TMC-BHGE-NovaLT - Gas Turbine - Brochure
TMC-BHGE-NovaLT - Gas Turbine - Brochure
TMC-BHGE-NovaLT - Gas Turbine - Brochure
Gas Turbines
Here shown
NovaLT16
Best in class
efficiency NovaLT5 (5 MW)
NovaLT12 (12 MW)
for your plant NovaLT16 (16 MW)
NovaLT TM
Baker Hughes
gas turbines
Designed to meet the needs of industrial
applications, the NovaLT is setting new
standards in cost-effectiveness for the
entire asset lifecycle.
Visit us at bakerhughes.com
Your ideal match Fleet-wide experience, best in class efficiency (up to 36% electrical
and 85% CHP) and flexibility (granting consistent high performance
410
260
400
390 250
380
370
Steam turbine market 240
360 230
350
220
340
330 210
MAX MAX
320
200
310
300 STEAM 190 HEAT
290
180
280
4 LT16
270 170
260
250 160
4LT16
240
150
230
220 140
210
4LT12
4 LT12
130
3LT16
200
3 LT16
STEAM DEMAND TON/H 10 BARG SATURATED
190 120
180
110
170
3 LT12
160 100
3LT12
150 Optimum Application
SHR
2 LT16
90
140
2LT16
130
SHR 80
2LT12
120
4 LT5
2 LT12
70
4LT5
110
100
60
90
3 LT5
3LT5
80 50
1 LT16
1LT16
70
40
2 LT5
1LT12
1 LT12
60
2LT5
50 30
40
20
1 LT5
30
1LT5
20
10
Gas engine market 10
0
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58
Lower maintenance
cost w/ 99% availabilitY
3-4 years continuous run without maintenance stops
NovaLT5-1 ... 30 hours engine swap
NovaLT12, LT16 ... 24 hours engine swap
New, modular
design platform
Leading to competitive cost and reduced activities at site for installation.
Forward thinking, design flexibility, uniform speed & quality.
Increased partial
load performance
Significantly higher than competition, while being slightly better at full load. Here shown NovaLT12
The NovaLT family Performance
Electrical output
NovaLTTM5-1 IPG
12.2Mwe (*)
NovaLTTM16 IPG
of gas turbines:
Efficiency @ full load 30.7% (*) 35.2% (*) 36.1% (*)
full coverage
Shaft nominal speed (rpm) 16,630 (**) 8,900 7,800
from 0 to 20 mw
Remote Energy
Monitoring management suite
Issues management Energy monitor
Manage issues proactively to Monitoring of energy
prevent asset failures. systems (KPI calculation,
balances, etc.)
Asset optimization
Troubleshoot and solve Energy multi-period optimizer
problems by working with Optimal planning and
engineering departments. scheduling of utility assets.
Optimize asset performance
and operation. Energy real time optimizer
Here shown NovaLT5
Real-time solution for modeling
and optimization of energy
systems (open or closed loop).
Baker Hughes
NovaLT5
An example of
Hours 35,000 70,000
F2F - exchange
F2F - FSE
BASE FULL F2F - Craft labor
For customers who require Baker Hughes For customers who require Baker Hughes
support only for maintenance of flange-to- maintenance services on auxiliary systems Tooling
flange equipment (gas turbine). and driven equipment, beyond the Base contract.
MANTEINANCE
Train auxiliaries - Parts and repairs
Contract includes: All services of the Base contract Train auxiliaries - FSE
Gas turbine exchange every 35,000 factored fired hours Parts and repairs for auxiliary systems and
Field services needed for site activities driven equipment Train auxiliaries - Craft labor
Wear parts required at site for the gas turbine exchange Field services for auxiliary systems and driven
equipment Driven equipment - Parts and repairs
Tooling necessary for gas turbine exchange
Craft labor can be offered as an option
Advisory monitoring and diagnostics from iCenter Driven equipment - FSE
Craft labor can be offered as an option
Driven equipment - Craft labor
Unplanned coverage
CONTRACTUAL
gas turbine maintenance support plus services beyond the Full contract scope.
24/7 Customer service center
additional contractual services.
Contractor representative response time (72 hrs at site)
Contract includes: All services in the Full contract
All services of the Base contract Unplanned maintenance on full coverage Spare gas turbine availability program (72 hrs ready for shipment)
Project management support from Baker Hughes office 24/7 Customer Service Center
24/7 Customer Service Center Project management support from Baker Hughes office
Auxiliaries stock availability program (72 hrs ready for shipment)
Contractor intervention time within 72hrs Contractor intervention time 72hrs Availability guarantee
Gas Turbine Availability Program Gas Turbine Availability Program
Availability Guarantee Auxiliaries Stock Availability Program
Craft labor can be offered as an option Included Optional
Extended systems
integration
capabilities
Baker Hughes is able to support your project
from the conceptual engineering phase through
to commissioning, operations and services,
supporting your plant with turnkey solutions.
Concept
Engineering
Construction services
Service support
Technology
heritage
and references
World leader
in gas turbine technology.
NovaLT12
Best efficiency for your plant
NovaLT5
Best in class lead and delivery time
single lift package solution
Copyright 2019 Baker Hughes Company LLC. All rights reserved. The
information contained in this document is company confidential and
proprietary property of Baker Hughes and its affiliates. It is to be used only
for the benefit of Baker Hughes and may not be distributed, transmitted,
reproduced, altered, or used for any purpose without the express written
consent of Baker Hughes.
Baker Hughes reserves the right to make changes in specifications and
features shown herein, or discontinue the product described at any time
without notice or obligation. Contact your Baker Hughes representative for
the most current information. The Baker Hughes logo [add any relevant
trademarks here] are trademarks/is a trademark of Baker Hughes
Company LLC. bakerhughes.com