilla tool.
For details about how to use the FileZilla tool, see 11.15 How Do I Use FileZilla to Transfer
Files?. The configuration information required for uploading the files is as follows:
l User and password: root user and its password
l Transfer type: Auto or Binary
l Directory of files on the server: /opt/software
----End
Prerequisites
l You have logged in to the server as user root using the TightVNC software. For detailed
operations, see 11.2 How Do I Log In to the Server Using TightVNC?.
l The NetEco software package has been uploaded to the server.
Procedure
Step 1 Switch to the command-line interface (CLI) and run the following command to view the running
status of the MySQL database:
# service mysql status
If information similar to the preceding command output is displayed, the database has started.
Go to next step. If different information is displayed, run the following command to start the
MySQL database.
# service mysql start
If the preceding information is displayed indicating that the setup directory already exists, Type
N and run the following command to delete the setup directory. Then, perform Step 3 to
decompress the software package again. If the preceding information is not displayed, go to
Step 4.
# rm -rf setup/
# chmod +x setup.sh
# ./setup.sh
Step 5 In the displayed Select Setup Language dialog box shown in Figure 5-1, select English and
click OK.
Step 6 In the displayed dialog box shown in Figure 5-2, click Next.
Step 7 In the displayed dialog box shown in Figure 5-3, select I accept these terms and click Next.
Step 8 In the displayed dialog box shown in Figure 5-4, retain the default settings of installation
parameters and directly click Next.
If the /opt/neteco directory does not exist, a dialog box is displayed. Click Yes. The /opt/
neteco directory is created.
Step 9 In the displayed dialog box shown in Figure 5-5, select all components and click Next.
Step 10 In the displayed dialog box shown in Figure 5-6, set database service parameters and click
Next.
Superuser Name Superuser of the database. If the MySQL database is used, the
default value is root.
Superuser Password Password of the database superuser. You need to type the
password as required.
NOTE
For details about the default password of the database superuser, see
12.4 Planning Database Users and Their Initial Passwords.
NMS Database User Name NMS user name of the NetEco database. The default value is
ossuser.
Confirm NMS Database Password of the database NMS user, which is used for
User Password confirmation.
The value of this parameter must be the same of as that of
NMS Database User Password.
Step 11 In the displayed dialog box shown in Figure 5-7, confirm the installation information and click
Next.
Step 12 When the dialog box shown in Figure 5-8 is displayed, the system has started installing the
NetEco software.
Step 13 In the displayed dialog box shown in Figure 5-9, click Finish.
----End
6 Installing NE Mediation
Mediations must be installed for each type of NEs. For the NEs that are of the same type but of
different versions, their mediation versions are different. An example is provided to describe
how to install the NE mediation software. When installing the NE mediation software on site,
you can refer to the NE mediation software installation guide.
Prerequisites
The mediation software package is available on a PC that is connected to the server. For details
about how to obtain the mediation software package and its patch package, see 2.1 Obtaining
the Software Package.
Procedure
Step 1 Upload the NE mediation package to the NetEco server by using FileZilla tool.
For details about how to use the FileZilla tool, see 11.15 How Do I Use FileZilla to Transfer
Files?. The configuration information required for uploading the files is as follows:
l User and password: root user and its password
l Transfer type: Auto or Binary
l Directory of files on the server: /export/home/NetEcoSoftware
----End
Prerequisites
l You have uploaded the NE mediation software package and its patch package to the /
export/home/NetEcoSoftware directory on the server.
l You have logged in to the server as user root.
Context
For NetEco V200R03C00 and later versions, the NE mediation software package is in ZIP
format. NE mediation software package and its patch package in TAR format are still supported.
The installation methods for the two formats are the same. You need to replace only the file
name in Step 5 as required.
Procedure
Step 1 Stop NetEco services by referring to 7.2 Stopping the NetEco Service.
Step 2 Switch to the command-line interface (CLI). Then, run the following command to change the
owner group of all files in the /export/home/NetEcoSoftware directory.
# su ossuser
Step 4 Run the following command to navigate to the directory of the script for installing the NE
mediation:
> cd /opt/neteco/bin
NOTE
You need to run the preceding command by line. > is prompts. \ is the newline prompt and no space is
allowed after \.
/export/home/NetEcoSoftware/NetEco_Match_Power2000V200R003C01SPC001.zip is
the full path of the NE mediation software package. Replace it as required.
Begin Install NetEcoCM Data.......
Install NetecoCM Data Succeed!
Begin Install NetEcoPM Data.......
Install NetEcoPM Data Succeed!
Install med successed; Version: NetEco_Match_Power2000V200R003C01SPC001
The install detail log at path:/opt/neteco/log/neteco/medinstalll.log
----End
You need to check whether the installation of the NetEco Server Software is successful by
starting and stopping the NetEco Service.
Prerequisites
l You have logged in to the NetEco server as user root in SSH mode. For details, see 11.1
How to Log In To the Server in SSH Mode?
l The database service has been started. For details about how to start the database service,
see 11.4 Starting MySQL Database Services.
Context
If the time on the NetEco server has been modified, or NetEco services have stopped running
for more than four days, the NetEco performance data might fail to be written into the database.
