Chapter-I
We are routinely faced with the challenge of making significant decision when selecting an
alternative over another. These are decisions of how to best invest the funds or capital of
the company. The usual factor may be once again economic and non-economic or tangible
or intangible.
Engineering economy, quite simply, is about determining the economic factors and the economic
criteria utilized when one or more alternatives are considered for selection. Another way to define
engineering economy is a collection of mathematical techniques which simplify economic
comparisons. With these techniques, a rational, meaningful approach to evaluating the economic
aspects of different methods (alternatives) of accomplishing a given objective can be developed.
The role of engineering economics is to assess the appropriateness of a given project, estimate its
value, and justify it from an engineering standpoint.
Alternatives usually involve information that as first cost (including purchase price, construction,
installation and delivery cost), expected life, estimated annual incomes and expenses of the
alternatives (including annual maintenance and upkeep costs), projected salvage value (resale or
trade-in value), an appropriate interest rate (rate of return), and possibly income tax effects.
Alternatives may be compared directly if they are converted to a common measure. The common
denominator applicable in economic comparisons is value expressed in terms of money. Most
other activities that appear in various activities, such as time, distance, and quantity may often be
converted to monetary terms. This is because of the pervasive nature of the economic system in
which we live in.
Page |1 G4C(2010/11)
Department of civil & urban engineering ENGINEERING ECONOMICS
In order to quantify and compare as many aspects a proposal as possible, a common denominator
for most purpose is the birr/dollar value. For this reason most of the significant attributes of
a project are reduced to a birr value wherever possible.
It is essential to convert the prospective output and input items enumerated in the definition step
into receipts and disbursements at specified dates. This phase consists of appraising the unit value
of each item of output or input and determining their total amounts by computation. On
completion, each alternative should be expressed in terms of definite cash flows occurring
at specified dates in the future, plus an enumeration of qualitative considerations that are
impossible
to reduce to monetary terms. For such items, the term irreducible is often employed.
Engineering economy has a major role in steps 2,3, and 5, and it is the primary technique in step 4
to perform the economic-based analysis of each alternatives. Steps 2 and 3 set up the alternatives,
and engineering economy help structure the estimates of each one. Step 4 utilizes one or
more engineering economy model discussed in this course to complete the economic
analysis upon which a decision is made.
Page |2 G4C(2010/11)
Department of civil & urban engineering ENGINEERING ECONOMICS
Page |3 G4C(2010/11)
Department of civil & urban engineering ENGINEERING ECONOMICS
Such activities tend to become natural monopolies. Monopolies both tend to produce less and
charge more for goods and services than they would under competitive conditions. Market
mechanism may be deficient in generating competition. Many water infrastructure projects such as
large dams, sewerage systems, water supply systems and canal head works provide ready examples
of such natural monopolies.
Equity: distribution of costs and benefits over different social classes and different regions.
Eg. Block tariffing in public water supply.
Inter-generation effects or long term aspects: distribution of costs and benefits
over time. Distribution of natural resources may be beneficial to actual generation but
hampers future development potential. Level of national debt may become a burden
to future generation.
Feasibility of implementation: should be evaluated in technical, financial, social,
and administrative senses. Socially in the sense that reluctance of social groups to
accept certain effects of the project may be there. Administrative wise compatibility
with other development plans of the government has to be considered.
CLASSIFICATION OF COST
A key objective in engineering applications is the satisfaction of human needs, which will nearly
always imply a cost.
Economic analyses may be based on a number of cost classifications:
1. First (or Initial) Cost : Cost to get activity started such as property improvement,
transportation, installation, and initial expenditures.
2. Operation and Maintenance Cost : They are experienced continually over the useful life
of the activity.
3. Fixed Cost : Fixed costs arise from making preparations for the future, and includes costs
associated with ongoing activities throughout the operational life-time of that
concern. Fixed costs are relatively constant; they are decoupled from the system
input/output, for example.
4. Variable Cost : Variable costs are related to the level of operational activity (e.g. the cost
of fuel for construction equipment will be a function of the number of days of use).
5. Incremental or Marginal Cost : Incremental (or marginal) cost is the additional expense
that will be incurred from increased output in one or more system units (i.e.
production increase). It is determined from the variable cost.
