Project Charter - School of Archery

PPM

Uploaded by

Tayyab Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

PROJECT

CHARTER
Contactless Parcel Delivery and
Sanitization System
PROJECT CHARTER

Project Name: Project Number:


Contactless Parcel Delivery SP-22-041
and Sanitization System
Date: Revision Number:
9th March, 2022 (Wednesday) Not Applicable

1. PROJECT GOALS

Our Aim is to build a system which can make sure the a coctactless parcel delivery
system. A camera will be attached with the ring bell. Camera will take the snap as
delivery boy will ring the bell and send the snap to the user. After recoginization,
user will open the dorr of box. Delivery boy will place the parcel inside the box.
Sensors will detect the parcel and sanitization starts. This whole process will ensure
contectless delivery system.

2. DELIVERABLES

1. Sensors
2. Developed application
3. Design of communication system
4. Design a sanitiztion system

3. SCOPE DEFINITION

The Project includes:

1. Callibration of sensors (detection of object)


2. Development of application (communication between user and delivery boy)
3. Design of communication system(authorization of delivery boy)
4. Designing a sanitiztion system (virius free)

The Project will NOT include:

1. Any biometric verification of customer


2. App will not have any login dashboard
4. PROJECT MILESTONES

1. Hardware Design
2. Software Design
3. Implementation

5. ASSUMPTIONS, CONSTRAINTS & DEPENDENCIES

The following are the potential constraints and dependencies for this project:
1. Equipments availability
2. Prices of equipments
3. Custom tariffs on imported equipments

6. RELATED DOCUMENTS

NOT APPLICABLE

7. PROJECT ORGANIZATIONAL STRUCTURE

Function Name Role


Function Name Role
Responsible for software designing Sami ullah Project Manager
and implementation

Responsible for hardware designing Tayyab Ahmed Khan Project Manager


and implementation

Responsible for directing the project in Dr. Laeeq Riaz Project Supervisor
right direction and making suggestions
to conduct different activities in
improved manner.

Function Name Role

8. PROJECT AUTHORIZATION

(Approved / Not Approved)


Dr. Laeeq Riaz
Project Supervisor