Template Description
This template is intended to be used as a guide for informational purposes only and not for the purpose
Number Title
Internal Inspection
5.1
Internal Inspection
6.1
PT Engineer Inspection
6.2
Obtain Subcontractor ITP
6.3
7 PENETRATIONS & CAST-INS
Internal Inspection
7.1
ional purposes only and not for the purpose of providing legal advice. It should be adapted to your company's bestonpractices and project-sp
(configurable
Acceptance Criteria References project)
-
Certified by Temp Works Engineer
-
Temp Works Engineer to Inspect prior to pouring concrete
-
Subcontractor to submit ITP
-
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10.
4
4.1
4.2
4.3
4.4
4.5
5
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.1
5.11
5.12
5.13
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10.
6.11.
7
7
7.1
7.2
7.3
7.4
7.5
7.6
8
8.1
8.2
8.3
9
9.1
9.2
9.3
9.4
9.5
9.6
9.7
10
10.1
10.2
10.3
10.4
Inspection Template Name: Formwork & Concrete Quality Checklist
Title
Design Elements
Concrete mix approved
Required MPA?
Required Finish/Class?
Waterproofing additive mixture/treatment?
Slump (mm)?
Curing Compound?
Formwork Type
Subcontractors, Suppliers, Consultant Details
Subcontractors, Suppliers, Consultant Details
Geotech Engineer
Structural Engineer/s
Temp Works Engineer
Building Surveyor
Concrete S/C
Formwork S/C
Piling S/C
1.0 CONCRETE PREPOUR CHECKS (PILE CAPS/BEAMS/ FOOTINGS/ SLAB ON GROUND/ LIFT PITS/ DETENTIO
Check drawing No. & latest rev is being used by subcontractor
Check blinding (per specifications)
Check Termite Protection in place
Check in-ground services installed under slab
Check reinforcement of capping beam
Check vapour barrier lapped/taped
Check membrane requirements for pits (per specification)
Cleaned & excess spoil removed
Drawing/ Mud Map completed. Drawing/ mud-map prepared with applicable areas highlighted
Geotech engineering sign off of foundation material. Check all issues raised by engineer are completed and signed-off
2.0 COLUMNS & INSITU WALLS
Check drawing No. & latest rev is being used by subcontractor
Set-out, plumb, rebates, recesses, etc
Starter bars (cast in) & scabble
Column formwork support system
Shutters clean & clear of debris
3.0 FORMWORK
Check drawing No. & latest rev is being used by subcontractor
Formwork design received -certified by temp. works engineer
Formwork installed per design including formwork components as per design, extension of screw jacks within specified limits, or
location of formwork components as per design. Check all issues raised by engineer are completed and signed-off
Back propping/Stripping procedure provided by temp. works engineer
Design allows adequate room for PT stressing
Back propping to lower floors in place per engineer’s design
Form face integrity (e.g. balcony class 2)
Level, plumb, set downs, rebates, recesses, hobs
Check edge rebates, blackouts, set downs, cast in items
Drip Groove/Overflows
Form face clear of debris
Formwork installed as per design including formwork components as per design, extension of screw jacks within specified limits,
location of formwork components as per design
Formwork inspected by temp. works engineer prior to pouring concrete
4.0 CORE SYSTEM
Check drawing No. & latest rev is being used by subcontractor
Design available and certified by structural engineer
Check shutter verticality as-built from previous level provided and corrections made
Check services penetrations installed
Check vertical & horizontal Reinforcement
Check header Beams & Additional Bars
Check door support beams
Check external & Internal Shutters (Z ties)
Check starter bars for horizontal elements
Check lift Unistrut's & call buttons
Check protection decks, working platforms, winch beams installed
5.0 REINFORCEMENT
Check drawing No. & latest rev is being used by subcontractor
Reinforcement installation per design
Lap lengths
Cover
Chairs/Supports (plastic where required)
Qualified engineer inspection per site specific requirement. Check all issues raised by engineer are completed and signed-off. Mi
regime below – Pad footings/pile caps 100% Rafts 100% Critical structural elements as identified by structural engineer or certif
Core/shear walls – first of each type, each critical element, minimum 30% remaining at regular intervals Columns – first of each t
column, minimum 30% remaining at regular intervals Slabs – 100%. Check all issues raised by engineer are completed and signed
Photographic record of completed reinforcement prior to placing concrete
6.0 POST TENSIONING
Installation as per design
Stressing Final complete (attach Tendon extension report). Submit to PT engineer for approval
PT Engineer’ s inspection completed. Check all issues raised by engineer are completed and signed-off
7.0 PENETRATIONS
Located as per design
Hydraulics
Mechanical
Electrical
Sprinkler/Fire
Bin Chute (cast in supplied)
Miscellaneous Cast in items - List
8.0 POST-POUR CHECKS
Concrete curing completed
PT grouting completed
As built survey to check levels/set downs/penos are within tolerance
Concrete test reports verify design concrete strength
Response
[Procore] Yes/No
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text