Oil India Limited 13-Feb-2022 Well Wise Daily Report For Workover Wells

1. The document provides a daily report on workover well operations from multiple rig sites. It details the specific operations carried out on each well on the given date such as running or pulling tubing, cementing, logging, and addressing issues. 2. Operations included milling, perforating, setting packers, fluid unloading, sampling, and preparing wells for further interventions. 3. Issues encountered were equipment problems, local disputes delaying work, and stuck tubing that required multiple attempts to pull free.

Uploaded by

rishiraj goswami
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
123 views1 page

Oil India Limited 13-Feb-2022 Well Wise Daily Report For Workover Wells

1. The document provides a daily report on workover well operations from multiple rig sites. It details the specific operations carried out on each well on the given date such as running or pulling tubing, cementing, logging, and addressing issues. 2. Operations included milling, perforating, setting packers, fluid unloading, sampling, and preparing wells for further interventions. 3. Issues encountered were equipment problems, local disputes delaying work, and stuck tubing that required multiple attempts to pull free.

Uploaded by

rishiraj goswami
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

OIL INDIA LIMITED 13-Feb-2022

Well Wise Daily Report for Workover Wells


Outfit R/up Date
Operations Carried out
Well Current Shift
Resumed r/in 4 5/8" rotovert from 1940 m down to 3016 m in sgls. Cementing crew attended power tong hydraulic leakage problem in between.
RG-A 11-12-2021
Next Well : NHK084(5)-R/NHK025(10)-R/DRI003-R/NHK069(10000)-R/NHK650
NHK532 (CA) 90
General r/dn job in progress. ILM stopped by local people due to non fulfillment of their demand against OIL from 3:00pm. Bandh withdrawn at
RG-B 04-12-2021
6:00 pm.
NHK480 (CA) 90
Next Well : NHK526-R(10)/NHK128(5)-R/NHK037-R/NHK438(IAF)-R/NHK495-R/NHK148(5)
Resumed RIH 2-7/8" VAM tbg with 3-1/2" Mud motor + Drill collar + 4-1/2" FB mill from 1343 m to BP top @ 2458.56 m. Established circulation
RG-C 20-12-2021 and started BP mill and pushed down from 2458.56 m to 2458.69 m. Pumped Hi-vis pill and circulated to clean the hole. POOH but found string got
JRN019 (CA) 80 stuck at 2446 m. Release the string maximum pull of 1,00,000 lbs. Resumed POOH 02 sgls without any extra pull.
Next Well : NHK443-R/KMT005 (WI) -R(A/F) / HJN007(GP)(5)-R/NHK559(5)/NHK007(5)/NHK304
RG-D 08-12-2021 WOC for 48 hrs from 3:30 pm of 11.02.2022
NHK303 (WA) 162 Next Well : NHK591-R/NHK592(30,000)/NHK385(ABD)/NHK444(ABD)(S/Const)/NHK352
RG-E 25-01-2022 RIH HW pkr with GLVs from 739 m upto 2164 m . Measured & drifted all tubular prior RIH
MKM069 (EA) 26 Next Well : KLN013(10)-APB-R/DKM034(IAF)-R/NHK007(5000)/ BHJ003/ BHJ002/SLM014(WDC)
Opened the well. R/in FB mill from 3626 m to 3638.45m and tagged bottom with circulation. Started milling and milled down to 3638.50 m. Found
no progress. Pumped hi-vis pill and circulated out the same. POOH FB mill upto 2976 m. During P/out observed abnormal sound from brake shoe.
BHEL-A 22-07-2021 Rectification in progress.
