Assignment & Project For Hydropwer Engineering
Assignment & Project For Hydropwer Engineering
1) For the10 year monthly stream flow data given table below, determine the Flow Duration
Curve (FDC) by using
a) Class Interval Method
b) Total period approach, and
c) Calendar year approach.
And indicate the catchment characteristics and its suitability for hydropower development
2) Based on the above data shown in equation 1 construct the power duration curve if the
available head is 20 m. Calculate the average potential power and the technically available
power with conveyance efficiency of 70% and overall efficiency of 80%.
3) What are the types of turbines suitable under the following conditions: (a) high head and
low discharge (b) medium head and medium discharge and (c) low head and large
discharge?
4) A generating station has a maximum demand of 25 MW, a load factor of 60%, a plant
capacity factor of 50% and a plant use factor of 72%. Find
iii. Maximum energy that could be produced daily if the plant, while running as
per the schedule, were fully loaded.
Discuss all details of existing and planned hydropower projects systems components in Ethiopian River
basins using masterplan studies and other sources based on the above formulated groups including pre-
feasibility, feasibility, detail design, construction, operation and maintenance studies. The assignment
should include the detail study and designs of Hydraulics and Hydrology and Hydropower intake
structures, Head race tunnels, Forebays and surge tanks, Penstocks, power houses, tailrace tunnels,
turbine selection and settings, cavitation, power production potential, construction costs (detail BOQ)
and other components.