Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
114 views
9 pages
Civil Spec-Site Preparation
PTG-00-CIV-SPC-001
Uploaded by
sugeng wahyudi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save Civil Spec-Site Preparation For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
114 views
9 pages
Civil Spec-Site Preparation
PTG-00-CIV-SPC-001
Uploaded by
sugeng wahyudi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save Civil Spec-Site Preparation For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save Civil Spec-Site Preparation For Later
You are on page 1
/ 9
Search
Fullscreen
si PERTAGAS GENERAL SPECIFICATION MP PERTAMINAGAS ‘Authors Org. [ Engineering CIVIL GENERAL SPECIFICATION SITE PREPARATION Proap-v-spc-01 5 a oa ae 7 [Neen ea [aa [eu [Pl [Pele [Se yx JP PMMA AS GENERAL SPECIFICATION ‘DOCUMENT NO, ‘DOCUMENT TIME REV PIGOCEN-SPC ODI ‘SITE PREPARATION ae eres 54 52 53 54 55 56 57 58 59 5.10 511 512 513 ‘TABLE OF CONTENTS INTRODUCTION. SCOPE. DEFINITION £ CODE AND STANDARDS DESIGN REQUIREMENTS, Measuremens Survey. Clearing and Removal Desig of Drainage Channel Relocation. Backfiting Works. Compacting Checking of Compacting Qualty. Temporary Fence and Secuty Post. Temporary Electric Lighting ‘lecation of Project Ofc Temporary Rosd and Tete Sign, Temporary Drainage ToolKit and Safty Equement. Taking Care of Permits, 6. MOBILIZATION.x JP PRUMINAGAS (GENERAL SPECIFICATION DOCUWENT NO, ‘DOCUMENT TITLE REV [Frececwarcon | SWE PREPARATION |? 1] 4. INTRODUCTION PT Perarinn Gas (Pertane) plano bud ppeine and ga elites. 2. SCOPE ‘The soap of is spect sto determine he minum requirement be vend on laning snd executing ofS refaraton wort. This specication shal e apple at he project se such ‘ipline Rion of Way (RON), Line Break Convo Vave (LECY), Metering Staten, Comoresor Staten, Seca and ther nasiacire lacie requed fo efly and support he proc, 3. DEFINITION ‘Tha dations contains this dacumsnt ar a flaws | COMPANY PT Peraina Gat CONTRACTOR, The pany whic gowdes services to ero pat ofthe Contact Soape of Wot as stats by PT Pertamin Gas (6. VENDORMANUFACTURER, Tho party which provides manvfacures equpmont atari spc nd rdeedby CONTRACTOR canes and paris od snd gp Soe 4, CODE AND STANDARDS Requrementsappled in ste reparaton shall be in accordance with he follwing stands and specications Relatons of Sle Using a 2.9 (85: Rename nd a 305-0 (124) Drop Relations of Sols Using a4.5-bg (105) Rammer and a «57am (1840) Dropx JP Pam cas, GENERAL SPECIFICATION | BocuMENTNo. | ——_—pocuweNT TLE] REV) FIEHLGWSPCOOL ‘STE PREPARATION T ‘Standard Methed c Test for Dens of Sl b-Placs by The Sand one 14 ASTMD690-12 Standard Test Methods for Laortary Compaction Charstaras of ‘Sal Using Standard Ee (12400 fe (600 kN) ‘9. ASTMD1S5690 Stands Test Method for Density and Unt Weight of Sin Pace by the Sond-Cone Mod [ASTM DISST42 Standard Tes Mnogs or Laboratory Compaction Character ot Sol Using sti fer (8.00 FUR (2.700 KN-mn). 