Rapid Prototyping Model Coordinate Estimation Using Radial Basis Function
Rapid Prototyping Model Coordinate Estimation Using Radial Basis Function
199 http://sites.google.com/site/ijcsis/
ISSN 1947-5500
(IJCSIS) International Journal of Computer Science and Information Security,
Vol. 9, No. 2, February 2011
200 http://sites.google.com/site/ijcsis/
ISSN 1947-5500
(IJCSIS) International Journal of Computer Science and Information Security,
Vol. 9, No. 2, February 2011
6 0 0 0 25 0 0 25 25 0 0 25 0 12.5 7.22 50
201 http://sites.google.com/site/ijcsis/
ISSN 1947-5500
(IJCSIS) International Journal of Computer Science and Information Security,
Vol. 9, No. 2, February 2011
5 x x x x x x x x x x x x x x x
6 x x x x x x x x x x x x x x x
2 x x x x x x x x x x x x x x x
5 x x x x x x x x x x x x x x x
6 x x x x x x x x x x x x x x x
X represents no coordinates
[1] Rao, P.N., Lerner, Y. and Kouznetsov, V. Rapid Intelligence for Manufacturing. Computational
Malaysia. Vol. 64, No.3, 2003, pp.1-7. [5] Fadel, G.M. and Kirschman, C. “ Accuracy Issues
[2] Pham, D.T. and Dimov, S.S. Rapid in CAD to RP Translations”, Invited paper to the
Manufacturing: The Technologies & Applications first Internet conference on Rapid Prototyping,
of Rapid Prototyping & Rapid Tooling. Springer- Forwarded to Rapid Prototyping Journal, 1995
Verlag, London, 2001.Proceedings of The 2006 [6] Wodziak, J. R., Fadel, G. M. and Kirschman, C.
[3] Fadel, G.M., and Ganti, R. ”Parametric Based part placement to reduce build time”, Paper
Controller For Rapid Prototyping Applications” presented at the Fifth International Rapid
Presented at the 1998 Solid Freeform Fabrication Prototyping Conference, Dayton OH, 1994,
202 http://sites.google.com/site/ijcsis/
ISSN 1947-5500
(IJCSIS) International Journal of Computer Science and Information Security,
Vol. 9, No. 2, February 2011
X -coordinate of P1 Y -coordinate of P1
14 1
Target Target
RBF output 0.8 RBF output
12
0.6
10 0.4
0.2
8
0
6
-0.2
4 -0.4
-0.6
2
-0.8
0 -1
1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6
RP model RP model
Z -coordinate of P1 X -coordinate of P2
1 55
Target Target
0.8 RBF output RBF output
50
Estimated and target coordinate outputs
0.6
0.4 45
0.2
40
0
35
-0.2
-0.4
30
-0.6
25
-0.8
-1 20
1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6
RP model RP model
Y -coordinate of P2 Z -coordinate of P2
1 1
Target Target
0.8 RBF output 0.8 RBF output
Estimated and target coordinate outputs
0.6 0.6
0.4 0.4
0.2 0.2
0 0
-0.2 -0.2
-0.4 -0.4
-0.6 -0.6
-0.8 -0.8
-1 -1
1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6
RP model RP model
203 http://sites.google.com/site/ijcsis/
ISSN 1947-5500