Operating Manual SUNNY BOY 3000TL / 3600TL / 4000TL / 5000TL
Operating Manual SUNNY BOY 3000TL / 3600TL / 4000TL / 5000TL
Operating Manual SUNNY BOY 3000TL / 3600TL / 4000TL / 5000TL
Operating Manual
SUNNY BOY 3000TL / 3600TL / 4000TL / 5000TL
Legal Provisions
The information contained in these documents is property of SMA Solar Technology AG. Any publication, whether in whole or in
part, requires prior written approval by SMA Solar Technology AG. Internal reproduction used solely for the purpose of product
evaluation or other proper use is allowed and does not require prior approval.
SMA Warranty
You can download the current warranty conditions from the Internet at www.SMA-Solar.com.
Trademarks
All trademarks are recognized, even if not explicitly identified as such. A lack of identification does not mean that a product or
symbol is not trademarked.
The Bluetooth word mark and logos are registered trademarks owned by Bluetooth SIG, Inc. and any use of these marks by
SMA Solar Technology AG is under license.
QRCode is a registered trademark of DENSO WAVE INCORPORATED.
Table of Contents
1 Information on this Document .....................................................7
2 Safety .............................................................................................9
2.1 Intended Use............................................................................... 9
2.2 Skills of Qualified Persons.......................................................... 9
2.3 Safety Precautions.....................................................................10
3 Scope of Delivery .......................................................................12
4 Product Description.....................................................................13
4.1 Sunny Boy .................................................................................13
4.2 Interfaces and Functions...........................................................16
5 Mounting .....................................................................................18
5.1 Requirements for Mounting ......................................................18
5.2 Mounting the Inverter ...............................................................22
6 Electrical Connection...................................................................23
6.1 Safety during Electrical Connection.........................................23
6.2 Overview of the Connection Area...........................................24
6.2.1 View from Below.............................................................................24
6.2.2 Interior View ....................................................................................25
6.3 AC Connection..........................................................................26
6.3.1 Requirements for the AC Connection.............................................26
6.3.2 Connecting the Inverter to the Utility Grid.....................................27
6.3.3 Connecting Additional Grounding ................................................29
6.4 DC Connection .........................................................................30
6.4.1 Requirements for the DC Connection.............................................30
6.4.2 Connecting the PV Array................................................................31
8 Configuration ..............................................................................40
8.1 Procedure..................................................................................40
8.2 Changing the Display Language.............................................41
8.3 Changing Operating Parameters.............................................42
8.4 Deactivating Grounding Conductor Monitoring.....................42
8.5 Activating and Setting SMA OptiTrac Global Peak...............43
9 Operation....................................................................................44
9.1 Display Overview .....................................................................44
9.2 Activating and Operating the Display.....................................46
9.3 Calling Up Display Messages of the Start Phase...................46
10 Disconnecting the Inverter from Voltage Sources....................47
11 Recommissioning the Inverter....................................................49
12 Decommissioning the Inverter ...................................................51
Target Group
This document is intended for qualified persons and end users. Some of the tasks described in this
document may only be performed by persons with the appropriate qualifications (see Section 2.2
"Skills of Qualified Persons", page 9). Such tasks are marked with a warning symbol and the caption
"Qualified person". Tasks that do not require any particular qualification are not marked and can also
be performed by end users.
STSatz_Hinw_Weiterführende Informationen
Additional Information
Links to additional information can be found at www.SMA-Solar.com:
Symbols
Symbol Explanation
Indicates a hazardous situation which, if not avoided, will result in
death or serious injury
Indicates a hazardous situation which, if not avoided, can result in
death or serious injury
Indicates a hazardous situation which, if not avoided, can result in
minor or moderate injury
Indicates a situation which, if not avoided, can result in property
damage
Sections describing tasks to be performed by qualified personnel only
Desired result
Nomenclature
2 Safety
2.1 Intended Use
The Sunny Boy is a transformerless PV inverter with two MPPtrackers which converts the direct current
of the PV array to grid-compliant alternating current and feeds it into the utility grid.
The product is suitable for indoor and outdoor use.
STSatz_Best Verwend_Outdoor
The product must only be operated with PV arrays of protection class II, in accordance with
Protection class II in accordance with IEC 61703
IEC 61730, application class A. The PV modules must be suitable for use with this product.
PV modules with a high capacity to ground must only be used if their coupling capacity does not
exceed 1.4 F (for information on how to calculate the coupling capacity, see Technical Information
"Leading Leakage Currents" at www.SMA-Solar.com).
All components must remain within their permitted operating ranges at all times.
