0% found this document useful (0 votes)
114 views9 pages

Civil Spec-Site Preparation

PTG-00-CIV-SPC-001

Uploaded by

sugeng wahyudi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
114 views9 pages

Civil Spec-Site Preparation

PTG-00-CIV-SPC-001

Uploaded by

sugeng wahyudi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 9
si PERTAGAS GENERAL SPECIFICATION MP PERTAMINAGAS ‘Authors Org. [ Engineering CIVIL GENERAL SPECIFICATION SITE PREPARATION Proap-v-spc-01 5 a oa ae 7 [Neen ea [aa [eu [Pl [Pele [Se y x JP PMMA AS GENERAL SPECIFICATION ‘DOCUMENT NO, ‘DOCUMENT TIME REV PIGOCEN-SPC ODI ‘SITE PREPARATION ae eres 54 52 53 54 55 56 57 58 59 5.10 511 512 513 ‘TABLE OF CONTENTS INTRODUCTION. SCOPE. DEFINITION £ CODE AND STANDARDS DESIGN REQUIREMENTS, Measuremens Survey. Clearing and Removal Desig of Drainage Channel Relocation. Backfiting Works. Compacting Checking of Compacting Qualty. Temporary Fence and Secuty Post. Temporary Electric Lighting ‘lecation of Project Ofc Temporary Rosd and Tete Sign, Temporary Drainage ToolKit and Safty Equement. Taking Care of Permits, 6. MOBILIZATION. x JP PRUMINAGAS (GENERAL SPECIFICATION DOCUWENT NO, ‘DOCUMENT TITLE REV [Frececwarcon | SWE PREPARATION |? 1] 4. INTRODUCTION PT Perarinn Gas (Pertane) plano bud ppeine and ga elites. 2. SCOPE ‘The soap of is spect sto determine he minum requirement be vend on laning snd executing ofS refaraton wort. This specication shal e apple at he project se such ‘ipline Rion of Way (RON), Line Break Convo Vave (LECY), Metering Staten, Comoresor Staten, Seca and ther nasiacire lacie requed fo efly and support he proc, 3. DEFINITION ‘Tha dations contains this dacumsnt ar a flaws | COMPANY PT Peraina Gat CONTRACTOR, The pany whic gowdes services to ero pat ofthe Contact Soape of Wot as stats by PT Pertamin Gas (6. VENDORMANUFACTURER, Tho party which provides manvfacures equpmont atari spc nd rdeedby CONTRACTOR canes and paris od snd gp Soe 4, CODE AND STANDARDS Requrementsappled in ste reparaton shall be in accordance with he follwing stands and specications Relatons of Sle Using a 2.9 (85: Rename nd a 305-0 (124) Drop Relations of Sols Using a4.5-bg (105) Rammer and a «57am (1840) Drop x JP Pam cas, GENERAL SPECIFICATION | BocuMENTNo. | ——_—pocuweNT TLE] REV) FIEHLGWSPCOOL ‘STE PREPARATION T ‘Standard Methed c Test for Dens of Sl b-Placs by The Sand one 14 ASTMD690-12 Standard Test Methods for Laortary Compaction Charstaras of ‘Sal Using Standard Ee (12400 fe (600 kN) ‘9. ASTMD1S5690 Stands Test Method for Density and Unt Weight of Sin Pace by the Sond-Cone Mod [ASTM DISST42 Standard Tes Mnogs or Laboratory Compaction Character ot Sol Using sti fer (8.00 FUR (2.700 KN-mn). 5. DESIGN REQUIREMENTS 51 Measurement Survey onctpepeation wok nd opogrphi survey of stare Et nd mae iit pots 1 stout Br, Prior o conmance cf wrk, MEBEUMENE SUEY Work pln tA De epost tthe COMPANY for aperva 52 Clearing and Removal ‘ee within the boundary Its as shown te desgn drawing sal be lard fa wae, ants, ot, bushes, op sll and ane exsing obstcton, Removal or poe bod ell ‘op sol down w bikes releing tos investgason report an bere og data shall be ‘arred a. Te suros fom cut wees shall be rrnovd by digging downto he rats ed ‘ehots shale fied an compacted, 53 Design of Drainage Channa Relocation “ho CONTRACTOR shal propose a redesle of nw drainage system elering to eusing sinage syste, any, wih dale description end shal bs onthe CONPANY's aproal rorto commence oframoval nd arin ware, “he CONTRACTOR chal parm & rovow of existing dinage eyten athe ecaton, ake enginesing caedaton canfoming o exting suey data and rbuld new