Otis Otis Otis Otis: Elevator Company (India) LTD
Otis Otis Otis Otis: Elevator Company (India) LTD
Otis Otis Otis Otis: Elevator Company (India) LTD
DMG/VVY XYZ
1. PURPOSE:
This procedure has been developed to document the ready recknor of Remote
Stations
2. SCOPE:
This process is applicable to all the Field personnel who so ever want to do the
Addressing of Remote Station Board
3. REFERENCE:
Procedure for LOTO/ZES (HO-SE-1015)
5. DEFINITION:
Nil
6. RESPONSIBILITY:
Regions for implementation as required.
7. TOOLS REQUIRED:
Lead cutter
8. MATERIAL REQUIRED:
Nil
Subject: Page: 2 of 7
9. PPE REQUIRED:
LOTO KIT.
10. PROCEDURE:
RS4
E1 TO E4 = OUTPUT
E5 TO E8 = INPUT
E9 = CLOCK
E10 = DATA
E11 = PI RTN
E12 TO E15 = 30V
E16 TO E20 = RTN
J1.1 = L1
J1.2 = L2
J1.3 = RTN
J1.4 = 30V
RS5
E1 TO E4 = OUTPUT
E5 TO E8 = INPUT
E9 = CLOCK
E10 = DATA
E11 = PI RTN
E12 TO E15 = 30V
E16 TO E20 = RTN
P1.1 = L1
P1.2 = L2
P1.3 = RTN
P1.4 = 30V
RS14
P1 TO P4
PIN 1 = RTN
PIN 2 = INPUT
PIN 3 = 24 VDC
PIN 4 = OUTPUT
P5
PIN 1 = 24/30V
PIN 2 = RTN
PIN 3 = DATA
PIN 4 = PI RTN
PIN 5 = CLK
P6
PIN 1 = L1
PIN 2 = L2
PIN 3 = RTN
PIN 4 = 24/30V
-----------------------@@@@@@@@----------------------