Observe the permitted operating range of all components
The product must only be used in countries for which it is approved or released by
Länderzulassung und Freigabe
and directives. Any other application may cause injury to persons or lead to property damage.
For safety reasons, it is forbidden to modify the product or install components that are not explicitly
recommended or distributed by SMA Solar Technology AG for this product. Unauthorized
modifications and installations will void all warranty claims.
Any use of the product other than that described in the Intended Use section does not qualify as
appropriate.
The enclosed documentation is an integral part of this product. Keep the documentation in a
convenient place for future reference and observe the instructions.
The type label must be permanently attached to the product.
the product.
To prevent personal injury or property damage and to ensure long-term operation of the product,
read this section carefully and follow all safety precautions at all times.
Damage to the display or the type label due to the use of cleaning agents
• If the inverter is dirty, clean the enclosure, the cooling fins, the enclosure lid, the type label,
the display, and the LEDs using only water and a cloth.
3 Scope of Delivery
Check the scope of delivery for completeness and any visible damage. Contact your distributor if the
STSatz_Lieferumfang_Inhalt prüfen
4 Product Description
4.1 Sunny Boy
The Sunny Boy is a transformerless PV inverter with two MPPtrackers which converts the direct current
of the PV array to grid-compliant alternating current and feeds it into the utility grid.
Item Explanation
A Type label
The type label uniquely identifies the inverter. The type label is located on the
right-hand side of the enclosure. You will require the information on the type
label to use the product safely and when seeking customer support from the
SMA Service Line. You will find the following information on the type label:
• Device type (Model)
• Serial number (Serial No.)
• Date of manufacture
• Device-specific characteristics
B LEDs
The LEDs indicate the operating state of the inverter.
C Display
The display shows the current operating data and events or errors.
Item Explanation
D Electronic Solar Switch (ESS)*
The ESS and the DC connectors form a DC load-break switch. When plugged
in, the ESS forms a conductive path between the PV array and the inverter.
Removing the ESS interrupts the DC electric circuit and removing all DC
connectors disconnects the PV array completely from the inverter.
E Lower enclosure lid
F Upper enclosure lid
* Optional
Symbol Explanation
Green LED: operating state of the inverter
Green LED is glowing: the inverter is in operation.
Green LED is flashing: the requirements for the connection to the utility grid
have not been met.
Red LED: observe the documentation
Red LED is glowing: an error has occurred that must be rectified. Read the
service manual at www.SMA-Solar.com.
Blue LED: active communication via Bluetooth
Danger
This symbol indicates that the inverter must be additionally grounded if
additional grounding or equipotential bonding is required locally
(see Section 6.3.3, page 29).
QRCode
Links to additional information on the inverter can be found at
www.SMA-Solar.com.
Symbol Explanation
Operating principle of the ESS:
• If the ESS is plugged in, the DC electric circuit is closed.
• To interrupt the DC electric circuit, you must perform the following
steps in the order given:
– Remove the ESS.
– Unlock and remove all DC connectors.
Danger to life due to high voltages
The product operates at high voltages. All work on the product must be
carried out by qualified persons only.
Direct current
Alternating current
WEEE designation
Do not dispose of the product together with the household waste but in
accordance with the locally applicable disposal regulations for electronic
waste.
CE marking
The product complies with the requirements of the applicable EU directives.
Device class ID
The product is equipped with a wireless component and complies with
device class 2.
Degree of protection IP65
The product is protected against dust intrusion and water jets from any
angle.
Symbol Explanation
The product is suitable for outdoor installation.
C-Tick
The product complies with the requirements of the applicable Australian
EMC standards.
Bluetooth
The inverter can communicate via Bluetooth with various Bluetooth devices (information on supported
SMA products at www.SMA-Solar.com).
RS485
The inverter can communicate with SMA communication products via the RS485 interface
(information on supported SMA products at www.SMA-Solar.com). The RS485 interface can be
retrofitted.
Speedwire/ Webconnect
Speedwire is a type of communication based on Ethernet allowing you to connect the inverter to a
Speedwire network. Webconnect allows for data exchange between the inverter and Sunny Portal.
Sunny Portal is an Internet portal which allows you to monitor PV systems and visualize and present
PV system data. The Speedwire/ Webconnect data module can be retrofitted.
Multifunction relay
You can configure the multi-function relay for various operating modes. The multi-function relay is used,
for example, to switch fault indicators on or off (for information on installation and configuration,
see installation manual of the multi-function relay). The multi-function relay can be retrofitted.