You need to check and modify the tablespace settings for the performance database in advance
before starting the NetEco Service. For details, see How Do I Solve the Problem that Performance
Data Fails to Be Written into the Database?.
Procedure
Step 1 Run the following command in the command line window to switch to user ossuser:
# su ossuser
Step 2 Run the following command to execute the environment variables:
> . /opt/neteco/bin/svc_profile.sh
Step 3 Run the following command to navigate to the /opt/neteco/bin directory:
> cd /opt/neteco/bin
Step 4 Run the following command to start the NetEco service:
> ./startup.sh
It will take about two to five minutes to start the NetEco service.
If the following command result is displayed, the NetEco service has been started.
System start completely
NetEco Pre Compile Started.
NOTE
If the message NetEco is Running! operation exit. is displayed, the NetEco service has
beeen started or being started.
----End
Prerequisites
You have logged in to the NetEco server as user root in SSH mode. For details, see 11.1 How
to Log In To the Server in SSH Mode?
Procedure
Step 1 Run the following command in the command line window to switch to user ossuser:
# su ossuser
> . /opt/neteco/bin/svc_profile.sh
> cd /opt/neteco/bin
> ./kill_neteco.sh
If the following command result is displayed, the NetEco service has been stopped.
NetEco Service Stopped.
----End
Prerequisites
You have logged in to the NetEco server as user root in SSH mode. For details, see 11.1 How
to Log In To the Server in SSH Mode?
Procedure
Step 1 Run the following command at the command terminal to check whether the NetEco services
have started.
If the similar command results are displayed, the NetEco services have started. If no similar
command result is displayed, the NetEco services have not started.
NOTE
The NetEco provides services for three processes. The IDs for the three processes in the command result
are 16280, 16301, and 16303. The system assigns IDs at random. You can check the service status based
on the actual ID.
----End
Prerequisite
NetEco works in browse/server mode. The connection between the current client and the
NetEco server is normal, and the NetEco server runs properly.
Context
The NetEco provides an initial user name admin and user password Changeme123. The user
admin has the operation rights of all managed domains of the NetEco.
CAUTION
l After the first successful login, you need to change the password to ensure the NetEco
security.
l If a rollback is required during operations, you are not advised to use the browser's back
button. Otherwise, the current data is lost and the NetEco exits.
l When the password will expire, you are prompted to change the password within the password
expiration warning days.
l If the number of online users reaches the maximum allowed by the license, the OMS displays a message
indicating that you cannot log in. In this case, contact the system administrator.
----End
----End
After the NetEco software and the NE mediations are installed completely, you can log in to the
NetEco client using a local PC to install a license.
Prerequisites
l You have started the NetEco services. For details, see 7.1 Starting the NetEco Service.
l You have obtained the NetEco license. For details, see 2.2 Obtaining the Software
License.
l The communication between the PC running the client and the NetEco server is normal.
Procedure
Step 1 Open the IE8 browser, type "https://NetEco server IP address:8086" in the address bar.
Step 2 In the displayed page, click Continue to this website (not recommended).
Step 3 In the displayed page, log in to the NetEco system as user admin.
NOTE
After first login, use the initial password of user admin. To ensure account security, change the password
of user admin as prompted after the initial login.
Step 4 From the main menu of the NetEco, choose System > License Management.
Step 5 On the License Management page, click Import License.
Step 6 On the Import License page, select the license file that has been obtained.
Step 7 Click Import.
All the information about the newly imported license is displayed.
Step 8 Click Apply.
----End
This section describes the typical NetEco inband and outband networking modes and
commissioning methods.
The devices that are connected to the NetEco system are categorized into the following two
types:
l Devices connected through a serial cable, such as a modem. These devices, together with
the NetEco server and NetEco client, compose the NetEco system.
l Devices connected through an OM network, including various types of NEs managed by
the NetEco or devices connected to the network.
manage the energy and environment systems. The GBTSs must be in GBSS12.0 or later
and NodeBs in RAN13.0 or later and both must be provided by Huawei.
l Out-band networking mode: Energy and environment data about base stations is transmitted
to the NetEco over the IP, E1, GPRS, or SMS network for the NetEco to centrally manage
the energy and environment systems. The SMS network can be used on the GPRS network
to provide backup transmission channels when the network is unstable.
NOTE
The preferential order among out-band networking modes is as follows: IP networking or E1 networking,
GPRS private networking or GPRS/SMS networking, GPRS networking, and SMS networking.
Figure 9-7 shows the SMS networking, which need to be configured with an SMS modem.
Figure 9-8 shows the GPRS router pool networking in which GPRS wireless router pool devices
need to be configured.
Figure 9-9 shows the GPRS private networking in which a GPRS wireless router needs to be
configured.
Prerequisites
An idle serial port is available on the NetEco server.
Procedure
Step 1 Insert a SIM card into the SMS modem.
Use a tool such as the pen point to press the yellow key. Put the SIM card on the ejected tray,
and insert the tray into the modem.
Access SMS Modem One end of the cable connects the GPRS
wireless router and the other end connects an
idle serial port on the NetEco server.
Access Modem pool One end of the cable connects the GPRS
wireless router and the other end connects an
idle USB port on the NetEco server.