drainage system, x JP PRUMINAGAS (GENERAL SPECIFICATION DOCUMENT NO, ‘DOCUMENT TITLE] REV] PIE-OGGW-SPCOO ‘STE PREPARATION 7 54 Backfting snd Excavation Works Backing and excavation works st inended to obtin a grade eovton suitable for 3 partclar consucon plan. For some lcatens on ste, there might be seas hat need tacting and excavating was defending on he designed seat. Becaling snd excavation works means the work ranging fom, bi nat Imted to, sslecing snd inspecting of sl, rior op sll bad sa, moving so at meets He requrements 10 ste and moving excess sl cut of the lester, layng, compact. excavation, checking of Sal quslly sd quanty for areas whareconsucon works wil 585° Compacting Compacting was basal an afer to rearange sal priciest, y reducing spaces betwsen sol ors to reach cecaly packed gains lo reduce sot povoaly nd rhe inoroces ‘Tha CONTRACTOR shall compact the soll © 95% maximum dry con or otherwise tiplte by he COMPANY. Compaction sha be cared et on ach 20 30 em ick st layer when contig embankment fl Facts aecing the sol compacting work are watr content type of compass aqument ana:yp0 of sl Before cormecing compaction werk en ste, sol sample shal be sent th abo obtaln 1s optimum wer content and maximum ry deny by compaction est ‘Compaction tes nthe labora shal be cari out ie pafomance wih the appcale ‘fonda. Type of compaction et are detaled a fotows 1. Stansrd Procter Tes (ASTI DESOIAASHTO T38) ‘+ Solware compact in the ube inde + Spectcatonscompectr an est 1. Hammer +550 ,2549) x [PP PRTAMNASAS GENERAL SPECIFICATION [ BOCuNEENT RO: DOCOWENT THLE Rev [ Fremcevsrcoar ‘SITE PREPARATION 7 2, Fallnht = 1 (205 en) 2. Naber flyers Soyer 4. Number ot doptayer #25 5. Compscion energy = 505i? 8. Typesofsal =Pessirg seve no. 4 ‘+The cxpaiment were condicted minim 5 nes wth erent water ees ‘+ Aner hecompacie, specimen were weighed the vols weigh and measured be Modis Proctor Test(ASTIADISSTIAASHTO T180) ‘+ Sol were conte inthe be ender 1+ Specteatons compactor and testing 4. ane #108 (049) 2. Fatal s1se 2. Nomberof vers Stayer 4 Nunberottoptayer = 25 5. Energy compaction = 2608” 6. Tyner fo = Passing love no 4 ‘+The experiments ware conducted minimum 5 ines wth teen water 1+ Ata he canpadted spacinen were weighed the vou weight an massa the ‘Te moisture te ao tens determined inthe abraary. The volume of hy wei ofthe ea can be clits as flows: where » JP Pam AS. (GENERAL SPECIFICATION ‘DOCUMENT NO: DOCUWENT THLE REV Fresco | ‘SITE PREPARATION o : = vom of ry wlohe « pereaniage of war cnn (8) 55 Checking of Compacting Quaity Compaction conte habe cad eut srg a Send Cone Teton every ayer, at 40 pois cenforning to AASHTO 191-1 o ASTM D1856-00 57 Temporary Fence ana Security Post “The contin se, drng the contin peso shal have aterporay secu fence round the site wih Regt of2m above he cur Temporary secety fence is made by doken poss wth minimum damater of 7:5 om and sera Between doen posts ef 3m. The aoken posts sre embedded deep enough ia ound t stad rly © prevent the possbity of ealapshg. Adina support can be ended onc itis eared 3 pers concen. Barbed wri insaled on te tmporary sacl ence between the doen posts spaced 20am ng al fence hei ‘Ta temporary cecury fance shal reve ath etry gato and ain xt ge contoring to {2e resuements nin parc arss, f aquted, enargeny ante shal be intl “Temporary secur fae hal beta an ouside an is ped minum 1.0 mar ‘tam paranet ence Main onty ané ext gales shal have adequate socunty poss for he reeds of secuity The tompararysecury fence and he securly poss shal be desgned ard shat have approval fom he COMPANY, 5B Temporary Elect Lighting Forte smathness