5 Mounting
5.1 Requirements for Mounting
Requirements for the mounting location:
WaHiw_Lebensgefahr durch Feuer oder Explosion
Recommended clearances:
Provided that the recommended clearances are observed, adequate heat dissipation will be ensured
as well as sufficient space to remove the ESS if necessary. Sufficient heat dissipation prevents a
reduction in inverter power as a result of high temperatures (details on temperature derating can be
found in the Technical Information "Temperature Derating" at www.SMA-Solar.com).
☐ Observe the recommended clearances to walls as well as to other inverters or objects.
☐ If multiple inverters are mounted in areas with high ambient temperatures, increase the
clearances between the inverters and ensure sufficient fresh-air supply.
Procedure:
1. Ensure that no lines are laid in the wall which could be damaged when drilling holes.
2. Align the wall mounting bracket horizontally on the wall and mark the position of the drill holes.
Use at least two holes on the right-hand and left-hand side and the lower hole in the wall
mounting bracket. Useful hint: When mounting on a post, use the upper and lower central holes
of the wall mounting bracket.
3. Set the wall mounting bracket aside and drill the marked holes.
4. Insert screw anchors into the drill holes if necessary.
5. Secure the wall mounting bracket in a horizontal position using screws and washers.
6. Hook the inverter into the wall mounting bracket.
7. Ensure that the inverter is securely in place.
8. To protect the inverter from theft, attach the padlock:
• Place the shackle of the padlock through the
metal bracket on the wall mounting bracket
and through the bracket on the rear of the
inverter. To do this, guide the shackle outwards
from the center of the inverter.
6 Electrical Connection
6.1 Safety during Electrical Connection
SiHiw_Stromschlag durch hohe Spannung
Item Designation
A Pin connector for the ESS*
B Cable gland M20 x 1.5 for the data cables, network cables or connection
cables of the multi-function relay
C Enclosure opening with filler-plug for the data cables and network cables
D Enclosure opening with filler-plug for the data cables, network cables or
multi-function relay connection cables
E Cable gland M32 x 1.5 for the AC cable
* Optional
Item Designation
A 2 positive and 2 negative DC connectors, input A
B Pin connector for the ESS*
C 2 positive and 2 negative DC connectors, input B
D Pin connector for connecting the multi-function relay or the SMA Power Control Module*
E Pin connector for connecting the communication interface for RS485 or
Speedwire/ Webconnect*
F Connecting terminal plate for connecting the AC cable
G Switch for temporarily changing the display language to English (for service purposes)
H Rotary switch for configuring the NetID
I Rotary switch B for setting the display language
K Rotary switch A for setting the country data set
L Slot SD memory card
M Mounting location for the control module of the fan retrofit kit*
N Grounding terminal for additional grounding of the inverter
* Optional
6.3 AC Connection
6.3.1 Requirements for the AC Connection
Cable requirements:
☐ External diameter: 12 mm to 21 mm
☐ Wire size: max. 10 mm2
☐ Insulation stripping length: 12 mm
☐ The cable must be dimensioned in accordance with the local and national directives for the
dimensioning of cables. The requirements for the minimum wire size derive fromthese directives.
Examples of factors influencing cable dimensioning are: nominal AC current, type of cable,
routing method, cable bundling, ambient temperature and maximum desired line losses
(for calculation of line losses, see design software Sunny Design from software version 2.0
www.SMA-Solar.com).
Damage to the inverter due to the use of screw-type fuses as load-break switches
Screw-type fuses (e.g. DIAZED fuse or NEOZED fuse) are not load-break switches.
• Do not use screw-type fuses as load-break switches.
• Use a load-break switch or circuit breaker as a load disconnection unit (for information and
design examples, see Technical Information "Circuit Breaker" at www.SMA-Solar.com).
☐ In PV systems with multiple inverters, protect each inverter with a separate circuit breaker.
Make sure to observe the maximum permissible fuse protection (see Section 13 "Technical
Data", page 53). This will prevent residual voltage being present at the corresponding cable
after disconnection.
☐ Loads installed between the inverter and the circuit breaker must be fused separately.
Overvoltage category
Overvoltage category
The inverter can be deployed in grids of installation category III or lower, as defined under
IEC 60664-1. This means that the inverter can be permanently connected at the grid-connection point
in a building. In installations involving long outdoor cable routes, additional measures must be taken
so that the overvoltage category is reduced from IV to III (see Technical Information "Overvoltage
Protection" at www.SMA-Solar.com).