NOTE
For details, see the user manual delivered with the GPRS wireless router.
Use the connector convertor delivered with the GPRS wireless router if the connector of the serial cable
does not match the serial port on the NetEco server.
Use the serial port cable of the modem to connect the modem and the NetEco server. One end
connects the modem, and the other end connects the idle serial port on the NetEco server. For
details, see the specifications delivered with the modem.
NOTE
Use the connector convertor delivered with the modem if the interface of the serial port cable is different
from the serial port on the NetEco server.
Use the DC power cable delivered with the modem. For details, see the specifications delivered
with the modem. After the power cable is connected, switch on the power. Normally, the
indicator of the modem blinks regularly. Table 9-1 shows how the indicator indicates the work
status of the modem.
Table 9-1 Relations between the status of the indicator and the modem
Indicator Modem
Indicator Modem
Blinks slowly The modem is connected to the network and is in idle mode.
NOTE
The modem frequency is different from SIM card, to see 11.13 How Do I Modify the Frequency Band
for the Modem?.
To install the modem driver, see the specifications delivered with the modem.
NOTE
You need to install the driver only when the installation of the driver is required in the specifications
delivered with the modem.
----End
Prerequisites
l The SMS modem has been installed.
l The NetEco services have stopped, for details, see 7.2 Stopping the NetEco Service.
Procedure
Step 1 Perform the following operations to configure the device file.
1. Log in to the NetEco server as user root.
2. Open the command-line interface and run the following command to enter the /dev
directory:
# cd /dev
3. Run the following commands to redirect the device file to the PortCfg.txt file:
4. Run the following commands to change the owner and user group of the device file:
# rm -rf /opt/neteco/bin/runtime.center/work/
6. Run the enablesms.sh script to enable NetEco to send and receive interaction information
by using SMS modem:
# cd /opt/neteco/bin
# ./enablesms.sh
NOTE
You can run the disablesms.sh script to disable NetEco to send and receive interaction information
by using SMS modem as required.
7. Start the NetEco services by referring to 7.1 Starting the NetEco Service.
Step 4 In the Inband Settings window, click the SMS Gateway tab.
Step 6 In the SMS Center Number text box, enter the corresponding SIM number, and click Set.
NOTE
You need to type both the MCC and the SMS center number. For example, if the SMS center number is
13900001234 and the MCC is 86, type 8613900001234.
----End
Prerequisites
The SMS parameters have been set.
Context
If an HP DL380 or DL580 server is used as the NetEco server, you need to disable Serial CLI
Status for the iLO remote management port to ensure that the server can communicate with the
SMS modem properly. For details, see 11.16 How Do I Disable Serial CLI Status for the iLO
Remote Management Port.
Procedure
Step 1 Log in to the NetEco server using a Web browser.
Step 3 In the Channel Configuration window, click the SMS Gateway tab.
Step 4 In the Phone Number for SMS Test text box, enter a test number, and click Test.
NOTE
You need to type both the MCC and the number of the test mobile phone. For example, if the number of
the test mobile phone is 13900001234 and the MCC is 86, type 8613900001234.
l If the test mobile phone receives Test SMS, you can infer that the SMS parameters are set
correctly.
l If the test mobile phone does not receive Test SMS, you can infer that the SMS parameters
are set incorrectly. In this case, you need to check whether the SMS center number and the
number of the test mobile phone are correct.
----End
Prerequisites
An idle serial port is available on the NetEco server.
Procedure
Step 1 Install a SIM card into the GPRS wireless router.
Use a tool such as a pen point to press the yellow key on the GPRS wireless router. Put the
subscriber identity module (SIM) card on the ejected tray and push the tray into the GPRS
wireless router.
NOTE
l The SIM card is configured with a fixed IP address, which ensures proper interaction between NEs
and the NetEco.
l Ensure that NEs communicate with the GPRS wireless router properly and transmission signals comply
with the security policies that telecom operators set for terminals.
l Only the SIM cards inserted into NEs and GPRS wireless router can be connected to the APN network.
l To use service functions properly and ensure network security, insert the SIM cards on the networks
that are configured with the same APN into NEs and GPRS wireless router.
Connect the GPRS wireless router to the NetEco server by using the serial cable delivered with
the wireless router. One end of the cable connects the GPRS wireless router and the other end
connects an idle serial port on the NetEco server. For details, see the user manual delivered with
the GPRS wireless router.
NOTE
Use the connector convertor delivered with the GPRS wireless router if the connector of the serial cable
does not match the serial port on the NetEco server.
Use the DC power cable delivered with the GPRS wireless router. For details, see the user manual
delivered with the GPRS wireless router. After the power cable is connected successfully, switch
on the power. The indicator of the GPRS wireless router blinks regularly. Table 9-2 lists
relationships between indicator status and GPRS wireless router status.
Table 9-2 Relationships between indicator status and GPRS wireless router status
----End
Prerequisites
An idle serial port is available on the NetEco server.
Procedure
Step 1 Configure the IP address of the GPRS wireless router in the same network segment of the local
area network (LAN) as the IP address of the NetEco server.