6. Sunk Cost : It cannot be recovered or altered by future actions. Usually this cost is not a
part of engineering economic analysis.
7. Life-Cycle Cost : This is cost for the entire life-cycle of a product, and includes feasibility,
design, construction, operation and disposal costs.
Page |4 G4C(2010/11)
Department of civil & urban engineering ENGINEERING ECONOMICS
hand in the present so long as money has earning power over time. Thus, the fact that money has
value means that equal dollar amounts at different points have different value when the interest
rate that can be earned exceeds zero.
It could also be argued that money has a time value because the purchasing power of a
dollar
changes through time. During periods of inflation, the amount of goods that can be bought for a
particular amount of money decreases as the time of purchase occurs further out in the future.
The concept of time value of money is vitally important for alternative aspects which can
be quantified in terms of dollar or birr. It is often said that money for if we makes
money. The statement is indeed true, for if we elect to invest money today (for example, in a
bank, a business
or a stock mutual fund), we inherently expect to have more money in the future. This change in the
amount of money in a given time period is called the time value of money; it is the most important
concept in engineering economy. You should also realize that if a person or a company finds it
necessary to borrow money today, by tomorrow more than the original loan principal will be owed.
This fact is also explained by the time value of money.
Page |6 G4C(2010/11)
Department of civil & urban engineering ENGINEERING ECONOMICS
By far the most common time period in which to express an interest rate is 1 year. However, since
interest rate may be expressed over periods of time shorter than 1 year, for example 1% per month,
the time unit used in expressing an interest rate must also be identified. This period is called
interest period.
Examples
With an interest rate of 6%, show that $94.34 last year, $100 now, and $106 one year from
now are equivalent. This is the concept of equivalence; READ more about it.
For more than one interest period, the terms simple interest and compound interest are used.
Example:
Compute the compound interest and loan balance for each year for the $1000 a certain person
borrowed at 5% per year. Graphically compare the result for compound interest and
simple interest.
Solution:
End of
Year Amount Interest
borrowed Rate interest Balance
0 $1,000.00 5% $1,000.00
1 $50.00 $1,050.00
2 $52.50 $1,102.50
3 $55.13 $1,157.63
Page |7 G4C(2010/11)
Department of civil & urban engineering ENGINEERING ECONOMICS
$1,200.00
wed($)
1157.63
$1,150.00 $1,150.00
$1,102.50
$1,100.00 $1,100.00
s imple interes t
$1,050
$1,050.00 c ompound interes t
$1,050.00
$1,000
$1,000.00 $1,000.00
$950.00
0 1 2 3
End of interest Period
Exercise:
A loan of $1,000 is made at an interest of 12% for 5 years. The interest is due at the end of
each year with the principal is due at the end of the fifth year. Compute the compound interest
and loan balance for each year.
Note!
The word interest rate is used for the borrower’s vantage, when money has been
borrowed, or when a fixed interest is established. There is another term known as rate of return
(ROR) which is equivalent to the term interest rate but it is commonly used when estimating the
profitability of a proposed alternative or when evaluating the results of a completed project or
investment. However, both are represented by the later i.
Investment alternatives are evaluated upon the prognosis that a reasonable ROR can be expected.
Some reasonable rate must therefore be selected and utilized in the selection criteria phase of the
engineering economy study approach. The reasonable rate is called the minimum attractive rate of
return (MARR).
Even though financial institutions may use more than one interest period per year in
compounding the interest, they usually quote the interest on an annual basis. For
Page |8 G4C(2010/11)
example, a year’s rate at 1.5% compounded monthly is typically quoted as “18%
compounded monthly”. When stated in this fashion, the 18% is called a nominal interest
rate or annual percentage rate. The effective interest rate represents the actual interest
earned or charged for a specified time period. The effective interest rate based on a year
is referred to as the effective annual interest rate ia. The effective interest rate based on
the payment period is called the effective interest rate per payment period ie. In genera
m
⎛ r⎞
ie ⎜ 1 ⎟ 1
⎝ m⎠
Where, r = nominal interest rate (per year)
i= actual (effective interest rate) per year
m= number of interest periods per year
ie= effective annual interest rate
Example: Suppose a bank charges a rate of 12% compounded quarterly (four times per
year). This means that 3% is charged every quarter. The interest per dollar accrued at the
4
end of the year is (1.03) − 1 = 0.1255. Thus the effective annual interest rate is ia
=
12.55%. If the interest is compounded monthly (12 times per year) then the effective
12
annual interest rate is ia = (1.01) −1 = 0.1268 = 12.68%.
