This document contains information about building management systems for an air handling unit, exhaust fan, and service building. It includes statuses for filters, fans, humidifiers, temperatures, pressures, and more. It also shows the control and feedback loops between devices.

Uploaded by

Anonymous qOBFvI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
685 views8 pages

Air Handling Unit (DDC 02)

This document contains information about building management systems for an air handling unit, exhaust fan, and service building. It includes statuses for filters, fans, humidifiers, temperatures, pressures, and more. It also shows the control and feedback loops between devices.

Uploaded by

Anonymous qOBFvI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

AI

DI

AO
DO

Client:
Fresh Air
Pre Filter Status PRE FILTER

DPS
HEPA Filter Status HEPA FILTER

DPS

Consultant:
Cooling Valve Control/Position
Feedback

x4
Electric Heater Stage Selection

HCP

Contractor:
x2
Supply Fan Trip Status

x2
Supply Fan Status
DPS

x2
Supply Fan Start /Stop
Supply Fan Auto/

x2
MCC Panel

Manual
Supply Fan Manual Status

x2

Supply Fan Air Flow

Humidifier Feedback
Air Handling Unit (DDC 02)

Humidifier Command
BMS Contractor:
Humidifier Control
Humidifier

Supply Air Humidity

Supply Air Temperature

Smoke Detector
Project:
SD

Drawn By :
Qudah
Checked By :
Sheet No :
Project No.
Supply Air

Date :
KSMT
Drawing Number:

26 April 2018
Revision No. :
00
EXHAUST FAN (DDC 02)

R.D

DPS

SD P.S

MCC
Duct Smoke Detector

Pressure Sensor

Fan Start/Stop Command

Differential Pressure
Fan Manual Status

Fan Auto Status


Fan Status
Fan Trip

DI x2 x2 x2

AI
DO x2

AO

Client: Consultant: Contractor: BMS Contractor: Project:


KSMT
Drawn By : Project No. Drawing Number:
Qudah
Checked By : Sheet No : Date : Revision No. :
26 April 2018 00
Service Building (DDC 04)

MDB EMDB ATS Ring Main Unit Transformer

ESMDB Status

ESMDB Status
EMDB Status

ESMDB Trip

ESMDB Trip
MDB Status

EMDB Trip
MDB Trip

Alarm

Fault
DI
AI
DO
AO

Client: Consultant: Contractor: BMS Contractor: Project:


KSMT
Drawn By : Project No. Drawing Number:
Qudah
Checked By : Sheet No : Date : Revision No. :
26 April 2018 00
Generator (DDC 04)

Level Sensor By
Other

DAILY FUEL
TANK

GENERATOR CONTROL PANEL

Fuel Tank Level


General Alarm
Status

DI
AI
DO
AO

Client: Consultant: Contractor: BMS Contractor: Project:


KSMT
Drawn By : Project No. Drawing Number:
Qudah
Checked By : Sheet No : Date : Revision No. :
26 April 2018 00
Low Current System (DDC 03)

Nurse Call Fire Fighting


FM200 ESMDB Fire Alarm CCTV Access Control Public Address IP Clock System UPS
System System

Battery On Load

Supervisory Valve Status


Flow Switch Status
Common Alarm
ESMDB Status

General Alarm

On /Off Status

On /Off Status
Station On /Off
ESMDB Trip

On /Off Status

Main Failure
Door Status

Over Load
Alarm

Fault

DI x5 x5

AI
DO
AO

Client: Consultant: Contractor: BMS Contractor: Project:


KSMT
Drawn By : Project No. Drawing Number:
Qudah
Checked By : Sheet No : Date : Revision No. :
26 April 2018 00
Chiller (DDC 01)
CH-FS
BFV-S F
CHS-T BFV-C

BFV

CHILLER-1
CH-FS
BFV-S
CHS-T BFV-C F

BFV

CHILLER-2

CHR-T

Common Chilled Water Supply Temp


Chiller Butterfly Valve Command

Chiller Butterfly Valve Status


Common Chilled Water Return Temp

Chiller Supply Temperature


MCC

Chiller Water Flow Status


Chiller Start/Stop Command

General Alarm
Chiller Run Status

DI x4 x4 x2 x2

AI x2

DO x4 x2

AO

Client: Consultant: Contractor: BMS Contractor: Project:


KSMT
Drawn By : Project No. Drawing Number:
Qudah
Checked By : Sheet No : Date : Revision No. :
26 April 2018 00
Client:
AI
DI

AO
DO
Pump Flow Status

x2
Pump Auto Status
F

Consultant:
Pump VFD Feedback

x2
Pump Alarm Status

x2
Pump Start/Stop Command
Secondary Pump

MCC / VFD

x2
Pump VFD Control

x2
Pump Run Status
F

x2
Pump Flow Status

Contractor:
DPT

Differential Pressure

Pump Flow Status

Pump Auto Status


F
x2

Pump Alarm Status


x2
MCC

Pump Start/Stop Command


Primary Pump

x2

Pump Run Status


BMS Contractor:
Primary And Secondary Pumps (DDC 01)

x2

Pump Flow Status


Project:

Drawn By :
Qudah
Checked By :
Sheet No :
Project No.

Date :
KSMT
Drawing Number:

26 April 2018
Revision No. :
00
VAV

Exhaust Damper
R.D

VAV Box
Damper

HCP

Exhaust Air Damper Control


Room Pressure Set Point
Room Pressure Sensor

Door Contact

Room Temperature Sensor


Supply Air

Unit Pressure Sensor


Heater Safety Status
Heater Command
Damper Control

FAN Command

FAN Status
DI
AI
DO
AO
SA BUS
BACnet

Client: Consultant: Contractor: BMS Contractor: Project:


KSMT
Drawn By : Project No. Drawing Number:
Qudah
Checked By : Sheet No : Date : Revision No. :
26 April 2018 00