MEP KRA

S.No Description Remarks


Review of sewer , storm and plumbing drawing
1 and coordinate with architect if any change
required .
Implementation of all MEP related works as per
2
drawing.

Proper Check for the material required , it shoud


3
be best in market in form of quality and delivery.

Testing of all work with proper checklist and


4
snagging.
To ensure there should be minimum waste of
5
material.
To check with landscaping consulatnt regading
6 new devalopment (If any ) and maintain the
existing green area.

7 Keep in touch with management for any new


plans or any suggestion fromn their side

8 To coordinate with PMC regarding ongoing work


in flats and villas.

9 To close the pending DLP complaints after


coordinating with management team.
10 Plan for daily manpower required (On call basis)
Electrical

Check drawings and requirements generated by vendor


cross check the requirement and discuss with management .
Coordinate with purchase team and get best rates with minimum delivery time.
Store the material in a secured area.
Excavation of Berm and Road as per drawing
Laying of DWC pipe as per drawing
Cabeling work as per senction load
Fixing of panels after complettion of civil work.
Street lights fixing after completion of base work.

Sewer and storm line

Check drawings and requirements generated by vendor


cross check the requirement and discuss with management .
Coordinate with purchase team and get best rates with minimum delivery time.
Store the material in a secured area.
Excavation of sides of road area as per drawing
Laying down of cemented pipes
To ensure proper construction of chambers and covers with proper colour code.
check levels and slope should be as per drawing
Check joints to be proper fixed
After proper fixing ,conduct the testing to check the leakage, slope of water flow, and any obstruction in water flo.
Filling proper soil in every corner of pipe.
To Ensure all lines must be conected to respective lines i.e rain water to storm line and same others.

Water line

Check drawings and requirements generated by vendor


cross check the requirement and discuss with management .
Coordinate with purchase team and get best rates with minimum delivery time.
Store the material in a secured area.
Excavation of sides of road area as per drawing
Laying down of uPVC pipes as per drawing
Check all joints made are proper and have no leakage in this .
Connect the water line to the main borewell line.
Fill the pipes with sand properly.
Test the line pressure and other tests (If any)

STP,DG
Check drawings and requirements generated by vendor
cross check the requirement and discuss with management .
Coordinate with purchase team and get best rates with minimum delivery time.
Store the material in a secured area.
y obstruction in water flo.