MDK003(WI) (CA) 300 (Operations could not be carried out from 18:00 hrs due to noise pollution issue.)
Next Well : NHK576 -R/NHK107(5)-
R/NHK191(ABD)/NHK621(ABD)/JRN020(ABD)/NHK360(ABD)/NHK440(ABD)NHK441(ABD)/JRN032(ABD)/MRN090(ABD)
BHEL-C 28-01-2022 RIH rotovert from 467 m upto 3200 m. Circulated well thoroughly.
SLM028 (WA) 14 Next well:NHK 320(ABD)-R/NHK239(ABD)-R/ NHK131(Statics)/DRI001(ABD)/JRN005(ABD)/JRN027(ABD)
M-1 12-02-2022 Transferred 6 loads from STL#8. ILM completed. Rig statics placement is in progress
WDW136 () Next Well :NHK250-R/NHK150(ABD)-R/NHK143(ABD)/NHK011
WLD reported wellsite and rigged up logging gears. RIH 2⅛" dummy/GR/CCL tool down to 2720m. Then RIH 2⅛" TTP/CCL and perforated in the
range of (2672-2666)m & (2666-2660)m in two runs. Observed no immediate pressure build up after perforations. Rigged down the logging gears
DM-1 23-11-2021
and opened the well to production tank. Found no activity or displacement in the production tank. Shut the well in SITP= Nil and SICP = 700
NHK496 (CA) 76
psi(Nitrogen)
Next Well : NHK166(ABD)-R/NHK196 R/NHK296(15000)/NHK235(5)/NHK087(ABD)
Received 25 bbls of hi-vis pill at tank. Placed cementing pump after clearing the electrical overhead lines. Cement mixing tank and cementing
DM-2 11-01-2022
pump lined up.
NHK167 (CA) 19
Next Well: NHK115(ABD)-R/NHK302(20)(ench)/NHK447(ABD)-R/NHK378(5)/NHK412(5)
General rig up is in progress. Electrical repaired genset. R/Building rigup ladders, tool slide, railings on the the sub-structure. Placed outfit on the
DM-3 00-01-1900
ramp.
WDW167 ()
Next Well : Deroi 4-R(ABD)/NHK448(ABD)/NHK459(ABD)/WBT001(ABD)
DM-4 27-01-2022 POOH rotovert from 3030 m to surface.
NHK246 (WA) 10 Next Well: NHK114(5)-R/NHK247(ABD)-R/NHK079(5)/NHK104(ABD)
RIH TCR bit with mud motor from 3130 m upto 3626 m. Started cement cleaning from 3626 m upto 3645 m. Circulated well. WLD made 1-11/16”
CH-1 21-01-2022 GR- CCL Dummy trip and tagged pup joint top at 3619.5 m, indicating cement cleaning depth to be 3651.47 m . Positive tested well at 1000 psi &
NDA007 (CA) 40 found ok. P/out TCR bit from 3651.47 m upto 2215 m. Cumm. C. C= 25.47m.
Next well: TRN001-R (GW)/JRN039(10)/NHK389(5)
WLD reported for Logging job. R/up logging tools. RIH 2 1/8" Dummy/CCL tool up to 3045 m.The RIH 2 1/8" TTP/CCL gun & perforated in the range
of (3021---3025) m. After perforation observed tbg pressure gradually increased to 1400 psi. R/dn logging tools. Opened the well through 5mm FA
CH-2 18-01-2022
bean to production tank and self unloaded 25 bbls fluid. Cumm unloading 115 bbls(including initial fluid level lowering of 1500 m). Shut in the well
NHK572 (CA) 46
with SITP= 2600psi & SICP= 500psi(N2 pressure).Morning SITP=3000psi and SICP=600psi
Next well: HJN054(10)-R/BMR 008-R/ BGP006-R/NHK288(ench)/NHK032
Contd R/in of OE 27/8'' EUE cementing tbg in sgls from 1834.95 m and R/in upto 4060 m. Checked tubing integrity and found ok. P/back and
CH-3 27-01-2022 adjusted tbg shoe at 3997 m. Recorded injectivity in stages and found NIL @500, 1000 psi & 1500 psi. Well ready for cement squeeze job.
BRK006 (EA) 24 Next Well : BRK013(ABD)-R/ BRK011-R (pkr fish)/NHK253-R (WI)

