Saudi Aramco Inspection Checklist: Pipeline Right of Way (ROW) Inspection SAIC-L-1001 30-Oct-17 Civil
Saudi Aramco Inspection Checklist: Pipeline Right of Way (ROW) Inspection SAIC-L-1001 30-Oct-17 Civil
Saudi Aramco Inspection Checklist: Pipeline Right of Way (ROW) Inspection SAIC-L-1001 30-Oct-17 Civil
00 30-Jun-17
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
The Construction Contractor shall field verify the original vertical profile of
the pipeline, the amount of cover, the location and degree of elastic and
SAES-L-450
A2 preformed bends, in accordance with the IFC drawings. The change in
Sec. 7.1.2
slope of the pipeline at normal spacing of 30 m., and at intermediate
stations as required, shall be calculated.
Fills and cuts shall be made to reduce the number and/or magnitude of
SAES-L-450
A3 overbends and sagbends in the pipeline. Fills should be avoided in areas
Sec. 7.1.3
where the natural drainage of the surrounding area is affected.
Provisions shall be made to prevent wash-out of the pipeline cover by rain SAES-L-450
A4
storms if the pipeline construction changes the natural drainage pattern. Sec. 7.1.4
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-L-450 -- Construction of On-Land and Near Shore Pipelines,12 October 2015
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date: