SECTOR-43, CHANDIGARH

CASE STUDY

SUBMITTED TO :- SUBMITTED BY :-
Ar. Jaswinder Kaur Amit Sharma(18011)
Ar. Sonia Mittal Ananya Pal(18013)
Ar. Rupinder Kaur Anu(18016)
Harminder Singh(18026)
Hrithik Prasar(18028)
Neeraj Sha(18036)
ISBT 43 CHANDIGARH
INTRODUCTION
•Sector 43 ISBT was recently developed on
a 21 – acre site in south – east Chandigarh
, between junction 58 and 59 on Vikas
Marg .

•The site is adjacent to District court


complex near judicial academy , opposite
kajheri village .

•The terminal provides interstate bus


connections for Punjab, Haryana ,
Uttarakhand , Himachal Pradesh and
Jammu – Kashmir and intra city as well as
sub – urban connections .

•Chandigarh Airport – 17.4 km

•Chandigarh Railway Station – 10.5 km

•The terminal serves over 80000


passenger trips per day with an average
occupancy of 45 per bus .
SITE STUDY
ARCHITECT Balvinder Saini

STARTED 2008
COMPLETED 2012
LOCATION Sector 43 , Chandigarh
USES- The buses for
Punjab, Himachal
and J&K side are plying from ISBT-
43.

SITE AREA 21 Acres


UNLOADING PLATFORMS 12
LOADING PLATFORMS 28

PEAK HOUR FOOTFALL 8000


BUILDING FORM
• Use of both straight and curve
lines.
• The centre of the form is convexing
toward the major arterial road (Jan
Marg).
• While both end of the building is
placed cparallel to the arterial road.
• The rear side of the form is of
triangular shape.
• There are two wings created at the
centre of the form and mirrored.
• This is used to create balance and
symmetry to the all over form of
the terminal.
CIRCULATION
• Site can be approached by two
major highways NH 21 to
Rupnagar and NH 22 to
Shimla.

• Vehicular circulation in the


terminal . For ISBT buses ,entry
and exit to terminal is from
vikas marg.

• Vehicular parking can be


accessed from the arterial road
along the terminal site’s
periphery .

• It comprises parking for :


25 auto – rickshaws
130 cars parking .
200-350 two – wheeler
EXISTING TERMINAL COMPONENTS
The existing terminal
premises comprise
five sections -
1. TERMINAL BUILDING
2. PARKING
3. AREA FOR BUSES
4. CITY BUS TERMINAL
5. DEPOT
FACADE OF THE TERMINAL

WEST WING
EAST WING
ZONING

➢ HORIZONTAL ZONING :- ➢ VERTICAL ZONING :-


• Commuters facilities
• Enquiry
• Post office
• Clock room • Dormitories for commuters
and drivers
• Fast food • Restaurants
• Office
• Waiting areas

• Office

• Toilets

• Drinking Water

• Parking for bus , car , scooter


and taxi .

• Workshops
FLOOR PLANS
• The terminal building comprises
four floors with built – up area of
over 8,500 sq. m
• The ground floor houses 11
reservation counter , 28 loading
bays , shops , tourism offices ,
cloak room , and basic amenities
like toilets and drinking water
• The first floor houses a
commuter lodge , consisting of
five rest rooms with attached
toilets and a dormitory with
dinning hall and kitchen .
• The second and third floors are
designated for commercial
activity , including pantry and
toilets
PLATFORM INFORMATION
ROOFING TUBULAR TRUSS
ROAD WIDTH FOR PASSENGER 8M
ROAD WIDTH FOR ISBT 10M AT THE ENTRANCE ( AT CENTER 36 M )

PLATFORM WIDTH FOR ICBT 11M


PLATFORM WIDTH FOR ISBT 5M

TRIANGULAR NICHES (BUS PARKS) 3.8M BY 3.8M, RIGHT ANGLED AND INCLINED
TO PLATFORM AT 45 DEGREE PROVIDED WITH
CONCRETE STOPPERS AT THE ROADS .

PLATFORM PLINTH AT A HEIGHT OF ABOVE 0.0381 M

COLOUR SCHEME EXPOSED BRICKS ARE USED .


PARKING
PARKING PARKING TOTAL
TYPESNUMBER
AND NUMBERS TYPES

IDLE PARKING 66 45 DEGREE ANGLE

LOADING PLATFORM 28 45 DEGREE ANGLE

UNLOADING PLATFORM 12 PARALLEL

ICBT 20 PARALLEL

CONCRETE STOPPER
ANALYSIS :-

TICKET COUNTER

SOLAR PANELS AT ROOF-TOP

• Maximum daylight used in loading area.


• Sign boards are provided.
• No sitting spaces in open and entry side of the site.
• Radial planning is used for maximum daylight and loading
areas .
• Solar panels are installed at the roof to produce electricity.
ENTRY TO THE TERMINAL
FIRE EXTINGUISHER

PARKING VISIBLE FROM STAIRS

• Dome is used for capturing natural light in the


building.
• Direct vision of stairs was from parking area.
• CCTV cameras were installed .
• Fire Extinguishers were installed .
DOME USED FOR NATURAL LIGHT
VIEW FROM LOADING BAY

MURAL
• View point was clear from waiting area
and restaurants .
• Direct stairs are not connected from
loading platform.
• Mural were made at the entrance of
the terminal .
PUBLIC AMENITIES SPACE KIOSK IS PROVIDED IN OPEN • Kiosk were provided in the open area
AREA FOR SITTING for sitting .
TUBULAR TRUSS

DRINKING WATER FACILITY

• Tubular truss were used in roofing .


• Centrally located waiting area is provided .
• Drinking water facility is given .

OPEN WAITING AREA


LIFTS WERE PROVIDED ENTRY FROM PLATFORM WAY TO BASEMENT PARKING
TOWARDS BASEMENT PARKING

• Entry from platform is also provided for basement


parking.
• Lifts were also provided .
• Enquiry counter at the entry of the terminal
RAMPS AC WAITING AREA ENQUIRY COUNTER

• Ramps facilities were provided for disable persons .


• Sitting areas are provided like a platform for every
few platforms , so that people get every facilities
nearby .
• Enquiry counter at the entry of the terminal
T