Continues compounding:
As a limit interest may be considered to be compounded an infinite number of times per year, i.e.
continuously.
The concept of continues compounding is useful as an approximation to compound increases of
income, expenditures, population, traffic count or similar events, which are spread over the year
instead of concentrated at years end.
In this case:
m
⎛ r⎞
ie ⎜ 1 ⎟ 1
⎝ m⎠
r
m
m ⎛ ⎞ m
r r ⎞r ⎟ ⎛ r⎞
ie lim ⎛⎜1 ⎞⎟ ⎜ ⎛
1 , but ⎜ ⎜1 ⎟ ⎟ ⎜1 ⎟
m ⎯⎯ ⎝ m⎠ ⎜⎝ m⎠ ⎟ ⎝ m⎠
⎝ ⎠
m
Let, y
r
y
⎛ 1⎞
lim⎜1 ⎟ e
y
⎝ y⎠
m
⎛ r⎞
i e lim⎜ 1 ⎟ 1 e 1
y
⎝ m⎠ r
… For continuous compounding
================================================================
Compounding Number of Effective interest Effective annual
frequency Periods rate per period interest rate
================================================================
Since there are two parties to every transaction, it is important to not those cash flow directions in
Cash flow diagrams depend upon the point of view taken.
Notation
To simplify the subject of economic analysis, symbols are introduced to represent types of cash
flows and interest factor. the following symbols will be used here:
P = Present sum of money ($)
F = Future sum of money ($)
n=Number of interest periods
i = Interest rate per period (%)
n
The factor (1+i) is called the single payment compound-amount factor (SPCAF) or the F/P factor.
By rearranging equation (1.) discounting equation can be given as:
⎡ 1 ⎤
PF⎢ n ⎥ ….. (1.2)
⎣ 1 i ⎦
The expression in the brackets is known as single-payment present-worth factor (SPPWF), or the
P/F factor.
Derivation of The Uniform Series Present Worth Factor and Capital Recovery Factor
(P/A
And A/P)
P
1 2 3 4 5 n
A
The present worth P of the uniform series shown above can be determined by considering each A
value as a future worth F and using equation 1.2 with the P/F factor and then summing the present-
worth values.
⎡ 1 ⎤ ⎡ 1 ⎤ ⎡ 1 ⎤ ⎡ 1 ⎤
P A⎢ 1⎥
A ⎢ ⎥ A ⎢ ⎥ ….. + A ⎢ ⎥
⎣ 1 i ⎣ 1 i ⎣ 1 i ⎣ 1 i ⎦
2 3 N
⎦ ⎦ ⎦
⎡ ⎤
P A⎢ 1 1 1 .... 1 n⎥
⎣ 1 i 1 i 1 i ⎦
2
Multiplying both sides by 1/(1+i);
P ⎡ 1 1 1 ⎤
A⎢ .... n 1⎥
1i ⎣ 1 i 13 1 i ⎦
2 i
After some simplification of the above equation, we com up with:
⎡ 1 i n 1⎤
P A⎢ n
⎥....i 0
⎣ i 1 i ⎦
…… (1.3)
The terms in brackets is called the uniform-series present-worth factor (US-PWF) or the P/A
factor.
⎡ i 1 i n ⎤
A P⎢ n
….. (1.4)
⎥ 1 i
1 ⎣ ⎦
In equation 1.4 the terms in the bracket is called capital-recovery factor (CRF), or A/P
factor,
yields the equivalent uniform annual worth A over n years of a given investment P when the
interest rate is i.
