Key Plan: Project Affairs
Key Plan: Project Affairs
Key Plan: Project Affairs
KEY PLAN
SAT
.
A A
.
.
LEGEND-FUEL SYSTEM (ELECTRICAL)
SYMBOLS DESCRIPTION
B CHECK VALVE (CHV) 2) DRAWINGS TO BE READ IN CONJUNCTION WITH OTHER DISCIPLINES DRAWINGS. B
3) THE ALL EARTH PIT & EARTHING CONNECTION FOR THE FUEL SYTEM SHALL BE
UNION (UN)
DONE BY MEP CONTRACTOR
SOLENOID VALVE (SOV) 4) APPROVED MAS REF # CDCBP-P086-CP02A-JEC-MS-0089
RELAY PANEL
C0
F
F
CONTRACTOR
B
SUB-CONTRACTOR
PROJECT
CENTRAL DOHA & CORNICHE
G G
BEAUTIFICATION PROJECT
PACKAGE 2A
PROJECT CODE
FUEL SYSTEM -
ELECTRICAL RISER SCHEMATIC DIAGRAM
DESIGNED STATUS
SA SHOP DRAWING
H CHECKED SA APPROVAL SA H
CDCBP-P086-CP02A-JEC-SD-ME-0005 00
1 2 3 4 5 6 7 8 9 10 11 12