For example:
l The IP address of the NetEco server is 10.71.30.121.
l The IP address of the GPRS wireless router is 10.71.30.222.
Figure 9-12 Changing the IP address of the GPRS wireless router in the LAN
Step 2 Add the IP address of the GPRS wireless router to the default routing table of the NetEco server.
For details, see Adding or Deleting Routes for the Server in NetEco Administrator Guide.
Step 3 Obtain the IP address of the GPRS wireless router in the wide area network (WAN)
1. The IP address of the GPRS wireless router in the WAN and the SIM card are bound
together.
2. Open the web page of the GPRS wireless router using PC and query the IP address, as
shown in Figure 9-13.
Figure 9-13 Querying the IP address of the GPRS wireless router in the WAN
Step 5 Configure the IP address of the GPRS wireless router in the WAN as the NetEco IP address in
OMU1 and OMU2.
Step 6 On the web page of the GPRS wireless router, configure and enable the function of forwarding
messages to the NetEco server over ports so that the GPRS wireless router automatically
forwards received OMU messages to the corresponding ports on the NetEco server.
The port forward function is enabled as required for six port numbers: 31220, 31238, 31239,
31240, 31241, and 31242. The port number 31220 is the MedDispatch port. The port numbers
from 31238 to 31242 are the Med ports. Each Med port can load 500 NEs.
Figure 9-14 Configuring the port forward function of the GPRS wireless router
----End
Prerequisites
The GPRS wireless router parameters have been set.
Procedure
Step 1 Connect a PC to the all-in-one controller. Log in to the PC and ssh to the all-in-one controller.
Then ping the fixed IP address of a GPRS wireless router. If the fixed IP address can be pinged
successfully, the all-in-one controller communicates with the GPRS wireless router properly.
Otherwise, contact Huawei technical support engineers.
Step 2 Log in to the NetEco server and ping the fixed IP address of the GPRS wireless router. If the
fixed IP address can be pinged successfully, the NetEco server communicates with the GPRS
wireless router properly. Otherwise, contact Huawei technical support engineers.
----End
Prerequisites
Telecom operators have provided the E1 network.
Procedure
Step 1 Add an E1 device to the E1 network.
----End
Prerequisites
An idle serial port is available on the NetEco server.
Procedure
Step 1 Configure the dual in-line package (DIP) switches on the front panel and bottom panel of a
TD-6228 bridge device.
1. NOTE
Configure the switches on the front panel by referring to the Etek TD-6228 FE1 Bridge User
Manual.
2. All switches on the bottom panel are set to OFF.
Step 2 Set parameters of a TD-6032 bridge.
1. Log in to the TD-6032 bridge configuration page.
Default IP address: 192.168.1.1 Default user name: admin Default password:
admin
2. Choose Service Config > Channel Config. Bind each channel with a timeslot on the
displayed page, as shown in Figure 9-15.
Step 4 Connect the XMU to an Ethernet port on the front panel of the TD-6228 bridge device by using
the network cable.
Step 5 Connect a TD-6228 device to a TD-6032 device.
Connect UP-E1 TX ports on a TD-6228 device to ports RX1 to RX31 at the rear of a TD-6032
device by using E1 cables based on preset timeslots,
and connect ports TX1 to TX31 at the rear of the TD-6032 device to UP-E1 ports RX1 to RX31
on the TD-6228 device by using coaxial cables over the E1 network.
NOTE
E1-75 ohm unparallel signal TX and RX ports are used by default.
----End
Prerequisites
E1 device parameters have been set.
Procedure
Step 1 Connect a PC to the all-in-one controller. Log in to the PC and ssh to the all-in-one controller.
Then ping the fixed IP address of the NetEco server. If the fixed IP address can be pinged, the
all-in-one controller is connected to the NetEco properly. Otherwise, contact Huawei technical
support engineers.
----End
On the basis of the definition of remote alarm notification, this chapter describes the
commissioning procedures of the remote alarm notification based on short messages and emails.
Procedure
Step 1 Installing the SMS modem by reference to 9.3.1 Installing the SMS Modem.
Step 2 Setting the SMS parameters by reference to 9.3.2 Setting the SMS Parameters.
Step 3 Verifying the SMS communication function by reference to 9.3.3 Verifying the SMS Network
Function.
----End
Prerequisites
l You have the operation rights for Alarm Settings.
l The host name, port, code protocol, and calling number of the SMS server are obtained.
Procedure
Step 1 Choose Fault > Alarm Settings from the main menu.
Step 2 In the Alarm Settings window, choose Remote Notification > SMS Server.
Step 3 In the SMS Server Settings window, set the host name, port number, and calling number.
l Host name: the host name or IP address of the short message center.
l Port: the port number of the short message center. You can set it as required.
l Calling number: calling number for sending a short message.
If you want to send long messages and status reply, click Advanced to set related parameters.
Table 10-1 describes the short message length supported by each protocol.
l Click Test to check the connection to the SMS server. The system displays a message showing the
connection status. When you test the server connection, if the entered parameter is incorrect, the
response will be slow and it might take some time.
l After setting the parameters of the SMS server, you can click Apply to save the settings. As the SMS
server parameters involves the user name and password, to ensure security, the NetEco does not prompt
you to save data when you do not click Apply.
