Project Scope Example 10
Project Scope Example 10
Project Scope Example 10
PROJECT OBJECTIVE
The aim of the project is to develop and commission an off-grid solar electrification outfit
in Nyita community in Taraba State, Nigeria. . The project will also support the water
supply system of the village which is currently control by the Taraba State Rural Water
Supply Board. To provide a steady supply of electricity to whole community (schools,
farms, local businesses and hospitals etc.). The project cost shouldn’t exceed 1.7 million
dollars with 0.3 million spent on preliminary studies.
DELIVERABLES
• Project will deliver a solar off-grid electrification outfit with a capacity of 500 kWh per day
• Affordable electricity to Nyita, an area with unserved and underserved electrification
• A support for water supply system
MILESTONES
1. Initial milestones are as follows:
• land acquisition
• site clearance
• installation of solar panels
• installation of transmission systems
• distribution and testing
• staff recruitment and training
2. Provide a water supply support and transmission system
3. Keep the cost of electricity as low as possible to provide the towners with
affordable energy.
PROJECT DURATION
2 years
Start date: mm/dd/yy
TECHNICAL REQUIREMENTS
1. Solar panels for 500kwh electricity per day
2. Transmission wires long enough to transfer energy to houses, shops, schools,
almost everywhere in community.
3. A support system for water supply (pipelines, pumps powerful enough)
4. Infrastructure/design to install panels, and transmission that will help with future
maintenance issues.
COMMENTS (handwritten)