Oil India Limited 13-Feb-2022 Well Wise Daily Report For Workover Wells
Oil India Limited 13-Feb-2022 Well Wise Daily Report For Workover Wells
Opened the well and unloaded 28 bbls of well fluid through ESP. Cumm unloaded 83 bbls. Shut the well. SICP=SITP=nil. Morning SITP: 150 psi,
CH-4 19-01-2022 SICP: 500 psi. Sample analysis as on 11.02.2022 at 5:00 PM showed- Water: 100% (pH: 8.5; Sal: 500 ppm; CO3: 240 ppm; HCO3: 2440 ppm); at
BRK027 (EA) 46 5:00 PM showed- Water: 100% (pH: 8.5; Sal: 400 ppm; CO3: 600 ppm; HCO3: 1342 ppm).
Next Well: BRK030-R/ SCM003-R(isoln)/ WDW150/DKM022(IAF)-R
Landed Cone and adjusted H/W PKR at 3900 m. Set H/W PKR at 3900 m by slacking 12,000 lbs weight on PKR. Tested PKR @ 500 psi and found OK.
CH-5 28-01-2022 R/dn BOP and Installed X mass tree. Carried out initial fluid level lowering by 400 m with N2 shots. Released the N2 pressure to zero. To perforate
BGN006 (EA) 26 the well today with 2 1/8" TTP gun.
Next Well: HJN014-R(WI)/NHK563/BMR006-R
SITP & SICP= Nil. "B" Annulas pr 100 psi. Released B annulus pr to 50 psi (till displacement of liquid). Topped- up tbg by pumping 19 bbls & csg by 9
bbls of 63 pcf NaCl soln. Observed the well for 1.5 hrs, found ok. R/dn XMT & R/up BOP. Function tested BOP, found OK. M/A & tried to unset PKR
CH-6 10-02-2022 by giving pull up to 1,25,000 lbs. Attempted for several times but without success. Observed H/cone stuck up in tbg head spool. Shut in the well.
DKP001 (WA) 4 Further operation to unset packer to continue in daylight today.
Next Well :MRN024 (WI)-R / MRN108-
R(ESP)/DKP003(ABD)/HJN053(10)/HJN039(5)/MRN089(ABD)/MRN074(ABD)/MRN008(ABD)/MRN025(15000)
POOH 4-5/8" Rotovert with 2-7/8" EUE tbg from 984 m. SLB logging unit with team reported site @ 12:00 PM & r/up logging gears. RIH
CH-7 13-11-2021 Dummy/GR/CCL tool which got held-up @3955 m(F/C @ 3961.98m). In 2nd run recorded USIT/CBL/VDL/CCL log in the range (2855.0 -3949.0)m.
BGN002 (EA) 158 R/dn logging gears. Run OE tbg dn to 473 m & shut in the well. Next job RPM to be c/out today.
Next Well : WDW149-R/HJN059(10)-R/NHK230-R(RP milling)/NHK124-R/ HJN016(10)/NHK648-R
Contd R/in 2 7/8 "Premium VAM tubing with 5 1/2"HW Packer 4327.00 m upto 4387 m. Set HW packer @ 4387.56 m by slacking a weight of
10,000 lbs. Tested Pkr at 500 psi. Found ok. Rig up X-mass tree & tightened all studs properly. M/up gas injection line & connected to well. Applied
CH-8 18-01-2022
gas injection & lowered well fluid level of 700 m. Released casing pressure to zero & shut the well. To perforate the well today with 2 1/8" TTP
SLM038 (WA) 38
gun.
Next Well : MRN094 -R(WI)/NHK652-R/MRN104-RMRN080-R (WI) / MRN119 (ABD)-R/ MRN023(10)/MRN085(10)
SITP - 100 psi, SICP-550 psi. Applied 9 nos. gas shots and unloaded 26 bbls of well fluid. Cumm unloaded 219 bbls. Shut in the well with SITP = Nil,
CH-9 23-01-2022
SICP = 550 psi. 02 nos. of samples from well BMR # 05 are under testing.
BMR005 (WA) 38
Next well: NHK322-R(10)/NHK506/BMR-2-R(HF) /WBM 001(ESP)-R/DHL001(HF)
SITP = 200 psi, SICP = 700 psi. Released well pressure to zero. Applied 06 nos. gas shots and unloaded 7 bbls of well fluids through 8 mm FA bean.
Cumm unloaded 236 bbls. Shut in the well with SITP= Nil & SICP= 700 psi. Sample analysis as on 12.02.2022 at 09:30 am showed f/oil: 13%, water:
CH-10 06-01-2022
87% (pH:8.5, salinity: 1600 ppm, CO3: 60, HCO3: 2440 ppm); at 04:30 pm showed oil: Trace, water: 100% (pH:7.5, salinity: 1600 ppm, CO3: Nil,
NHK242 (WA) 64
HCO3: 2257 ppm)
Next well : DKM003(IAF)-R/DKM017(IAF)-R/DKM025(IAF)-R
Carried out initial fluid level lowering upto 900 m with air compressor. BH Logging unit RIH 2.125" GR-CCL Dummy and recorded log in the range
CH-11 18-01-2022 2709 - 2560 m. Then RIH 2" Spiral TTP and perforated the well in the range 2659 - 2661 m. No immediate pressure build up observed after
HJN034 (EA) 46 perforation. Rig down logging gears. Shut the well. SITP=SICP=0.
Next well: HJN071-R/HJN035-R/MTN006/MTN007
CH-12 13-01-2022 Contd. RIH OE tbg from 143 m to 2675 m. Further RIH is in progress.
BGN011 (EA) 52 Next Well : BGN014-R/HJN057-R/NHK456-R/BGN004-R/BNG003 (ABD)/ NHK542-R/ NHK 499(ABD)/NHK466-R/ KRJ001(IAF)
Contd Initial P/out & recovered 23 sgls of 2 7/8 EUE tbg + 01 x/ over ( Total recovered 264 sgls) . M/Up I/ Block with tbg but got held up at 01 m
CH-13 07-02-2022 below well head. POOH the same. M/up rotovert with sgl & clean down upto 109 m. POOH rotovert. Again lowered I/Block down to 1573 m.
TNL010 (WA) 8 Further R/in is in progress.
Next Well: NHK154-R(15)/SLM013-R/ BGP005-R (SRP)/BGP007/NHK561-R
WLD Mast
() Next Well : MKM011(PLT)/MKM024(PLT)/MKM032(PLT)/SPT001(LCP)
Prod Set-up 01-02-2022 R/dn of acid set-up completed. To raise VTR for transfer of Acid Set-up to next well WDW204.
WDW 069 () 12 Next Well : WDW204/ WDW564/WDW160
S.Mark Setup 04-02-2022 Stand by. Advised to mobilize acid set-up to next well, STL008.
MRN070 (WA) Next Well : STL008/MRN036/BHJ005/BRP003
Note: MMC crew deployed in RG-A , RG-B, RG-C, RG-D, RG-E, BHEL A, BHEL C & DM-4