Residual-current monitoring unit:
☐ If an external residual-current device is required, install a residual-current device which trips at a
residual current of 100 mA or higher (for details on selecting a residual-current device,
see Technical Information "Criteria for Selecting a Residual-Current Device" at
www.SMA-Solar.com).
In some countries an additional grounding is required. In each case, observe the locally
applicable regulations.
Procedure:
1. Disconnect the circuit breaker and secure against reconnection.
2. If an additional DC load-break switch is available, switch off the DC load-break switch and
secure against re-connection.
3. If the ESS is in use and plugged in, remove the ESS.
4. Unscrew all six screws of the lower enclosure lid using an Allen key (AF 3) and remove the
enclosure lid.
5. Loosen the screw on the display and flip the display up to have more space to make the
connection.
☑ The display clicks into place.
6. Unscrew the swivel nut from the cable gland.
7. If the outer diameter of the cable is between 15 mm and 21 mm, remove the inner sealing ring
from the cable gland.
8. Move the swivel nut of the cable gland over the AC cable and then route the AC cable through
the cable gland into the inverter.
9. Dismantle the AC cable.
10. Shorten L and N by 5 mm each.
11. Strip 18 mm of the L, N and PE insulation each.
12. Push the safety levers of the connecting terminal
plate for the AC cable right up to the stop.
13.
Danger of crushing when safety levers snap shut
The safety levers close by snapping down fast and hard.
• Connect PE, N and Laccording to the labeling
to the connecting terminal plate for the AC
cable and push the safety leversdown with your
thumb only. Do not grip the entire connecting
terminal plate for the AC cable between finger
and thumb and keep fingers out from under the
safety levers.
Procedure:
1. Strip the grounding cable insulation.
2. Loosen the screw using an Allen key (AF4),
until the grounding cable can be led under the
clamping bracket.
3. Feed the grounding cable under the clamping bracket. Position the grounding conductor on the
left-hand side.
4. Tighten the clamping bracket with the screw and conical spring washer (torque: 6 Nm).
The teeth of the conical spring washer must face the clamping bracket.
6.4 DC Connection
6.4.1 Requirements for the DC Connection
Requirements for the PV modules per input:
Funkt.Titel_Anforderungen an die PV-Module pro Eingang
1. Ensure that the circuit breaker is switched off and ensure that it cannot be accidentally
reconnected.
2. If an additional DC load-break switch is available, switch off the DC load-break switch and
secure against re-connection.
3. If the ESS is in use and plugged in, remove the ESS.
4. Ensure that there is no ground fault in the PV array.
5. Check whether the DC connector has the correct polarity.
If the DC connector is equipped with an DC cable having the wrong polarity, the DC connector
must be assembled again. The DC cable must always have the same polarity as the DC
connector.
6. Ensure that the open-circuit voltage of the PV array does not exceed the maximum input voltage.
7. Connect the assembled DC connectors to the inverter.
☑ The DC connectors click audibly into place.
8. Ensure that all DC connectors are securely in place.
9.
Damage to the inverter due to moisture ingress
The inverter is only properly sealed when all the unused DC inputs are closed with
DC connectors and sealing plugs.
• Do not insert the sealing plugs directly into the DC inputs on the inverter.
• For unused DC connectors, push down the
clamping bracket and push the swivel nut up to
the thread.
7 Initial Start-Up
7.1 Procedure
4 8 $ / ,) ,( ' 3( 562 1
Before you commission the inverter, you must check various settings and make changes if necessary.
Einl.Satz_Vorgehensweise
This section describes the procedure for initial start-up and provides an overview of the steps that must
always be performed in the given sequence.
Procedure See
1. Check which country data set the inverter is set to. Supplementary sheet with
the default settings, type
label or display
2. If the country data set is not set correctly for your country or Section 7.2, page 33
your purpose, adjust to the required country data set and
corresponding display language.
3. If the inverter is to communicate with multiple Bluetooth Section 7.3, page 34
devices or if Bluetooth is not to be used as the type of
communication, adjust the NetID.
4. Commission the inverter and start a self-test, if required. Section 7.4, page 36 and
Section 7.5, page 37
If you configure a country data set that is not valid for your country or purpose, it can cause
a disturbance in the PV system and lead to problems with the grid operator. When selecting
the country data set, you must always observe the locally applicable standards and directives
as well as the properties of the PV system (e.g. PV system size, grid-connection point).
• If you are not sure which country data set is valid for your country or purpose,
contact your grid operator and ask which country data set should be configured.
1. Determine the rotary switch position for your country and purpose. Call up the Technical
Information "Overview of Rotary Switch Positions" at www.SMA-Solar.com.
2.
