Model Terminal Guidelines Rev-01
Model Terminal Guidelines Rev-01
Prepared by : Reviewed by : Issued by: Document Number: Rev. No. Date of Issue:
GAIL/CO/MODEL
GM(O&M)-CO CGM(O&M)-CO ED(O&M)-CO 01 20-05-2019
STN/01/REV
CGM(O&M)-NCR ED(O&M)-NR ED(O&M)-CO GAIL/CO/MODEL STN/01 00 01-09-2017
Prepared by : Reviewed by : Issued by: Document Number: Rev. No. Date of Issue:
GAIL/CO/MODEL
GM(O&M)-CO CGM(O&M)-CO ED(O&M)-CO 01 20-05-2019
STN/01/REV
CGM(O&M)-NCR ED(O&M)-NR ED(O&M)-CO GAIL/CO/MODEL STN/01 00 01-09-2017
PREFACE
Over the years, GAIL as a national pipeline operator has contributed to the growth and development
of natural gas pipeline infrastructure and natural gas market in the country. In this process, GAIL,
since its inception has commissioned various natural & LPG pipeline projects to meet the clean fuel
Terminals & Maintenance Bases) have been commissioned in various phases and with various
thought processes, it is felt essential to develop & devise the MODEL STATION guideline for up
keeping the GAIL’s stations in a unified standard to meet the noble objective of supply and
transportation of natural gas through its state of art natural gas transmission pipeline system in a
sustainable way. The need of model station guidelines are conceptualized by integrating the various
aspect of a gas installation which includes entrance , sign boards, Control Room , Process Area ,
Boundary wall , color coding, Approach Road & internal pathways , Electrical System, Sewerage
Prepared by : Reviewed by : Issued by: Document Number: Rev. No. Date of Issue:
GAIL/CO/MODEL
GM(O&M)-CO CGM(O&M)-CO ED(O&M)-CO 01 20-05-2019
STN/01/REV
CGM(O&M)-NCR ED(O&M)-NR ED(O&M)-CO GAIL/CO/MODEL STN/01 00 01-09-2017
CONTENTS
6. INTERNAL ROADS
8. EXTERNAL DEVELOPMENT
9. PARKING SHED
Prepared by : Reviewed by : Issued by: Document Number: Rev. No. Date of Issue:
GAIL/CO/MODEL
GM(O&M)-CO CGM(O&M)-CO ED(O&M)-CO 01 20-05-2019
STN/01/REV
CGM(O&M)-NCR ED(O&M)-NR ED(O&M)-CO GAIL/CO/MODEL STN/01 00 01-09-2017
1.0 MAIN GATE & BOUNDARY WALL
1.1 M.S. gate of size 4 m/ 5 m (with wicket gate as per requirement) x3 m high shall be provided. The
main entrance gate shall be painted black color with GAIL logo and sign board.
Board should be yellow color and writing over it in black color with GAIL logo.
Prepared by : Reviewed by : Issued by: Document Number: Rev. No. Date of Issue:
GAIL/CO/MODEL
GM(O&M)-CO CGM(O&M)-CO ED(O&M)-CO 01 20-05-2019
STN/01/REV
CGM(O&M)-NCR ED(O&M)-NR ED(O&M)-CO GAIL/CO/MODEL STN/01 00 01-09-2017
i) 3 m high boundary wall with respect to finished ground level of terminal alongwith Y angle with
concertina coil on top of 600 mm height alongwith gate shall be provided for stations.
ii) R.C.C. Frame structure with precast wall panel of 100 mm thickness.
iii) M/s GAIL logo on each boundary wall column.
1.3 PAINTING
2.1 Various warning signs shall be painted & displayed at each terminal such as:-
- Preferably in Water Resistant & Weatherproof Acrylic Sheet or suitable for outdoor
applications
Prepared by : Reviewed by : Issued by: Document Number: Rev. No. Date of Issue:
GAIL/CO/MODEL
GM(O&M)-CO CGM(O&M)-CO ED(O&M)-CO 01 20-05-2019
STN/01/REV
CGM(O&M)-NCR ED(O&M)-NR ED(O&M)-CO GAIL/CO/MODEL STN/01 00 01-09-2017
Material Safety Data
Prepared by : Reviewed by : Issued by: Document Number: Rev. No. Date of Issue:
GAIL/CO/MODEL
GM(O&M)-CO CGM(O&M)-CO ED(O&M)-CO 01 20-05-2019
STN/01/REV
CGM(O&M)-NCR ED(O&M)-NR ED(O&M)-CO GAIL/CO/MODEL STN/01 00 01-09-2017
Assembly Point Sign Board
The external surfaces of building shall be finished with weather resistant External Acrylic Emulsion
Paint.
The internal surfaces of building shall be finished with Acrylic Washable Distemper.