----End
Prerequisites
l You have the operation rights for Alarm Settings.
l The email server IP address and sender address are obtained.
Procedure
Step 1 Choose Fault > Alarm Settings from the main menu.
NOTE
Alternatively, choose System > System Configuration > Basic Settings > Email Server from the main
menu.
Step 2 In the Alarm Settings window, choose Remote Notification > Email Server.
Step 3 On the Email Server Settings page, set the email server and sender address.
l SMTP server: the host name or IP address of the email server.
NOTE
You are advised to use the IP address of the email server to avoid the connection failure due to domain
name resolution failure.
l Sender address: the email address of the sender.
l Server port: the port on the email server used to connect to the NetEco.
NOTE
The default SMTP port number is 25 and the default SSL port number 465. Ensure that the server port
is correct for successful email transmission.
l Require authentication: Determines whether the current user has permissions to send
emails. If the email server requires authentication, you need to select Require
authentication and set the user name and password of the email server.
l Require SSL: Determines the protocol used to connect to the email server.
– Select the check box: The SSL protocol is used.
– Clear the check box: The SMTP protocol is used.
l Click Test to check the connection to the Email server. The system displays a message showing the
connection status. When you test the server connection, if the entered parameter is incorrect, the
response will be slow and it might take some time.
l After setting the parameters of the email server, you can click Apply to save the settings. As the email
server parameters involves the user name and password, to ensure security, the NetEco does not prompt
you to save data when you do not click Apply.
----End
11 FAQ
This section describes how to uninstall the NetEco server software from the server. After you
uninstall the NetEco server software, all the mediation software on the server will be uninstalled.
11.10 How Do I Remotely Log In to the Server in BMC Web Mode?
This section describes how to remotely log in to the server in BMC Web mode. The RH2285
server allows users to manage the server by remotely logging in to the server through Internet
Explorer delivered with Windows.
11.11 How Do I Configure the iLO3 Remote Management Port (DL380)?
This section describes how to configure the iLO3 remote management port on the DL380 server.
After configuring the remote management port, you can install the operating system and database
software remotely. The remote management ports provided by different server vendors are
different. If you use a non-HP server, you need to contact the related vendor of the PC server to
obtain the method of configuring a remote management port.
11.12 How Do I Configure the BMC Remote Management Port (RH2285)?
This section describes how to configure the BMC remote management port. Before installing
an operating system on the RH2285 server, you need to configure an IP address for the BMC
management port on the server.
11.13 How Do I Modify the Frequency Band for the Modem?
This section describes how to modify the frequency band for the Modem.
11.14 How Do I Solve the Problem of MySQL Database Login Failure?
11.15 How Do I Use FileZilla to Transfer Files?
This section describes how to use FileZilla to transfer files. FTP-based file transfer improves
the transfer security. FileZilla is a dedicated file transfer tool that supports both FTP-based
transfer and resumable download. Therefore, you are advised to use FileZilla to transfer files.
11.16 How Do I Disable Serial CLI Status for the iLO Remote Management Port
This section describes how to disable Serial CLI Status for the iLO remote management port.
In the short message service (SMS) networking scheme, if an HP DL380 or DL580 server is
used as the NetEco server, you need to disable Serial CLI Status for the iLO remote
management port to ensure that the server can communicate with the SMS modem properly.
Prerequisites
l The SuSE Linux operating system is installed.
l The PC and the maintenance Ethernet port (eth0) of the server communicate normally.
l You have downloaded the PuTTY tool of the latest version to the local PC from http://
support.huawei.com.
Procedure
1. In the directory where the PuTTY software is saved, double-click PuTTY.exe. A dialog
box is displayed, as shown in Figure 11-1.
2. (Optional) To record operation logs, choose Session > Logging in the left pane, select
Printable output in the Session logging area, and then set the directory for saving the
operation logs in the Log file name area. See Figure 11-2.
3. Choose Session in the left pane, select SSH in the right pane, enter IP address of the
server in the Host Name (or IP Address) area, and then click Open to log in to the server.
Click Yes if the following warning information is displayed when the dialog box is opened
for the first time.
Problem
How do I log in to the server using TightVNC?
Prerequisites
l The communication between the PC and the server is normal.
l The graphical terminal software TightVNC has been obtained from http://
support.huawei.com. You can download TightVNC from http://support.huawei.com by
choosing Software Center > Mature Tool > Core Network Product Line > Wireless-
OSS > iManager M2000-II > Public Tools.
Answer
1. On the PC, decompress TightVNC and double-click the program to start it.
2. In the displayed New TightVNC Connection dialog box, enter IP address:1 in the VNC
server field, and click Connect.
NOTE
If the connection is not established after you enter IP address:1, enter IP address:2 and try again.
If the connection still cannot be established, try IP address:8. If the problem persists, check whether
the firewall is enabled and the remote login is set. You can also restart the remote login.
3. In the displayed Linux login window, type the user name and password of user root to log
in to the server.
Question
How do I open the command terminal on the SUSE Linux operating system?
Answer
Assume that you have logged in to the operating system as user root.