Danger to life due to high voltages
• Ensure that the inverter is open and no voltage is present (see Section 10, page 47).
☑ The inverter will adopt the setting after commissioning. This can take up to five minutes.
Item Explanation
0 Bluetooth communication is deactivated.
1 Communication via Bluetooth with another Bluetooth device
2 to F NetID for communication via Bluetooth with multiple Bluetooth devices
Procedure:
1.
Danger to life due to high voltages
• Ensure that the inverter is disconnected from all voltage sources (see Section 10, page 47).
☑ The inverter will adopt the setting after commissioning. This can take up to five minutes.
Procedure:
1. Mount the lower enclosure lid:
• Place the lower enclosure lid on the enclosure and secure with screw 6.
• Then tighten all six screws with an Allen key
(AF 3) in the order 1 to 6 (torque: 2 Nm).
2. If an ESS is used, the ESS has to be plugged in firmly. The ESS must be aligned parallel to and
flush with the enclosure.
3. Attach the enclosed warning label "Risk of burns from electric arc" so that it is clearly visible on
the disconnection device on the AC side.
4. Switch on the circuit breaker.
5. If an external DC load-break switch is installed, switch it on.
6. If the multi-function relay is used, switch on the load supply voltage, if necessary.
☑ The start-up phase is beginning.
Self-test in accordance with CEI 0-21 during initial start-up (applies to Italy only)
The Italian standard prescribes that an inverter can only operate on the utility grid after the
disconnection times for overvoltage, undervoltage, minimum frequency and maximum
frequency have been checked.
• If the country data set is configured to CEI 0-21 Int / CEI 0-21 internal, start the self-test
as soon as the display shows the country data set (see Section 7.5.1, page 37).
☑ The green LED is glowing and the display alternates automatically between the device type,
firmware version, the serial number or designation of the inverter, the NetID, the configured
country data set and the display language.
✖ The green LED is flashing?
Possible cause of error: the DC input voltage is still too low, or the inverter is monitoring the utility
grid.
• Once the DC input voltage is sufficiently high and the grid connection conditions are met,
the inverter will start operation.
✖ The red LED is glowing and an error message and event number appear in the display?
An error has occurred.
• Rectify the error (for troubleshooting see service manual at www.SMA-Solar.com).
The self-test is only required for inverters, which are commissioned in Italy. The Italian standard requires
that all inverters feeding into the utility grid are equipped with a self-test function in accordance with
CEI 0-21. During the self-test, the inverter will consecutively check the reaction times for overvoltage,
undervoltage, maximum frequency and minimum frequency.
The self-test changes the upper and lower trip-limit values for each protective function on a linear basis
for frequency monitoring and voltage monitoring. As soon as the measured value exceeds the
permitted trip-limit value, the inverter disconnects from the utility grid. In this way, the inverter
determines the reaction time and checks itself.
After the self-test has been completed, the inverter automatically switches back to the feed-in
operation, resets the original shutdown conditions and connects to the utility grid. The test takes
approx. three minutes.
Requirements:
☐ Configured country data set: CEI 0-21 Int or CEI 0-21 internal or amended country data set
trimmed or special setting based on one of the country data sets mentioned above.
☐ A report for entering the test results according to CEI 0-21 must be available.
☐ The inverter must be in operation and in the start phase.
Procedure:
1. As soon as the configured country data set appears in the display, tap once on the display
within ten seconds.
☑ A message informing you that the self-test has started is shown in the display:
Avvio Autotest.
✖ The message Avvio Autotest is not shown in the display?
Ten seconds have passed and the self-test has not started.
• Restart the self-test (see Section 7.5.2, page 39).
2. Tap on the display within 20 seconds and enter the test results that follow into the test report.
☑ The self-test starts.
☑ The inverter displays the results of the individual tests for overvoltage, undervoltage, maximum
frequency and minimum frequency. The results are displayed three times in succession for ten
seconds each.
✖ The information Autotest interroto is shown in the display?
The self-test was cancelled due to an unexpected disconnection condition or the DC voltage was
too low so that the grid feed-in could not continue.
• Restart the self-test (see Section 7.5.2, page 39).
8 Configuration
8.1 Procedure
4 8 $ / ,) ,( ' 3( 562 1
Once you have commissioned the inverter, you may have to adjust various settings via the rotary
switches in the inverter or via a communication product. This section describes the procedure for
configuration and gives an overview of the steps you must perform in the prescribed order.
Procedure See
1. If the display language is not set correctly, adjust the Section 8.2, page 41
settings.
