No. no.
1 ERP is combination of _________ and __________. Module-1 1

a. technology, assessment
b. assessment, management
c. management, technology
d. technology, business process

2 In EPR information technology integrates with company’s Module-1 1


________ to achieve its ultimate goal.

a. business ethics
b. business processes
c. management
d. resources

3 ___________ utilizes software applications for scheduling Module-1 1


production processes.

a. Manufacturing requirement planning


b. Materials requirement planning
c. Inventory management and control
d. Enterprise resource planning

4 Match the following : Module-1 2


1. ERP software A. ERP software, Processes, Hardware
2. MRP-II B. Scheduling Production Processes
3. MRP C. Coordinating manufacturing processes
4. ERP system D. Multi-module application software

a. 1-D,2-A,3-C,4-B
b. 1-A,2-B,3-C,4-D

c. 1-B,2-C,3-D,4-A

d. 1-D,2-C,3-B,4-A
5 Which of the following is true? Module-1 1

a. ERP systems are used only for large organizations.


b. ERP systems are used only in small organizations.
c. ERP systems are used in both large as well as small
organizations.
d. ERP systems are used in long term planning.

6 On which of the following is the ERP system based? Module-1 1

a. Database and Software design


b. Database and Processes
c. Processes and Software design
d. Database

7 Which of the following departments does the effective Module-1 1


utilization, up-dation and integration of updated information?

a. Information technology department


b. Management information system department
c. Quality assurance department
d. Information processing

8 ____________ automatically enables the introduction of Module-1 1


latest technologies such as EDI, EFT, E-commerce etc.

a. Management Information System


b. Open System Architecture
c. Information System
d. Business Intelligence

9 _______ provides a more general and flexible foundation for Module-1 2


the manipulation of information than models underlying
traditional database management systems.

a. Business Intelligence Model


b. Integrated Data Model
c. EFT
d. ERP system
10 Which of the following is a form of Executive Information Module-2 1
System (EIS) and Decision Support System (DSS)?

a. CRM
b. Business Intelligence
c. Data Warehousing
d. OLAP

11 Business modelling tools, data mining tools, performance Module-2 1


reporting tools are known as____________.

a. end user tools


b. business tools
c. management tools
d. OLAP tools

12 Subject-oriented, integrated, time-variant, and non-volatile Module-2 1


are characteristics of _________________.

a. data integration system


b. ERP system
c. data mining
d. data warehouse

13 Given the following bill-of-materials: Module-2 2


If the demand for product A is 50 units, what will be the gross
requirement for component D?

a. 100
b. 200
c. 150
d. 300

14 Each R requires 4 of component S; each S requires 3 of part Module-2 2


T. The lead time for assembly of R is 1 week. The lead time
for the manufacture of S is 1 week. The lead time for the
procurement of T is 6 weeks. The cumulative lead time for R
is ______ weeks.
A. 48
B. 7
C. 8
D. 10
15 Distribution Resource Planning (DRP) is Module-2 1
A. a transportation plan to ship materials to warehouses
B. a time-phased stock replenishment plan for all levels of a
distribution network
C. a shipping plan from a central warehouse to retail
warehouses
D. material requirements planning with feedback loop from
distribution centers
16 Which of the following is a form of Executive Information System Module-2 1
(EIS) and Decision Support System (DSS)?

a. CRM
b. Business Intelligence
c. Data Warehousing
d. OLAP

17 _____________ is a single, complete and consistent store of Module-2 1


data obtained from a variety of different sources made
available to end users in what they can understand and use in
a business context.

a. Data processing
b. Data warehousing
c. Data mining
d. Data Integration

18 _____________ contributes to reverse engineering. Module-3 1

a. Computer aided design


b. Computer aided engineering
c. Digital product development
d. Product data management

19 _______ extends the logic of MRP into the physical Module-3 2


distribution system, provides a mechanism for integrating the
physical distribution system with the production planning and
scheduling system.