Opened the well and unloaded 28 bbls of well fluid through ESP. Cumm unloaded 83 bbls. Shut the well. SICP=SITP=nil. Morning SITP: 150 psi,
CH-4 19-01-2022 SICP: 500 psi. Sample analysis as on 11.02.2022 at 5:00 PM showed- Water: 100% (pH: 8.5; Sal: 500 ppm; CO3: 240 ppm; HCO3: 2440 ppm); at
BRK027 (EA) 46 5:00 PM showed- Water: 100% (pH: 8.5; Sal: 400 ppm; CO3: 600 ppm; HCO3: 1342 ppm).
Next Well: BRK030-R/ SCM003-R(isoln)/ WDW150/DKM022(IAF)-R
Landed Cone and adjusted H/W PKR at 3900 m. Set H/W PKR at 3900 m by slacking 12,000 lbs weight on PKR. Tested PKR @ 500 psi and found OK.
CH-5 28-01-2022 R/dn BOP and Installed X mass tree. Carried out initial fluid level lowering by 400 m with N2 shots. Released the N2 pressure to zero. To perforate
BGN006 (EA) 26 the well today with 2 1/8" TTP gun.
Next Well: HJN014-R(WI)/NHK563/BMR006-R
SITP & SICP= Nil. "B" Annulas pr 100 psi. Released B annulus pr to 50 psi (till displacement of liquid). Topped- up tbg by pumping 19 bbls & csg by 9
bbls of 63 pcf NaCl soln. Observed the well for 1.5 hrs, found ok. R/dn XMT & R/up BOP. Function tested BOP, found OK. M/A & tried to unset PKR
CH-6 10-02-2022 by giving pull up to 1,25,000 lbs. Attempted for several times but without success. Observed H/cone stuck up in tbg head spool. Shut in the well.
DKP001 (WA) 4 Further operation to unset packer to continue in daylight today.
Next Well :MRN024 (WI)-R / MRN108-
R(ESP)/DKP003(ABD)/HJN053(10)/HJN039(5)/MRN089(ABD)/MRN074(ABD)/MRN008(ABD)/MRN025(15000)
POOH 4-5/8" Rotovert with 2-7/8" EUE tbg from 984 m. SLB logging unit with team reported site @ 12:00 PM & r/up logging gears. RIH
CH-7 13-11-2021 Dummy/GR/CCL tool which got held-up @3955 m(F/C @ 3961.98m). In 2nd run recorded USIT/CBL/VDL/CCL log in the range (2855.0 -3949.0)m.
BGN002 (EA) 158 R/dn logging gears. Run OE tbg dn to 473 m & shut in the well. Next job RPM to be c/out today.
Next Well : WDW149-R/HJN059(10)-R/NHK230-R(RP milling)/NHK124-R/ HJN016(10)/NHK648-R
Contd R/in 2 7/8 "Premium VAM tubing with 5 1/2"HW Packer 4327.00 m upto 4387 m. Set HW packer @ 4387.56 m by slacking a weight of
10,000 lbs. Tested Pkr at 500 psi. Found ok. Rig up X-mass tree & tightened all studs properly. M/up gas injection line & connected to well. Applied
CH-8 18-01-2022
gas injection & lowered well fluid level of 700 m. Released casing pressure to zero & shut the well. To perforate the well today with 2 1/8" TTP
SLM038 (WA) 38
gun.
Next Well : MRN094 -R(WI)/NHK652-R/MRN104-RMRN080-R (WI) / MRN119 (ABD)-R/ MRN023(10)/MRN085(10)
SITP - 100 psi, SICP-550 psi. Applied 9 nos. gas shots and unloaded 26 bbls of well fluid. Cumm unloaded 219 bbls. Shut in the well with SITP = Nil,
CH-9 23-01-2022
SICP = 550 psi. 02 nos. of samples from well BMR # 05 are under testing.
BMR005 (WA) 38
Next well: NHK322-R(10)/NHK506/BMR-2-R(HF) /WBM 001(ESP)-R/DHL001(HF)
SITP = 200 psi, SICP = 700 psi. Released well pressure to zero. Applied 06 nos. gas shots and unloaded 7 bbls of well fluids through 8 mm FA bean.
Cumm unloaded 236 bbls. Shut in the well with SITP= Nil & SICP= 700 psi. Sample analysis as on 12.02.2022 at 09:30 am showed f/oil: 13%, water:
CH-10 06-01-2022
87% (pH:8.5, salinity: 1600 ppm, CO3: 60, HCO3: 2440 ppm); at 04:30 pm showed oil: Trace, water: 100% (pH:7.5, salinity: 1600 ppm, CO3: Nil,
NHK242 (WA) 64
HCO3: 2257 ppm)
Next well : DKM003(IAF)-R/DKM017(IAF)-R/DKM025(IAF)-R
Carried out initial fluid level lowering upto 900 m with air compressor. BH Logging unit RIH 2.125" GR-CCL Dummy and recorded log in the range
CH-11 18-01-2022 2709 - 2560 m. Then RIH 2" Spiral TTP and perforated the well in the range 2659 - 2661 m. No immediate pressure build up observed after
HJN034 (EA) 46 perforation. Rig down logging gears. Shut the well. SITP=SICP=0.
Next well: HJN071-R/HJN035-R/MTN006/MTN007
CH-12 13-01-2022 Contd. RIH OE tbg from 143 m to 2675 m. Further RIH is in progress.
BGN011 (EA) 52 Next Well : BGN014-R/HJN057-R/NHK456-R/BGN004-R/BNG003 (ABD)/ NHK542-R/ NHK 499(ABD)/NHK466-R/ KRJ001(IAF)
Contd Initial P/out & recovered 23 sgls of 2 7/8 EUE tbg + 01 x/ over ( Total recovered 264 sgls) . M/Up I/ Block with tbg but got held up at 01 m
CH-13 07-02-2022 below well head. POOH the same. M/up rotovert with sgl & clean down upto 109 m. POOH rotovert. Again lowered I/Block down to 1573 m.
TNL010 (WA) 8 Further R/in is in progress.
Next Well: NHK154-R(15)/SLM013-R/ BGP005-R (SRP)/BGP007/NHK561-R
WLD Mast
() Next Well : MKM011(PLT)/MKM024(PLT)/MKM032(PLT)/SPT001(LCP)
Prod Set-up 01-02-2022 R/dn of acid set-up completed. To raise VTR for transfer of Acid Set-up to next well WDW204.
WDW 069 () 12 Next Well : WDW204/ WDW564/WDW160
S.Mark Setup 04-02-2022 Stand by. Advised to mobilize acid set-up to next well, STL008.
MRN070 (WA) Next Well : STL008/MRN036/BHJ005/BRP003
Note: MMC crew deployed in RG-A , RG-B, RG-C, RG-D, RG-E, BHEL A, BHEL C & DM-4