Right-click on the desktop of the operating system and choose Open Terminal from the shortcut
menu. The command terminal window is displayed.
Prerequisites
l You have logged in to the NetEco server as user root in SSH mode. For details, see 11.1
How to Log In To the Server in SSH Mode?
l MySQL Database Services is not started, see 11.5 Checking Whether the MySQL
Database Is Started to checking whether the MySQL database is started.
Procedure
Step 1 In the command line window, run the following command to start MySQL database services:
# service mysql start
Starting MySQL.... done
----End
Prerequisites
You have logged in to the NetEco server as user root in SSH mode. For details, see 11.1 How
to Log In To the Server in SSH Mode?
Procedure
Step 1 In the command line window, run the following command to check whether the MySQL database
is started:
# service mysql status
MySQL running(3288) done
If the previous information is displayed, the MySQL database has been started.
MySQL is not running failed
If the previous information is displayed, the MySQL database has been stopped.
----End
Prerequisites
l You have logged in to the NetEco server as user root in SSH mode. For details, see 11.1
How to Log In To the Server in SSH Mode?
l MySQL Database Services is started, see 11.5 Checking Whether the MySQL Database
Is Started to checking whether the MySQL database is started.
Procedure
Step 1 In the command line window, run the following command to stop MySQL database services:
----End
Prerequisites
l You have logged in to the NetEco server as user root in SSH mode. For details, see 11.1
How to Log In To the Server in SSH Mode?
l The database service has been started. For details about how to start the database service,
see 11.4 Starting MySQL Database Services.
Context
If the time on the NetEco server has been modified, or NetEco services have stopped running
for more than four days, the NetEco performance data might fail to be written into the database.
You need to check and modify the tablespace settings for the performance database in advance
before starting the NetEco Service. For details, see How Do I Solve the Problem that Performance
Data Fails to Be Written into the Database?.
Procedure
Step 1 Run the following command in the command line window to switch to user ossuser:
# su ossuser
> . /opt/neteco/bin/svc_profile.sh
> cd /opt/neteco/bin
> ./startup.sh
It will take about two to five minutes to start the NetEco service.
If the following command result is displayed, the NetEco service has been started.
System start completely
NetEco Pre Compile Started.
NOTE
If the message NetEco is Running! operation exit. is displayed, the NetEco service has
beeen started or being started.
----End
Prerequisites
You have logged in to the NetEco server as user root in SSH mode. For details, see 11.1 How
to Log In To the Server in SSH Mode?
Procedure
Step 1 Run the following command in the command line window to switch to user ossuser:
# su ossuser
> . /opt/neteco/bin/svc_profile.sh
> cd /opt/neteco/bin
> ./kill_neteco.sh
If the following command result is displayed, the NetEco service has been stopped.
NetEco Service Stopped.
----End
Prerequisites
You have logged in to the server as user root using the TightVNC software. For detailed
operations, see 11.2 How Do I Log In to the Server Using TightVNC?.
Procedure
1. Open the command-line interface, and run the following commands to stop the NetEco
services:
# su ossuser
> . /opt/neteco/bin/svc_profile.sh
> cd /opt/neteco/bin
> ./kill_neteco.sh
If the following command result is displayed, the NetEco service has been stopped.
NetEco Service Stopped.
4. In the displayed dialog box shown in Figure 11-6, set database server parameters and click
Next.
Parameter Description
Superuser Password Password of the database superuser. You need to type the
password as required.
NOTE
For details about the default password of the database superuser,
see 12.4 Planning Database Users and Their Initial
Passwords.
Prerequisites
l The communication between the PC and the BMC management network port on the server
is proper.
l You have configured the IP address of the BMC management network port on the server
based on site requirements. For details, see 11.12 How Do I Configure the BMC Remote
Management Port (RH2285)?.
Procedure
1. Start Internet Explorer. Type the IP address of the BMC management network port in the
Address box.
If the version of Internet Explorer is earlier than Internet Explorer 8.0, click Yes in the
displayed Security warning window. If the version of Internet Explorer Internet Explorer
8.0 or later, click Continue to this website (not recommended). in the displayed dialog
box.
The window shown in Figure 11-8 is displayed.
2. Type the user name and password, and click Log In. The window shown in Figure 11-9
is displayed.
NOTE
3. Double-click Remote Control in the navigation tree in the left pane. The system displays
a window for remotely connecting to the server, as shown in Figure 11-10.
Question
How do I configure the iLO3 remote management port on the server?
Answer
1. Obtain the IP address plan of the iLO3 remote management port and the password of user
Administrator.
2. During the server startup, press F8 to go to the window for configuring the remote
management port when the following information is displayed:
3. In the window shown in Figure 11-11, choose Network > DNS/DHCP by using the arrow
keys on the KVM, and press Enter to continue.
4. Select DHCP Enable in the displayed window shown in Figure 11-12. Then, set DHCP
Enable to OFF by using the spacebar. Then, press F10 to save the current settings.
5. In the remote management port configuration window shown in Figure 11-11, choose
Network > NIC and TCP/IP by using the arrow keys on the KVM, and press Enter to
continue.
6. In the displayed window shown in Figure 11-13, fill in the IP address, subnet mask, and
gateway IP address of iLO3, and press F10 to save the current settings.
