PROJECT ORGANIZATION CHART

SCOPE PEKERJAAN PROYEK PEMBANGUNAN PABRIK COIL SLITTING & CUT TO LENGTH LINE
PT. ALPHA ANUGERAH ABADI

Project Sponsor
AAA Corporate Support : Wisnu Wahjusaputra
1. HRD/ Personalia Logistic Stakeholders
2. Financial
SBSA & AAA Owners
3. Driver
4. OB Project Manager
Basuki Kresnajaya

Project Planning & Production System


Control Expert/ Advisor
COORD TBA Muhajid

Scheduling Design Pondasi Mesin


Dewi M TBA - 1

Cost Control Design Verification


Ely Zabet TBA - 2

HSE Officer
Aksan Damiri

Engineering Team
Procurement Construction
Leader

TBA - F1 COORD TBA - 1 COORD TBA - 1

Purchasing &
LEAD. Arsitektur LEAD. Mekanikal & LEAD. Elektrikal & Subcontract
LEAD. Sipil Bangunan LEAD. Geoteknik Civil Site Enginneer Mechanical & Electrical
Lansekap Plumbing Telekomunikasi
TBA - 2 Plumbing Site Site Engineer
TBA - F2 TBA - F3 TBA - F4 TBA - F5 TBA - F6 Ely Zabet Engineer

Logistic TBA - 2 TBA - 3

Estimator LEAD. Lingkungan LEAD. K3 Konstruksi


TBA - 3
TBA - F2.1 TBA - F7 TBA - F8 Juru Ukur/ Surveyor Material W/H &
Storekeeper
TBA - 5
Design Drafter TBA - 4
Operator CAD
TBA - F2.2 (Drafter)
TBA - 6