2. If the inverter is equipped with a Speedwire/ Communication interface manual
Webconnect data module, integrate the inverter in a at www.SMA-Solar.com
Speedwire network and register it in Sunny Portal, if
necessary.
3. Capture the inverter in a communication product in Manual of the communication
order to manage the PV systemdata or to set the inverter product at www.SMA-Solar.com
parameters.
4. Change the PV system time and PV system password. Manual of the communication
product at www.SMA-Solar.com
5. If the inverter was installed in a network such as an Section 8.4, page 42
IT network, deactivate the grounding conductor
monitoring.
6. Activate and set SMA OptiTrac Global Peak for partially Section 8.5, page 43
shaded PV modules.
1.
Danger to life due to high voltages
• Disconnect the inverter from all voltage sources and open the enclosure lid
(see Section 10, page 47).
2. Determine the rotary switch setting for the desired display language. Call up the Technical
Information "Overview of Rotary Switch Positions" at www.SMA-Solar.com.
3. Set rotary switch A to 0 using a flat-blade
screwdriver (blade width: 2.5 mm). This ensures
that the country data set remains unchanged.
4. Set the rotary switch B to the required language using a flat-blade screwdriver
(blade width: 2.5 mm).
5. Recommission the inverter (see Section 11, page 49).
☑ The inverter adopts the settings after commissioning. This can take up to five minutes.
Procedure:
1. Access the user interface of the communication product or software and log in as a user or as
an installer.
2. If necessary, enter the SMA Grid Guard code.
3. Select and set the required parameter.
4. Save the setting.
9 Operation
9.1 Display Overview
The display shows the current operating data of the inverter (e.g. current power, daily energy,
Aufgabe_Display
total energy) as well as events or errors. Power and energy are displayed as bars in the diagram.
There is a slot for an SD card on the left edge of the display enclosure. You can use the SD card to
carry out an inverter firmware update, for example (for information on firmware updates with an
SD card see the technical description "Firmware Update with SD Card" at www.SMA-Solar.com).
Procedure:
1. Disconnect the circuit breaker and secure against reconnection.
2. If an additional DC load-break switch is available, switch off the DC load-break switch and
secure against re-connection.
3. If the ESS is plugged in, remove the ESS.
4. If the multi-function relay is used, switch off the load supply voltage, if necessary.
5. Wait until the LEDs, display and if necessary, the load connected to the multi-function relay,
are switched off.
6. Use a current clamp to ensure that no current is present in the DC cables.
7. Remove all six screws of the lower enclosure lid using an Allen key (AF 3) and remove the
enclosure lid.
13.
Damage to the inverter due to electrostatic discharge
The internal components of the inverter can be irreparably damaged by electrostatic discharge.
• Ground yourself before touching any components.
Procedure:
1. Connect the DC connectors to the inverter.
☑ The DC connectors click audibly into place.
2. Seal all unused DC inputs using the DC
connectors with sealing plugs.
5. If an ESS is used, make sure that it is not worn out (see service manual at www.SMA-Solar.com).
6. If an ESS is used, the ESS has to be plugged in firmly. The ESS must be aligned parallel to and
flush with the enclosure.
1.
Danger to life due to high voltages
• Disconnect the inverter from all voltage sources (see Section 10, page 47).
6. If an ESS is used, the ESS has to be plugged in firmly. The ESS must be aligned parallel to and
flush with the enclosure.
7.
Risk of burns due to hot enclosure parts
• Wait 30 minutes for the enclosure to cool down.
9. If the inverter is to be stored or shipped in packaging, pack the inverter and , if applicable,
the ESS. Use the original packaging or packaging that is suitable for the weight and dimensions
of the inverter.
10. Dispose of the inverter in accordance with the locally applicable disposal regulations for
electronic waste.
13 Technical Data
13.1 DC/ AC
13.1.1 Sunny Boy 3000TL / 3600TL
DC Input
SB 3000TL-21 SB 3600TL-21
Maximum DC power at cos = 1 3,200 W 3,880 W
Maximum input voltage 750 V 750 V
MPPvoltage range 175 V to 500 V 175 V to 500 V
Rated input voltage 400 V 400 V
Minimum input voltage 125 V 125 V
Initial input voltage 150 V 150 V
Maximum input current 30 A 30 A
Maximum input current per string* 15 A 15 A
Number of independent MPPinputs 2 2
Strings per MPPinput 2 2
* Maximum permitted current allowed through one DC connector.