5. DESIGN REQUIREMENTS 51 Measurement Survey onctpepeation wok nd opogrphi survey of stare Et nd mae iit pots 1 stout Br, Prior o conmance cf wrk, MEBEUMENE SUEY Work pln tA De epost tthe COMPANY for aperva 52 Clearing and Removal ‘ee within the boundary Its as shown te desgn drawing sal be lard fa wae, ants, ot, bushes, op sll and ane exsing obstcton, Removal or poe bod ell ‘op sol down w bikes releing tos investgason report an bere og data shall be ‘arred a. Te suros fom cut wees shall be rrnovd by digging downto he rats ed ‘ehots shale fied an compacted, 53 Design of Drainage Channa Relocation “ho CONTRACTOR shal propose a redesle of nw drainage system elering to eusing sinage syste, any, wih dale description end shal bs onthe CONPANY's aproal rorto commence oframoval nd arin ware, “he CONTRACTOR chal parm & rovow of existing dinage eyten athe ecaton, ake enginesing caedaton canfoming o exting suey data and rbuld new drainage system,x JP PRUMINAGAS (GENERAL SPECIFICATION DOCUMENT NO, ‘DOCUMENT TITLE] REV] PIE-OGGW-SPCOO ‘STE PREPARATION 7 54 Backfting snd Excavation Works Backing and excavation works st inended to obtin a grade eovton suitable for 3 partclar consucon plan. For some lcatens on ste, there might be seas hat need tacting and excavating was defending on he designed seat. Becaling snd excavation works means the work ranging fom, bi nat Imted to, sslecing snd inspecting of sl, rior op sll bad sa, moving so at meets He requrements 10 ste and moving excess sl cut of the lester, layng, compact. excavation, checking of Sal quslly sd quanty for areas whareconsucon works wil 585° Compacting Compacting was basal an afer to rearange sal priciest, y reducing spaces betwsen sol ors to reach cecaly packed gains lo reduce sot povoaly nd rhe inoroces ‘Tha CONTRACTOR shall compact the soll © 95% maximum dry con or otherwise tiplte by he COMPANY. Compaction sha be cared et on ach 20 30 em ick st layer when contig embankment fl Facts aecing the sol compacting work are watr content type of compass aqument ana:yp0 of sl Before cormecing compaction werk en ste, sol sample shal be sent th abo obtaln 1s optimum wer content and maximum ry deny by compaction est ‘Compaction tes nthe labora shal be cari out ie pafomance wih the appcale ‘fonda. Type of compaction et are detaled a fotows 1. Stansrd Procter Tes (ASTI DESOIAASHTO T38) ‘+ Solware compact in the ube inde + Spectcatonscompectr an est 1. Hammer +550 ,2549)x [PP PRTAMNASAS GENERAL SPECIFICATION [ BOCuNEENT RO: DOCOWENT THLE Rev [ Fremcevsrcoar ‘SITE PREPARATION 7 2, Fallnht = 1 (205 en) 2. Naber flyers Soyer 4. Number ot doptayer #25 5. Compscion energy = 505i? 8. Typesofsal =Pessirg seve no. 4 ‘+The cxpaiment were condicted minim 5 nes wth erent water ees ‘+ Aner hecompacie, specimen were weighed the vols weigh and measured be Modis Proctor Test(ASTIADISSTIAASHTO T180) ‘+ Sol were conte inthe be ender 1+ Specteatons compactor and testing 4. ane #108 (049) 2. Fatal s1se 2. Nomberof vers Stayer 4 Nunberottoptayer = 25 5. Energy compaction = 2608” 6. Tyner fo = Passing love no 4 ‘+The experiments ware conducted minimum 5 ines wth teen water 1+ Ata he canpadted spacinen were weighed the vou weight an massa the ‘Te moisture te ao tens determined inthe abraary. The volume of hy wei ofthe ea can be clits as flows: where» JP Pam AS. (GENERAL SPECIFICATION ‘DOCUMENT NO: DOCUWENT THLE REV Fresco | ‘SITE PREPARATION o : = vom of ry wlohe « pereaniage of war cnn (8) 55 Checking of Compacting Quaity Compaction conte habe cad eut srg a Send Cone Teton every ayer, at 40 pois cenforning to AASHTO 191-1 o ASTM D1856-00 57 Temporary Fence ana Security Post “The contin se, drng the contin peso shal have aterporay secu fence round the site wih Regt of2m above he cur Temporary secety fence is made by doken poss