3.2.1 All windows and ventilators shall be aluminum glazed (min. 5mm thick glass). The windows/
ventilators shall be partially/ fully openable or sliding windows as per requirement.
3.2.2 All doors shall be aluminium glazed (min. 5mm thick glass) / laminated with prelaminated particle
board as per requirement.
3.2.3 Toilet doors shall be of high grade PVC with PVC door frame.
3.2.4 Glass: Tinted (Smoke Grey color) for doors and windows
Frosted for Toilet ventilators
4.1 R.C.C Paving shall be provided for entire process area with approach road to internal road.
4.2 Color coding of piping shall be followed as per ANSI/ ASME A13.1 – 2007.
As per above code, color of piping of various services shall be as per below mentioned table
Prepared by : Reviewed by : Issued by: Document Number: Rev. No. Date of Issue:
GAIL/CO/MODEL
GM(O&M)-CO CGM(O&M)-CO ED(O&M)-CO 01 20-05-2019
STN/01/REV
CGM(O&M)-NCR ED(O&M)-NR ED(O&M)-CO GAIL/CO/MODEL STN/01 00 01-09-2017
Black on
FLAMMABLE
Yellow
Markers shall be located so that they are readily visible to plant personnel from the point of normal
approach. Pipe markers shall indicate about pipe contents, direction of flow and whether hazardous or
safe, outside diameter of pipe, piping material specification etc.
Prepared by : Reviewed by : Issued by: Document Number: Rev. No. Date of Issue:
GAIL/CO/MODEL
GM(O&M)-CO CGM(O&M)-CO ED(O&M)-CO 01 20-05-2019
STN/01/REV
CGM(O&M)-NCR ED(O&M)-NR ED(O&M)-CO GAIL/CO/MODEL STN/01 00 01-09-2017
Place of Markers”
• To indicate direction of flow by labeling with arrows at one or both ends of the lable
• To be visible from the point of normal approach near valves, flanges and changes in pipe
direction
• Both sides of ceiling, wall or floor penetrations
• At any line entry or re-entry point
• On straight pipe runs
• Every 50 feet
5.1 Chain link fencing shall be of 3 m height. Barbed wire fence of 0.6 m height shall be provided on top
of chain link fencing.
5.2 Aluminium Paint of Silver colour on chain link fencing and barbed wire.
Prepared by : Reviewed by : Issued by: Document Number: Rev. No. Date of Issue:
GAIL/CO/MODEL
GM(O&M)-CO CGM(O&M)-CO ED(O&M)-CO 01 20-05-2019
STN/01/REV
CGM(O&M)-NCR ED(O&M)-NR ED(O&M)-CO GAIL/CO/MODEL STN/01 00 01-09-2017
7.0 STORM WATER DRAINAGE
7.1 Open brick masonry drains shall be provided on both sides of the roads and also on inside periphery
of plot.
Prepared by : Reviewed by : Issued by: Document Number: Rev. No. Date of Issue:
GAIL/CO/MODEL
GM(O&M)-CO CGM(O&M)-CO ED(O&M)-CO 01 20-05-2019
STN/01/REV
CGM(O&M)-NCR ED(O&M)-NR ED(O&M)-CO GAIL/CO/MODEL STN/01 00 01-09-2017
9.0 PARKING SHED
At all manned terminal vehicle parking shed of adequate size shall be provided considering space
availability inside/ outside the terminal.
As per requirement of O&M Storage shed may be constructed at selected SV/IP station on the
pipeline under the jurisdiction of respective maintenance base of each region of GAIL. The typical
design of Storage shed attached as (Annexure-1) of this document may be referred. However the
same may be altered/modified to fit with the size of vacant space/area available as well as
requirement of maintenance base at the location.
Prepared by : Reviewed by : Issued by: Document Number: Rev. No. Date of Issue:
GAIL/CO/MODEL
GM(O&M)-CO CGM(O&M)-CO ED(O&M)-CO 01 20-05-2019
STN/01/REV
CGM(O&M)-NCR ED(O&M)-NR ED(O&M)-CO GAIL/CO/MODEL STN/01 00 01-09-2017
Category-2: Land does not belong to GAIL
Prepared by : Reviewed by : Issued by: Document Number: Rev. No. Date of Issue:
GAIL/CO/MODEL
GM(O&M)-CO CGM(O&M)-CO ED(O&M)-CO 01 20-05-2019
STN/01/REV
CGM(O&M)-NCR ED(O&M)-NR ED(O&M)-CO GAIL/CO/MODEL STN/01 00 01-09-2017
o
z
=
.E
UO
,:.2_
Y <+
V V< zo
= =o F
o
:::
S S=
I z
o
E HS U
o
t-r F
F
D
rO
cz
IF
l1
5E
F
U
r!
a
,rel ol,,
qJ
ZL
5:
Oil
1r" 1)
@
IJ]
()
&
d
14
F
@_r
co
I
zt
Fll
O AI