of wrk acy and seunty construon ste, susie acti hing shal be provid on temporary support blkngs, at particular places considered required reg te ste preparation work pecomance gered snd duing the constuction work perio (JP PARTAMNA CAS (GENERAL SPECIFICATION [eet mena eat DOCUMENT NO. DOCUWENT TILE REV PICCRGW-SPC OD ‘SITE PREPARATION z “The slecicy powerignerter ses shal sipely eecy sutcenty confoming to safety raquremons forse the required cece ghng avatbilly onthe conucton ste tog the wor Prior to commence, temporary elctcly Igenerator set Supp and lecte Iahtng insislaton pan sal btn an aporova tom he COMPANY. 159 Allocation of Project Ofte Performing measurement works, making posts, land cemeacing an eating to prpare tne base area for roc ofes alocsion ‘Talon base ofthe projet offs shal tert the design drawing atest approved yin cOMPanY. {40 Temporary Road and Tei Signs Entry an eat ate of he constuction st anh range he constuction area shal be dasigned wth emporay rac forthe ease of material and personnal moblzaton dung ‘hose prepartion exzcton ar dung the eanatueton work excaton. ‘uring the se preparation perod and curing the constuction wrk pid, to prevent ooeing and ate oud, atsroorary ins este shale made to calc nc ov ‘sirlace water of fom constuction ea due to rafal ap calc and fow sewer wae: ‘rm supe bulngsin he contin tos. “Tho tomporry einage channel is designed with Yapazid shape with wet pole ars, ope, si eapaciy scien to ealet end flows surece water sewer water rom sport bling in clay rape otomporary ponds provided ute the construction area and aerate, tom the por, it aves ce fows to local srinage system avail in the ety of te eatin, ‘Several ponds might nad o be prove tthe construct ses, fonctening a trporany ‘anise ror foward to focal danage syst exstng near the ste. Te ponds shal be beck aa and compacted property im gee requed at a permanant dinage ‘stom corsrstn hab been complies ed funcons propery ae a canepe channel system x JP PRUNNAGAS GENERAL SPECIFICATION DOCUMENT RO, DOCUMENT TIE REV PIGOCEN-SPCODI STE PREPARATION T {42 ToolKit and Safety Euipment [CONTRACTOR shal provide and make. form fait and aft equipment equted ing ste propsatin and uring enstucten “The safety ostpment suchas safety shoss, bane, gloves, ee ens be provided the same quarty wih the cunber of persannel assigned dung ste preperaton, snd ‘ooreter,ecporcnaly avalatle of the number of palsnnelassignad asing te enetucion pees, and shall met the standards. Th cualy of to kt an salty ‘upment used shall be sproued by the COMPANY, 513 Taking Cae of Permits “The CONTRACTOR shall manage permis In conducting werk dng the project duration ‘+ Permis tom Local Govermnt relied to Buking Permit, rad usage permit om the Road Tse foe (OLLI, ‘+ Permit fom th cher goverment bodes suchas Mint of Puble Wack - Ofoe of legaon, Sas Besar Sigs. be Directorate Gener of irigton, oc. Al cont of he _storamelonad pes habe cluded nthe bi ro in conccing the work, 6. MOBILIZATION Prior to exocuton of sts prepara, sto persome, heavy equpmeny, teal, slay equpment nd regu offer equoment sal have beon provided on sto such as fut, wring tos, oskop computer compete wth nawor sytem and maces for ute athe pet eatin. [Al the above menioned equbment shal be bought 10 the consructon st In we worthy conden, functions sropery and dung moitzaten, & mained to prevent damage, and possible, sal utlze excodton procedure senda Motion work tal be on sepa‘ rm the COMPANY. be response on every damage on any properties owned by thd partes ‘ie to motizson and consucion ati uch 8 damage ta pub road, cue chan ee,

You might also like