a. MRP-II
b. DRP
c. BOM
d. MPS

20 Disposal of any activity that is not value added, but only after Module-3 1
identifying that activity is known as ____________.

a. elimination of waste
b. total quality management
c. JIT
d. Kanban
21 _________________ tries to reduce inventory levels of work Module-3 1
in process (WIP), raw materials, and finished goods.

a. JIT
b. TQM
c. Total production management
d. Kanban

222 Data management systems should be able to manage both Module-3 1


attributing and ________ product data.
a. relational
b. purchase
c. distributed
d. documentary

23 Which is a method of manufacturing which allows company Module-3 2


or desired customer, to select a base product and build up all
the variable parameters associated with that product?
a. Make-to-order
b. Configure-to-order
c. Engineer-to-order
d. Assemble-to-order
24 ________ provides document parking, posting, reporting, and Module-3 2
an integrated financial calendar for automating periodic
activities.
a. EDI
b. EFT
c. General Ledger
d. Workflow Integration
25 Asset accounting manages the company’s _________. Module-3 1
a. fixed assets
b. variable assets
c. leased assets
d. non-working assets
26 Which module includes Executive Information System, Module-3 1
Business Planning and Budgeting, Consolidation, and Profit
Centre Accounting?
a. Enterprise Controlling
b. Executive Information System
c. Business, planning and budgeting
d. Profit Centre Accounting
27 ____________ is a key issue in the formulation of strategic Module-4 1
plans in companies.
a. Designing
b. Development
c. Specialization
d. Flexibility

28 _________ is the ability of the operation to produce Module-4 1


efficiently highly customized and unique products.
a. Product flexibility
b. Process flexibility
c. Information flexibility
d. Time flexibility
29 Which of the following is FALSE? Module-4 1
a. Customization of the ERP software is limited.
b. Information processing in ERP is accurate.
c. ERP is rigid handling.
d. ERP very user friendly and easy to use.
30 Which of the following is TRUE? Module-4 1
a. ERP systems are expensive
b. ERP systems are simple
c. ERP systems are easy
d. ERP systems are user friendly
31 The typology has how many Categories? Module-4 2
a. One
b. Two
c. Three
d. Four
32 Design and development of new quality equipment, Module-4 2
evaluation costs of a new product or ser vice, training of
quality personnel , this category of cost is called _____
a. Internal Failure Cost
b. External Failure Cost
c. Prevention Cost
d. Appraisal Cost
33 ___________ is the time between receipt of the order and Module-4 2
delivery of the product.
a. Cycle time
b. Lead Time
c. Reduction Time
d. Production Time
34 Once a system is established, ____________ are very high for Module-4 1
any partner.
a. Switching costs
b. Shipping costs
c. Brand costs
d. Quality costs
35 What is the Full Form of ECC? Module-4 1
a. Engineering Customer Control
b. Engineering Customer Change
c. Engineering Change Control
d. Engineering Control Change
36 Flexibility and scalability are the part of _______________. Module-5 1
a. evaluation phase
b. pre-evaluation
c. testing
d. gap analysis
37 _________ system reveals not only the strengths of a Module-5 1
company’s business process but also and perhaps more
importantly its weaknesses.
a. Information
b. Configuration
c. ERP
d. Management information
38 Match the following: Module-5 1
1. Identifying third-party a. Makes system
product operational
2. System breaking b. Configuration
3. Process mapping c. Testing phase
4. Going Live d. Gap analysis

a. 1-a,2-b,3-c,4-d
b. 1-c,2-b,3-a,4-d
c. 1-c,2-a,3-d,4-b
d. 1-d,2-c,3-b,4-a
39 The Solution of Today’s Business needs is_______ Module-6 1

a. Enterprise Resource Planning


b. Decision Support System
c. Management Information System
d. Customer Relationship Management

40 To bring together buyers and sellers from the same industry Module-6 1
Which form of e-marketplace is used?

a. Horizontal
b. Vertical
c. Hybrid
d. Inline