wth minimum damater of 7:5 om and sera Between doen posts ef 3m. The aoken posts sre embedded deep enough ia ound t stad rly © prevent the possbity of ealapshg. Adina support can be ended onc itis eared 3 pers concen. Barbed wri insaled on te tmporary sacl ence between the doen posts spaced 20am ng al fence hei ‘Ta temporary cecury fance shal reve ath etry gato and ain xt ge contoring to {2e resuements nin parc arss, f aquted, enargeny ante shal be intl “Temporary secur fae hal beta an ouside an is ped minum 1.0 mar ‘tam paranet ence Main onty ané ext gales shal have adequate socunty poss for he reeds of secuity The tompararysecury fence and he securly poss shal be desgned ard shat have approval fom he COMPANY, 5B Temporary Elect Lighting Forte smathness of wrk acy and seunty construon ste, susie acti hing shal be provid on temporary support blkngs, at particular places considered required reg te ste preparation work pecomance gered snd duing the constuction work perio(JP PARTAMNA CAS (GENERAL SPECIFICATION [eet mena eat DOCUMENT NO. DOCUWENT TILE REV PICCRGW-SPC OD ‘SITE PREPARATION z “The slecicy powerignerter ses shal sipely eecy sutcenty confoming to safety raquremons forse the required cece ghng avatbilly onthe conucton ste tog the wor Prior to commence, temporary elctcly Igenerator set Supp and lecte Iahtng insislaton pan sal btn an aporova tom he COMPANY. 159 Allocation of Project Ofte Performing measurement works, making posts, land cemeacing an eating to prpare tne base area for roc ofes alocsion ‘Talon base ofthe projet offs shal tert the design drawing atest approved yin cOMPanY. {40 Temporary Road and Tei Signs Entry an eat ate of he constuction st anh range he constuction area shal be dasigned wth emporay rac forthe ease of material and personnal moblzaton dung ‘hose prepartion exzcton ar dung the eanatueton work excaton. ‘uring the se preparation perod and curing the constuction wrk pid, to prevent ooeing and ate oud, atsroorary ins este shale made to calc nc ov ‘sirlace water of fom constuction ea due to rafal ap calc and fow sewer wae: ‘rm supe bulngsin he contin tos. “Tho tomporry einage channel is designed with Yapazid shape with wet pole ars, ope, si eapaciy scien to ealet end flows surece water sewer water rom sport bling in clay rape otomporary ponds provided ute the construction area and aerate, tom the por, it aves ce fows to local srinage system avail in the ety of te eatin, ‘Several ponds might nad o be prove tthe construct ses, fonctening a trporany ‘anise ror foward to focal danage syst exstng near the ste. Te ponds shal be beck aa and compacted property im gee requed at a permanant dinage ‘stom corsrstn hab been complies ed funcons propery ae a canepe channel systemx JP PRUNNAGAS GENERAL SPECIFICATION DOCUMENT RO, DOCUMENT TIE REV PIGOCEN-SPCODI STE PREPARATION T {42 ToolKit and Safety Euipment [CONTRACTOR shal provide and make. form fait and aft equipment equted ing ste propsatin and uring enstucten “The safety ostpment suchas safety shoss, bane, gloves, ee ens be provided the same quarty wih the cunber of persannel assigned dung ste preperaton, snd ‘ooreter,ecporcnaly avalatle of the number of palsnnelassignad asing te enetucion pees, and shall met the standards. Th cualy of to kt an salty ‘upment used shall be sproued by the COMPANY, 513 Taking Cae of Permits “The CONTRACTOR shall manage permis