Commissioning Check List For Access Control System

The document provides a checklist for testing and commissioning a security access control system at an experience center. It includes checks for control panels, field devices, and power supply and spaces to record test results and sign-offs.

Uploaded by

mohammad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
225 views1 page

Commissioning Check List For Access Control System

The document provides a checklist for testing and commissioning a security access control system at an experience center. It includes checks for control panels, field devices, and power supply and spaces to record test results and sign-offs.

Uploaded by

mohammad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DGDA EXPERIENCE CENTER

CHECK LIST FOR:


Security Access Control System Testing and commissioning Form No: ACS-CHKL01
(Commissioning Report) Rev. No : 0
Page : 1 of 1
SUBCONTRACTOR X CONTRACTOR
SECTION OF WORK: Electrical (ELV) LOCATION:
LEVEL: WIR No.:

Details
Control unit manufacturer: NEDAP
Building Name: EXP CTR.
Panel location:
CONTROL PANEL
Check Yes No Comments
Installation & Termination boards.
Proper identification of cables.
Proper termination of data/Ethernet cables.
Proper termination of power cables.
Status of Alarm indicators.
Status of Alarm Sounders.
Status of fault indicators.
Status of power failure .
Status of Battery failure.
Status of Fire alarm interface.
Other (specify)
FIELD DEVICES
Check Yes No Comments
Status of Access Card Reader.
Status of Push Button.
Status of Electro Magnetic Lock.
Status of Break Glass.
Status of Power Supply Units.
Status of Network Switch.
Status of Door Contacts.
Status of Server and Work Station.
SYSTEM POWER SUPPLY

a ) Primary (main) : Nominal voltage ___230_____ Amps__________

Date _______________________ Time________________________

Page 1 of 1
For S/C QA/QC: Date: FOR CONTRACTOR Date: For CONS. Rep.: Date:
QA/QC:

Name: Sign: Name: Sign: Name: Sign: