The document outlines the table of contents for a project report on developing a new system. It includes 8 chapters that will analyze the existing system, requirements for the new system, project planning, system analysis, design of the new system, testing procedures, and conclusions. Chapter 1 will introduce the project and objectives. Chapter 2 will examine the need for a new system and feasibility study. Chapter 3 covers project scheduling and planning. Chapter 4 includes requirements analysis, architecture, and technologies. Chapter 5 details system design through modules, UML diagrams, interfaces and databases. Chapter 6 addresses testing techniques, strategies and reports. Chapter 7 provides conclusions and future work.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
79 views3 pages
Table of Content
The document outlines the table of contents for a project report on developing a new system. It includes 8 chapters that will analyze the existing system, requirements for the new system, project planning, system analysis, design of the new system, testing procedures, and conclusions. Chapter 1 will introduce the project and objectives. Chapter 2 will examine the need for a new system and feasibility study. Chapter 3 covers project scheduling and planning. Chapter 4 includes requirements analysis, architecture, and technologies. Chapter 5 details system design through modules, UML diagrams, interfaces and databases. Chapter 6 addresses testing techniques, strategies and reports. Chapter 7 provides conclusions and future work.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3
TABLE OF CONTENTS
Sr. Content Page
No. No. TITLE PAGE BONAFIDE CERTIFICATE ABSTRACT ACKNOWLEDGEMENT TABLE OF CONTENTS 1. Introduction 1 (Chapter 1) 1.1 GENERAL DESCRIPTION OF PROJECT 2 1.2 OBJECTIVE 2 1.3 SCOPE 2. STUDY OF EXISTING SYSTEM AND SYSTEM 3 REQUIREMENTS (Chapter 2) 2.1 IDENTIFICATION OF NEED 3
2.1.1 EXISTING SYSTEM & ITS LIMITATIONS 3
2.2 PRELIMINARY INVESTIGATION 3
2.2.1 PROPOSED SYSTEM 4
2.3 FEASIBILITY STUDY 4
2.3.1 TECHNICAL FEASIBILITY 4
2.3.2 OPERATIONAL FEASIBILITY 4
2.3.3 ECONOMICAL FEASIBILITY 4
3. PROJECT PLANNING (Chapter 3) 3.1 GANTT CHART 5
3.2 PROJECT SCHEDULE TABLE 6
4. SYSTEM ANALYSIS (Chapter 4)
4.1 SOFTWARE REQUIREMENT SPECIFICATION 7
4.1.1 EXTERNAL INTERFACE REQUIREMENT 7
4.1.1.1 USER INTERFACE 7
4.1.1.2 HARDWARE INTERFACE 7
4.1.1.3 SOFTWARE INTERFACE 7
4.1.2 FUNCTIONAL REQUIREMENT OF THE 8-9 SYSTEM 4.1.3 NON-FUNCTIONAL REQUIREMENT 8-9