Testing & Commissioning Checklist For Sensor New

Testing & Commissioning Checklist For Sensor

Uploaded by

ifran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views1 page

Testing & Commissioning Checklist For Sensor New

Testing & Commissioning Checklist For Sensor

Uploaded by

ifran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

MINISTRY OF TRANSPORTATION &

TELE COMMUNICATION HQ. BUILDING


CHECK LIST FOR:
Lighting Control Sensor Testing and Commissioning Form No:
(Testing & Commissioning Report) Rev. No : 01
SUBCONTRACTOR Page : 1 of 1
CONTRACTOR
SECTION OF WORK: Lighting Control Motion Sensors LOCATION: Corridors, Closed Offices & Toilets
LEVEL: Sifth Floor IR No.:

Details
Control unit manufacturer : LEVITIN-USA
Building Name : MTT HQ. Building, Muharraq
Panel location : N/A
CONTROL PANEL
Check Yes No Comments
Installation of sensors in the field
Installation of power packs in the field
Proper identification of cables
Proper termination of BELDEN cables
Proper termination of power cables
Setting of sensor delay time
Installtion of override switches
Other (specify)
Field Devices
Check Yes No Comments
Operation of closed office sensors
Operation of corridor & open office sensors
Operation of lift lobby & Toilet sensors
Operation of staircase sensors
Connection of all field devices at their respective
location
CHECK LIST : PRIOR TO ANY TESTING
Description Yes No Comments
Notifications are made to
Building Occupants
Building Management
Others (specify)
SYSTEM TESTS AND INSPECTIONS
Type Visual Functional Comments
230 V Sensors
Low Voltage Sensors
Over-ride manual switches

THE FOLLOWING DID NOT OPERATE CORRECTLY


_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
SYSTEM RESTORED TO NORMAL OPERATION
Date ____________________ Time________________________

ALBAIT AL JAMEEL GHE CLIENT


NAME
SIGN
DATE

Page 1 of 1