AC Output
SB 3000TL-21 SB 3600TL-21
Rated power at 230 V, 50 Hz 3,000 W 3,680 W
Maximum apparent AC power 3,000 VA 3,680 VA
Rated grid voltage 230 V 230 V
Nominal AC voltage 220 V / 230 V / 220 V / 230 V /
240 V 240 V
AC voltage range* 180 V to 280 V 180 V to 280 V
Nominal AC current at 220 V 13.6 A 16.0 A
Nominal AC current at 230 V 13.0 A 16.0 A
Nominal AC current at 240 V 12.5 A 15.3 A
Maximum output current 16 A 16 A
SB 3000TL-21 SB 3600TL-21
Total harmonic distortion of the output current ≤ 4% ≤ 4%
with total harmonic distortion of the AC voltage
< 2%, and AC power > 50% of the rated power
Rated power frequency 50 Hz 50 Hz
AC power frequency* 50 Hz / 60 Hz 50 Hz / 60 Hz
Operating range at AC power frequency 50 Hz 45 Hz to 55 Hz 45 Hz to 55 Hz
Operating range at AC power frequency 60 Hz 55 Hz to 65 Hz 55 Hz to 65 Hz
Power factor at rated power 1 1
Displacement power factor cos , adjustable 0.8 underexcited to 1 0.8 underexcited to 1
to 0.8 overexcited to 0.8 overexcited
Feed-in phases 1 1
Connection phases 1 1
Overvoltage category in accordance with ||| |||
IEC 60664-1
* Depending on the configured country data set
Efficiency
SB 3000TL-21 SB 3600TL-21
Maximum efficiency, max 97.0% 97.0%
European efficiency, EU 96.0% 96.4%
SB 4000TL-21 SB 5000TL-21
Maximum DC power at cos = 1 4,200 W 5,200 W
Maximum input voltage 450 V 550 V
MPPvoltage range 175 V to 500 V 175 V to 500 V
Rated input voltage 400 V 400 V
Minimum input voltage 125 V 125 V
Initial input voltage 150 V 150 V
Maximum input current 30 A 30 A
* 15 A 15 A
Maximum input current per string
Number of independent MPPinputs 2 2
Strings per MPPinput 2 2
* Maximum permitted current allowed through one DC connector.
AC Output
SB 4000TL-21 SB 5000TL-21
Rated power at 230 V, 50 Hz 4,000 W 4,600 W
Maximum apparent AC power 4,000 VA 5,000 VA
Rated grid voltage 230 V 230 V
Nominal AC voltage 220 V / 230 V / 220 V / 230 V /
240 V 240 V
AC voltage range* 180 V to 280 V 180 V to 280 V
Nominal AC current at 220 V 18.2 A 20.9 A
Nominal AC current at 230 V 17.4 A 20.0 A
Nominal AC current at 240 V 16.7 A 19.2 A
Maximum output current 22 A 22 A
Total harmonic distortion of the output current ≤ 4% ≤ 4%
with total harmonic distortion of the AC voltage
< 2%, and AC power > 50% of the rated power
Rated power frequency 50 Hz 50 Hz
SB 4000TL-21 SB 5000TL-21
AC power frequency* 50 Hz / 60 Hz 50 Hz / 60 Hz
Operating range at AC power frequency 50 Hz 45 Hz to 55 Hz 45 Hz to 55 Hz
Operating range at AC power frequency 60 Hz 55 Hz to 65 Hz 55 Hz to 65 Hz
Power factor at rated power 1 1
Displacement power factor cos , adjustable 0.8 underexcited to 1 0.8 underexcited to 1
to 0.8 overexcited to 0.8 overexcited
Feed-in phases 1 1
Connection phases 1 1
Overvoltage category in accordance with ||| |||
IEC 60664-1
* Depending on the configured country data set
Efficiency
SB 4000TL-21 SB 5000TL-21
Maximum efficiency, max 97.0% 97.0%
European efficiency, EU 96.4% 96.5%
13.5 Equipment
DC connection SUNCLIX DC connector
AC connection Spring-cage terminal
Display LC graphic display
Bluetooth As standard
RS485, galvanically isolated Optional
Speedwire/ Webconnect data module Optional
Multifunction relay Optional
SMA Power Control Module Optional
13.6 Torques
Upper lid screws 6 Nm 0.3 Nm
Screws lower lid 2 Nm 0.3 Nm
Additional grounding terminal 6 Nm
SUNCLIX swivel nut 2 Nm
RS485 communication connection 1.5 Nm
Multi-function relay connection 1.5 Nm
14 Accessories
You will find relevant accessories and spare parts for your product in the following overview.
If required, these can be ordered from SMA Solar Technology AG or your distributor.