In conducting werk dng the project duration ‘+ Permis tom Local Govermnt relied to Buking Permit, rad usage permit om the Road Tse foe (OLLI, ‘+ Permit fom th cher goverment bodes suchas Mint of Puble Wack - Ofoe of legaon, Sas Besar Sigs. be Directorate Gener of irigton, oc. Al cont of he _storamelonad pes habe cluded nthe bi ro in conccing the work, 6. MOBILIZATION Prior to exocuton of sts prepara, sto persome, heavy equpmeny, teal, slay equpment nd regu offer equoment sal have beon provided on sto such as fut, wring tos, oskop computer compete wth nawor sytem and maces for ute athe pet eatin. [Al the above menioned equbment shal be bought 10 the consructon st In we worthy conden, functions sropery and dung moitzaten, & mained to prevent damage, and possible, sal utlze excodton procedure senda Motion work tal be on sepa‘ rm the COMPANY. be response on every damage on any properties owned by thd partes ‘ie to motizson and consucion ati uch 8 damage ta pub road, cue chan ee,
You might also like
PNDataRecords Library DOKU V20 en
PDF
No ratings yet
PNDataRecords Library DOKU V20 en
26 pages
Ecp455 - Lab 7 - Spe-1000-13 Tests Part I
PDF
No ratings yet
Ecp455 - Lab 7 - Spe-1000-13 Tests Part I
4 pages
Packages - Rhino BBR Electric Package
PDF
No ratings yet
Packages - Rhino BBR Electric Package
1 page
Smart Load
PDF
No ratings yet
Smart Load
2 pages
fp50 fp100 fp200
PDF
No ratings yet
fp50 fp100 fp200
10 pages
Diris Digiware Ac Multi Circuit Power Metering and Monitoring System Installation and Operating Manual 2023-05-542875 en
PDF
No ratings yet
Diris Digiware Ac Multi Circuit Power Metering and Monitoring System Installation and Operating Manual 2023-05-542875 en
124 pages
Pac 8000
PDF
No ratings yet
Pac 8000
191 pages
Diris-A4041
PDF
No ratings yet
Diris-A4041
7 pages
Guideline Loading Arm Overfill Prevention
PDF
No ratings yet
Guideline Loading Arm Overfill Prevention
23 pages
CSIKS
PDF
No ratings yet
CSIKS
52 pages
Webview M Energy Server Embedded Into Diris Digiware D 70 m70 Isom Digiware D 75 Installation and Operating Manual 2022-01-551295c en
PDF
No ratings yet
Webview M Energy Server Embedded Into Diris Digiware D 70 m70 Isom Digiware D 75 Installation and Operating Manual 2022-01-551295c en
64 pages
RAPP - BQ - Earthwork
PDF
No ratings yet
RAPP - BQ - Earthwork
60 pages
B-1-Activated Carbon Filter Brochure
PDF
No ratings yet
B-1-Activated Carbon Filter Brochure
2 pages
DS Automatic Tank Gauge
PDF
No ratings yet
DS Automatic Tank Gauge
4 pages
Plantpax Process Automation Solution For Oil and Gas
PDF
No ratings yet
Plantpax Process Automation Solution For Oil and Gas
24 pages
NGC 8206 Startup Guide
PDF
No ratings yet
NGC 8206 Startup Guide
24 pages
5.pressure Tank (Hitachi) PDF
PDF
100% (1)
5.pressure Tank (Hitachi) PDF
27 pages
System Architecture For AUX SCADA
PDF
No ratings yet
System Architecture For AUX SCADA
1 page
General Pipe Label Specification
PDF
No ratings yet
General Pipe Label Specification
2 pages
ABB Chromatograph Gas Natural
PDF
100% (1)
ABB Chromatograph Gas Natural
5 pages
FMC - Ethanol Blending Integration
PDF
No ratings yet
FMC - Ethanol Blending Integration
15 pages
RB Steam & Water Analysis System
PDF
100% (1)
RB Steam & Water Analysis System
17 pages
CN - Rev 03 Control Narrative Logic Pump Item PAX60122B - OMH
PDF
No ratings yet
CN - Rev 03 Control Narrative Logic Pump Item PAX60122B - OMH