Derivation Of The Sinking Fund Factor And The Uniform –Series Compound-Amount
Factor (A/F And F/A)
While the sinking-fund factor (SFF), or A/F factor, and the uniform-series compound-amount
factor (USCAF), or F/A factor, could be derived using the F/P factor, the simplest way to derive
the formula is to substitute into those already developed. Hence,
⎡ i ⎤
AF⎢ A/F factor ….. (1.5)
n
⎥ 1 i
1 ⎣ ⎦
⎡ 1 i n 1 ⎤
F A⎢ ⎥ F/A factor …… (1.6)
⎣ i ⎦
Points to ponder
i. The end of one year is the beginning of the next year
ii. P is the beginning of a year at a time of recorded as a present
th
iii. F is the end of the n year for a time recorded as being present.
iv. A is occur at the end of each year or the period under consideration. When P and A are
involved the first A of the series occurs one year after P. when F and A are involved the
last A of the series occurs at the same time as F.
1. You put 1000 birr in a bank account at the end of 2000. The interest rate is 7% per year.
What amount will you have in your account at the end of 2015?
st
2. What deposit should you make on 1 January 2001, in order to obtain an amount of
st December
$100,000 on 31 2011? The interest rate is 6%.
3. If you make an annual deposit of 2000 birr with a bank at the beginning of the year, starting
st st
1 January 2001, what will be the value of all deposits on 31 December 2011, if the
interest rate is 6%?
4. If you place 20,000 birr in a bank at the end of 2000, yielding 7% interest, what
equal amount can you withdraw at the end of every year, starting at the end of the year
2010, and continuing during 5 more years thereafter, so that the account is depleted
at the end of
2015?
st
5. What deposit at the end of each month should you make, starting 31 January
st
2001, in order to obtain an amount of $25,000 on the 31 December 2011? Assume
an annual interest rate of 6% and monthly discounting.
6. How much must a family invest now to provide a lump sum of $1000 for school fees at the
end of 6 years, 8 years, and 12 years from now if interest rate is 5%?
P=?
Year
P= $1000,000
F=?
A=$45,000/year
8. A uniform annual investment is to be made into a sinking fund with a view to providing the
capital at the end of 7 years for the replacement of a tractor. An interest rate of 6 per cent is
available. What is the annual investment needed to provide for 50,000 birr?
F=50,000 Birr
A=?/year
9. A unit of mechanical equipment has an initial cost of 100,000 birr and annual maintenance
expenditure to average 12,000 birr for its 8 years of life. If interest is at 10% and the
equipment has no salvage value, what is its equivalent annual cost, excluding labor, fuels,
etc.?
P= 100,000
A=12,000/year
10. If the maintenance cost of a bulldozer amounts to 2000 birr by the end of the first year of
its service, 2500 birr by the end of the second and 3000 birr, 3500 birr, 4000 birr by the end
of the third, fourth, and fifth year respectively, find the equivalent uniform series cost each
year over a period of 5 yeas, interest is at 5%.
A=2000 Birr
2000
2500
G=500 birr
3000
3500 4000
11. If a mill building is constructed of reinforced concrete (option-1), it will have an estimated
initial cost of $200,000 and no maintenance costs for the first 10 years. A building to serve
a similar purpose but erected in structural steel-work and clad in plastic coated metal sheets
(option-2) has an initial cost of $160,000 but the steel-work needs to be painted every 2
years at a cost of $14,000. With interest at 10%, which is the cheapest investment
considered over the first 10 years of the building life?
12. If a proposal for the installation of equipment in a factory require a capital investment now
of 10,000 birr, what saving per year must be shown over the next 10 years to justify the
expenditure at an interest rate of 5%?
13. A man and wife buy a house and take out a mortgage of $60,000 to meet part of the cost.
They agree to pay of the mortgage over 25 years making monthly payments; interest on the
mortgage is 10.5% per year. To what will the monthly payment amounts? What amount of
the original debt of $60,000 will remain after they made 250 payments?
14. The purchaser of an automobile is paying for it at the rate of 600 birr per half-year, having
agreed to make 10 such payments, but after 2 years, when the fourth payment become due,
decides to make a lump sum payment to settle the account. With an interest rate of 10%,
how much will be needed to do this if there is no rebate of the interest to be changed for the
whole of the 5 years?
15.
A=600birr/year Lump sum payment