7. In the remote management port configuration window shown in Figure 11-11, choose
Users > Edit by using the arrow keys on the KVM, and press Enter to continue.
8. In the displayed window shown in Figure 11-14, select Administrator and press Enter
to continue.
9. In the displayed window shown in Figure 11-15, type the password of user
Administrator of iLO3, and press F10 to save the current settings.
10. In the remote management port configuration window shown in Figure 11-11, choose File
> Exit by using the arrow keys on the KVM, and press Enter to continue.
11. In the displayed window shown in Figure 11-16, press Enter to restart the server for the
settings of iLO3 to take effect.
Subsequent Processing
After configuring the iLO3 port, you can perform the following operations to log in to this port
remotely:
1. Check that the remote client is properly connected to the iLO3 port on the server.
2. Start Internet Explorer on the remote client, type http://IP address of iLO3 in the Address
box and press Enter. The welcome window for logging in to the iLO3 port is displayed.
3. When the login is successful, choose Administration > Licensing, fill in the required
license information in Activation Key and click Install to update the license.
4. In the management window of the iLO3 port shown in Figure 11-19, choose Remote
Console > Integrated Remote Console to enable the iLO3 port so that you can operate
the KVM remotely.
Prerequisites
You have obtained the IP address of the BMC remote management port on the server as required.
Answer
You can configure this port from a local PC that is directly connected to the server or through
the BMC web interface. The following describes the two configuration methods.
l Configure this port from a local PC that is directly connected to the server.
1. Connect the local PC to the server.
Configure the BMC Connect the monitor, the keyboard with a USB plug, and the
management port mouse with a USB plug to the server.
using a monitor,
mouse, and
keyboard
Configure the BMC Connect the KVM to the server by using a signal cable
management port delivered with the KVM. For detailed operations, see Figure
using the KVM 11-20.
2. Start the RH2285 server and press Delete to switch to the BIOS screen. Then, select
Advanced. The Advanced tab page is displayed, as shown in Figure 11-21.
3. Select IPMI 2.0 Configuration and press Enter. The IPMI 2.0 Configuration area
is displayed, as shown in Figure 11-22.
4. Select BMC Configuration and press Enter. The BMC Configuration area is
displayed, as shown in Figure 11-23.
5. Change the IP address, subnet mask, and gateway address of the BMC management
port in sequence.
– Select IP Address in the BMC Configuration area to change the IP address of
the BMC management port, as shown in Figure 11-24.
– Select Subnet Mask in the BMC Configuration area to change the subnet mask
of the BMC management port, as shown in Figure 11-25.
– Select Gateway Address in the BMC Configuration area to change the gateway
address of the BMC management port, as shown in Figure 11-26.
l You need to manually restart the server after changing the IP address of the management
port through the BMC web interface. It is recommended that you change the IP address on
the local PC connected to the server.
l You need to use the default IP address of the BMC management port 192.168.2.100 for
the first login attempt.
l Ensure that the IP address of the PC and the IP address of the server management port are
on the same network segment. If they are not on the same network segment, the PC cannot
communicate with the server.
3. Type the user name and password and click Log In to navigate to the window shown
in Figure 11-28.
NOTE
4. In the iMana Web window, choose Common Tasks > Network Configuration in
the navigation tree.
5. Change the IP address, subnet musk, and default gateway address of the BMC
management port in the right pane, as shown in Figure 11-29. Then, click OK.
NOTE
After the IP address of the management port is changed, the BMC web interface is disconnected
from the server. Press the power button to restart the server. Then, log in to the server using
the changed IP address.
Prerequisites
The wireless modem has been installed.
Procedure
Step 1 Log in to the Windows operating system of the NetEco client as administrator.
Step 2 Choose Start > All Programs > Accessories > Communications > HyperTerminal to start
the HyperTerminal.
Step 3 Set up a connection. In this step, enter the name such as modem, as shown in Figure 11-30, and
click OK.
Step 4 Select the serial port for the connection. For example, select COM1, as shown in Figure
11-31, and then click OK.
Step 5 Set properties for the serial port according to Figure 11-32, and click OK.
Step 6 Run the commands in the window shown in Figure 11-33 to start commissioning.
Step 7 Run the following command to check if the modem runs properly.
at
If the system displays OK, then the modem is connected. Otherwise, check whether the cable is
loosely connected to the serial port and whether the serial port configuration conflicts with each
other. If the connection of serial cables is normal and you set the attributes of the serial port
properly, change the value of Bits per seconds if the communication cannot be set up. If the
problem persists, contact Huawei technical support engineers for assistance.
Step 8 Run the following commands to restore and save the default settings:
at&f
at&w
Step 9 Run the following commands to view the version information about the modem:
ati3
at+cgmr
Step 10 Run the following command to view the frequency band about the modem:
at+cgmm
Step 11 Run the following commands to set and save the frequency band information about the modem:
at+wmbs=4
at&w
Table 11-2 lists the commands for setting the frequency band for the modem.
Table 11-2 Commands for setting the frequency band for the modem
Command Function
at+cfun=1
Step 13 Run the following command to check whether the frequency band is set successfully:
at+cgmm
If the setting does not succeed, perform the preceding steps again.