12 pages
Wire Cable/ Wire Cable/: Notes
PDF
No ratings yet
Wire Cable/ Wire Cable/: Notes
10 pages
Dorization of Natural Gas
PDF
100% (1)
Dorization of Natural Gas
18 pages
4139 15 TDR 0003 0
PDF
No ratings yet
4139 15 TDR 0003 0
16 pages
Standards Index
PDF
100% (1)
Standards Index
32 pages
2030 Automated Truck Loading Systems PDF
PDF
No ratings yet
2030 Automated Truck Loading Systems PDF
8 pages
Pipe Flushing and Inspection
PDF
No ratings yet
Pipe Flushing and Inspection
10 pages
I3547-6379 - 1.0 (Feed Gas Custody Transfer System)
PDF
No ratings yet
I3547-6379 - 1.0 (Feed Gas Custody Transfer System)
19 pages
Nash Compressors en
PDF
No ratings yet
Nash Compressors en
3 pages
General Fire Fighting Network
PDF
No ratings yet
General Fire Fighting Network
1 page
8 Burnell, LP Gas Odorization Testing
PDF
No ratings yet
8 Burnell, LP Gas Odorization Testing
21 pages
0000bf C g0 g000 Qa SPC 0002 b07 Specification For Welding and Inspection
PDF
No ratings yet
0000bf C g0 g000 Qa SPC 0002 b07 Specification For Welding and Inspection
96 pages
Honeywell Data Sheet Gas Detector
PDF
No ratings yet
Honeywell Data Sheet Gas Detector
1 page
2 in LACT Pipeline
PDF
No ratings yet
2 in LACT Pipeline
4 pages
653-Sacrificial Anode Installation For Tanks
PDF
No ratings yet
653-Sacrificial Anode Installation For Tanks
3 pages
Analyzer Sample Systems Ver Happen
PDF
100% (2)
Analyzer Sample Systems Ver Happen
12 pages
Piping Class Planta de Tratamiendo de Agua
PDF
No ratings yet
Piping Class Planta de Tratamiendo de Agua
13 pages
Oily Water Seperator
PDF
No ratings yet
Oily Water Seperator
1 page
Feed-J-154-PP-SP-007 - Spec For Painting - Coating
PDF
No ratings yet
Feed-J-154-PP-SP-007 - Spec For Painting - Coating
40 pages
Project Standard Specification: Plumbing Specialties 15430 - Page 1 of 19
PDF
No ratings yet
Project Standard Specification: Plumbing Specialties 15430 - Page 1 of 19
19 pages
AMIES-A-007 - 2 - Hydrostatic Testing Fluid and Lay-Up Procedures
PDF
No ratings yet
AMIES-A-007 - 2 - Hydrostatic Testing Fluid and Lay-Up Procedures
20 pages
Isometric Fire Figting System
PDF
No ratings yet
Isometric Fire Figting System
2 pages
Product Transfer Loading System PDS - Final
PDF
No ratings yet
Product Transfer Loading System PDS - Final
4 pages
Indra: Instrument Loop Diagram For Unit 00
PDF
100% (1)
Indra: Instrument Loop Diagram For Unit 00
63 pages
Saudi Aramco Inspection Checklist: CP Accessories - Material Receiving SAIC-X-3002 CP
PDF
No ratings yet
Saudi Aramco Inspection Checklist: CP Accessories - Material Receiving SAIC-X-3002 CP
3 pages
Rosemount 4088 Multivariable Transmitter: Product Data Sheet
PDF
No ratings yet
Rosemount 4088 Multivariable Transmitter: Product Data Sheet
44 pages
Keppel Shipyard - Golar LNG - 10233-S1-01 - REV1
PDF
No ratings yet
Keppel Shipyard - Golar LNG - 10233-S1-01 - REV1
64 pages
ST - 13.03 Carbon Steel Piping
PDF
No ratings yet
ST - 13.03 Carbon Steel Piping
19 pages
Fs 4024 HV Metal Clad Switchgear
PDF
No ratings yet
Fs 4024 HV Metal Clad Switchgear
22 pages
Alderley Metering Brochure
PDF
No ratings yet
Alderley Metering Brochure
12 pages
N2 PKG P&ID
PDF
No ratings yet
N2 PKG P&ID
11 pages
BP GS162-1 Valves PDF
PDF
100% (1)
BP GS162-1 Valves PDF
24 pages
Instrucalc Manual
PDF
100% (1)
Instrucalc Manual
18 pages
Allen Bradley PLC-Micro 850
PDF
No ratings yet
Allen Bradley PLC-Micro 850
20 pages
Stee L