15 Contact
If you have technical problems concerning our products, contact the SMA Service Line.
STSatz_Kontakt_Benötigte Daten
We need the following information in order to provide you with the necessary assistance:
• Inverter device type
• inverter serial number
• Inverter firmware version
• Special country-specific settings of the inverter (if applicable)
• Type and number of PV modules connected
• Mounting location and mounting altitude of the inverter
• Three-digit or four-digit event number and display message of the inverter
• Optional equipment, e.g. communication products
• Type of use of the multi-function relay (if present)
STSatz_Kontakt_Adressen
Australia SMA Australia Pty Ltd. Toll free for Australia: 1800 SMA AUS
Sydney (1800 762 287)
International: +61 2 9491 4200
Belgien/ SMA Benelux BVBA/ SPRL +32 15 286 730
Belgique/ Mecheln
Belgi
Brasil Vide Espa a (Espanha)
esko SMA Central & Eastern Europe s.r.o. +420 235 010 417
Praha
Chile Ver Espa a
Danmark Se Deutschland (Tyskland)
Deutschland SMA Solar Technology AG Medium Power Solutions
Niestetal Wechselrichter: +49 561 9522-1499
Kommunikation: +49 561 9522-2499
SMS mit „R ckruf“: +49 176 888 222 44
Hybrid Energy Solutions
Sunny Island: +49 561 9522-399
Power Plant Solutions
Sunny Central: +49 561 9522-299
Espa a SMA Ib rica Tecnolog a Solar, Llamada gratuita en Espa a:
S.L.U. 900 14 22 22
Barcelona Internacional: +34 902 14 24 24
Other countries International SMA Service Line Toll free worldwide: 00800 SMA SERVICE
Niestetal (+800 762 7378423)
( &' HFO
DUDW
LRQRI &RQIRUP LW
\
ZLW
KWKH* XLGHO
LQHVRI W
KH( XURSHDQ
(OHFW
URP DJ QHWLF FRP SDWLELOLW
\ (& (0 &
/RZ YRO
WDJ HGLUHFW LYH ( & /9'
5DGLRDQG W HOHFRP P XQLFDW LRQVW
HUP LQDOHTXLSP HQW ( & 5 77(
2 QO
\ ZKHQHTXLSSHG ZLW K 6W
DQGDUGDSSOLFDEO H
60 $ #M
VFUPPUI 3LJ J \ %DFN 6W
DQGDUGQRWDSSO LFDEO
H
1 LHVW
HW
DO
60 $ 6RODU7HFKQRORJ \ $ *
6%60 & 673 =( &( HQ
,QIRUP DW LRQ
: LWKRXWDQH[ SO LFLWZULW
W
HQFRQ UP DWLRQE\ 60 $ W KLVGHFO
DUDWLRQRI FRQIRUP LW
\ LVQRO
RQJ HU
YDOLG LI
WKHSURGXFWLVP RGL HG VXSSOHP HQW HG RUFKDQJ HG LQDQ\ RWKHUZD\
FRP SRQHQW VZKLFKDUHQRWSDUWRI W KH60 $ DFFHVVRULHVNLWDUHLQW HJ UDW
HG LQWKHSURGXFWDV SSD )UDQN* UHL] HU
ZHO ODVLI W
KHSURGXFWLVXVHG RULQVWDOO
HG LP SURSHUO\ 9LFH3UHVLGHQW0 373'
' HFODUDW
LRQRI &RQIRUP LW
\
Z LW
K* HUP DQ ( XURSHDQDQG ,QW
HUQDW
LRQDO 1 RQ ( XURSHDQ VW
DQGDUGVXVHGIRU
68 1 1 < %2 < 68 1 1 < 0 ,1 , &( 1 75 $ / DQG 68 1 1 < 75,32 : ( 5 LQYHUW
HUV
* HUP DQ6W DQGDUG ( XURSHDQ6WDQGDUG ,QW
HUQDW LRQDO6W DQGDUG
' ,1 ( 1 (1 ,( & ,( & &,635
' ,1 ( 1 EDVHG RQ (1 EDVHG RQ ,( &
' ,1 ( 1 EDVHG RQ (1 EDVHG RQ ,( &
' ,1 ( 1 EDVHG RQ (1 EDVHG RQ ,( &
' ,1 ( 1 EDVHG RQ (1 EDVHG RQ ,( &
' ,1 ( 1 (1 9 ,( &
' ,1 ( 1 (1 9 ,( &
' ,1 ( 1 (1 9 ,( &
60 $ 6RODU7HFKQRORJ \
Z Z Z 60 $ 6RODUFRP