After the setting succeeds, check the indicator on the modem:
l If the indicator blinks slowly, the SIM card is successfully registered, and the frequency band
for the modem can be used.
l If the indicator is always red, the registration of the SIM card fails. If this occurs, contact
Huawei technical support.
----End
Possible Causes
The possible causes of the login failure vary based on the error codes:
l ERROR 1044: The current user does not have the permission to access the MySQL
database.
l ERROR 1045: The user name or password is incorrect.
l ERROR 2002: The MySQL connection file has been deleted.
Procedure
Step 1 On the command-line interface (CLI), run the following command to stop MySQL processes.
# killall -9 mysqld_safe mysqld
Enter password: Password of user root for accessing the MySQL database
Welcome to the MySQL monitor. Commands end with ; or \g.
Your MySQL connection id is 5708
Server version: 5.5.15 MySQL Community Server (GPL)
Copyright (c) 2000, 2010, Oracle and/or its affiliates. All rights reserved.
Type 'help;' or '\h' for help. Type '\c' to clear the current input statement.
mysql>
If the command output similar to the preceding one is displayed, you have logged in to the
MySQL database successfully. If error messages are displayed, contact Huawei technical
support.
----End
Prerequisites
l You have obtained the IP address of the destination server.
l The communication between the PC and the destination server is normal.
l You have obtained the file to be uploaded to the destination server and saved the file to the
PC.
l You have obtained the tool package FileZilla.zip at http://support.huawei.com and
decompressed it to the PC.
You can navigate to Search for software in Software Center and use the package name
as the keyword to quickly locate the tool package.
l You have obtained the account for logging in to the destination server.
Procedure
Step 1 Double click filezilla.exe to start the FileZilla.
Step 2 Set Transfer type. You are advised to set it to Auto.
Perform one of the following operations to set Transfer type:
l Choose Transfer > Transfer type > Auto to set Transfer type to Auto (recommended).
l Choose Transfer > Transfer type > ASCII to set Transfer type to ASCII.
l Choose Transfer > Transfer type > Binary to set Transfer type to Binary.
Port 21
Port 21 is the default port for FTP.
Server Type The NetEco server supports the following file transfer protocols:
1. FTP: common protocol for plaintext file transfer.
2. FTPES: protocol for encrypted file transfer. If you select FTPES, FTP will
be disabled.
NOTE
If you select FTP exist possible security risks, and propose select FTPES ensure the
security of transmission paths.
User Enter a user name on the destination server. The user must have the
permission to access the destination directory.
Password
l Ignore the dialog box displayed during the connection and click OK.
l If the connection is successful, directories on the destination server are displayed in the Remote Site
area.
Step 7 In the Remote site area, set the destination directory on the destination server. For example, /
opt.
After you set the directory, all files in the directory are displayed under the Remote site area.
Step 8 In the Local site area, set the directory of the to-be-uploaded file on the PC. For example, D:
\FILE.
After you set the directory, all files in the directory are displayed under the Local site area.
Step 9 Perform the following operations as required:
Uploads files In the Local site area, right-click the file to be uploaded and choose
Upload from the shortcut menu.
Downloads files In the Remote site area, right-click the file to be downloaded and choose
Download from the shortcut menu.
TIP
If the upload or download fails, click the Failed transfers tab in the lower left area of the FileZilla window.
Then right-click the file that fails to be transferred and choose Reset and requeue selected files from the
shortcut menu to resume the file transfer.
----End
11.16 How Do I Disable Serial CLI Status for the iLO Remote
Management Port
This section describes how to disable Serial CLI Status for the iLO remote management port.
In the short message service (SMS) networking scheme, if an HP DL380 or DL580 server is
used as the NetEco server, you need to disable Serial CLI Status for the iLO remote
management port to ensure that the server can communicate with the SMS modem properly.
Prerequisite
You have logged in to the server through the iLO remote management port. For detailed
operations, see 11.11 How Do I Configure the iLO3 Remote Management Port (DL380)?.
Procedure
1. Restart the server. Then, press F8 or F9 based on the server models to start Integrated
Lights Out (iLO) ROM Based Setup Utility.
2. Use the arrow keys to choose settings > CLI > Serial CLI Status.
12 Appendixes
NOTE
The disks of the RH2285 server are set to RAID1. Therefore, the actual disk space of the server is 1 x 300
GB.
The remaining space is used as the primary and extended partitions of the
uninitialized Ox8E Linux LVM raw device.
NOTE
The disks of the DL380 server are set to RAID5 and hot backup. Therefore, the actual disk space is 3x146
GB.
The remaining space is used as the primary and extended partitions of the
uninitialized Ox8E Linux LVM raw device.
For details about the planning of the host names and IP addresses of the NetEco, see Table
12-3.
Table 12-4 lists the user names and initial passwords required during the installation and
operation of the NetEco system, and their creation time.
SuSE Linux root Changeme_ Super user of the SuSE Linux operating system.
123
BMC root root Default user name and password for the remote
management port on the RH2285 server.
iLO3 Administrat Administrat Default user name and password for the remote
or or management port on the DL380/DL580 server.