PDF
No ratings yet
Stee L
86 pages
T-MCC-CHO-0175-Rev-00 Method of Statement For Interlock Paving Works in HOA NH# 2&3-Comment
PDF
No ratings yet
T-MCC-CHO-0175-Rev-00 Method of Statement For Interlock Paving Works in HOA NH# 2&3-Comment
7 pages
GEN-CIV-SPC-0009 Specification For Excavation, Backfill and Compaction
PDF
No ratings yet
GEN-CIV-SPC-0009 Specification For Excavation, Backfill and Compaction
19 pages
Technological University of The Philippines
PDF
No ratings yet
Technological University of The Philippines
13 pages
PRRP 3 Phase Esa Epro
PDF
100% (1)
PRRP 3 Phase Esa Epro
20 pages
Pertamina: Instrument Location Plan Layout Cover Sheet
PDF
No ratings yet
Pertamina: Instrument Location Plan Layout Cover Sheet
16 pages
Gas Turbine Philosophy Control
PDF
100% (1)
Gas Turbine Philosophy Control
55 pages
Foundation Drawing
PDF
No ratings yet
Foundation Drawing
2 pages
PSV Uwj
PDF
No ratings yet
PSV Uwj
1 page
Daily Document
PDF
No ratings yet
Daily Document
1 page
Junction Box
PDF
100% (1)
Junction Box
11 pages
PRGR 00 Ins Cal 002
PDF
No ratings yet
PRGR 00 Ins Cal 002
10 pages
Vendor List
PDF
No ratings yet
Vendor List
250 pages
Instrument Junction Box - An
PDF
100% (1)
Instrument Junction Box - An
4 pages
Manual Call Point Testing Procedure
PDF
No ratings yet
Manual Call Point Testing Procedure
5 pages
Pertamina-Ep Project - Pemasangan Stasiun Kompresi Gas LP Betung Restriction Orifice Plate - Liquid Flow Tag Number RO-V-1003-1 Input Data
PDF
No ratings yet
Pertamina-Ep Project - Pemasangan Stasiun Kompresi Gas LP Betung Restriction Orifice Plate - Liquid Flow Tag Number RO-V-1003-1 Input Data
1 page
BLA FTP I DS 00 001 Rev.1A
PDF
No ratings yet
BLA FTP I DS 00 001 Rev.1A
14 pages
Flare System
PDF
No ratings yet
Flare System
17 pages
Telecommunication & Scada Specification
PDF
No ratings yet
Telecommunication & Scada Specification
27 pages
HSN-DS-60-003-A4 Rev 1
PDF
100% (1)
HSN-DS-60-003-A4 Rev 1
4 pages
For Gas Metering
PDF
No ratings yet
For Gas Metering
24 pages
Skh3-Ds-60-022-A4 Rev-4 11des2015
PDF
No ratings yet
Skh3-Ds-60-022-A4 Rev-4 11des2015
15 pages
View Telecom Connections in The Floor Plan
PDF
No ratings yet
View Telecom Connections in The Floor Plan
1 page
Fire & Gas Detection Specification
PDF
100% (4)
Fire & Gas Detection Specification
19 pages
Gas Metering Specification
PDF
100% (3)
Gas Metering Specification
50 pages
Instrument: Muara Karang Peaker Gas Meter Project Specification For CCTV
PDF
No ratings yet
Instrument: Muara Karang Peaker Gas Meter Project Specification For CCTV
17 pages
PSV Calculation Report - Gas / Vapor Relief Sizing Case: Const. Var
PDF
No ratings yet
PSV Calculation Report - Gas / Vapor Relief Sizing Case: Const. Var
1 page
PABX Connection System
PDF
No ratings yet
PABX Connection System
1 page
LEVEL GAUGE DATASHEET-Rev.A
PDF
No ratings yet
LEVEL GAUGE DATASHEET-Rev.A
8 pages
Control & Safety System Specification
PDF
No ratings yet
Control & Safety System Specification
38 pages
RFQ For Pressure Transmitter
PDF
100% (1)
RFQ For Pressure Transmitter
21 pages
RFQ For RESTRICTION ORIFICE AND ORIFICE PLATE
PDF
100% (1)
RFQ For RESTRICTION ORIFICE AND ORIFICE PLATE
20 pages
RFQ For Pressure Gauge Dan Diff Gauge
PDF
100% (1)
RFQ For Pressure Gauge Dan Diff Gauge
21 pages
Pressure Gauge Dan Diff Gauge Datasheet - Rev.A
PDF
100% (1)
Pressure Gauge Dan Diff Gauge Datasheet - Rev.A
20 pages