NSB - Justification Letter
NSB - Justification Letter
NSB - Justification Letter
TO : Safety Department
Sir/Ma’am,
Good day! I would like to inform your good office and request for your consideration on the additional
manpower of Xander Construction who will work at rebar works for two weeks without medical
requirements
1. Eduardo Hallasgo
2. Melvin Gumboc
3. Jayson Grantes
4. Perlito Magdaong
5. Ronald Gerante
6. Adonis Tiozon
7. Noli Nasinopa
8. Rolly Del Abanda
9. Andrew Abanil
Yours truly,
Geralyn Baliguat
Owner - Xander Construction
Noted by:
TO : PAYROLL DEPARTMENT
CC : MR. ISMAEL REPOLLO
Project Time Keeper
Sir/Ma’am,
Good day! I would like to inform your good office and request for your consideration on the straight time work at Concrete
Pouring of North Tower Second Floor Fire Exit Stairs of the following ADMIN workers Below are the list of manpower:
1. Sally Ogale
2. Aquilino Cabreros
3. Gilbert Abalos
4. Christian Cabreros
5. Deo Duran
6. Ramond Mayugba
7. Bernabe Labaniego
Yours truly,
Dannielle Cortez
Construction Superintendent
Noted by:
TO : PAYROLL DEPARTMENT
Sir/Ma’am,
Good day! I would like to inform your good office and request for your consideration on the straight time work of the
following line and grade aid who complete the layout punch listed by the DPWH inspector at Ground Floor Slab North
Tower, April 2, 2022 from 11:30 a.m. to 02:00p.m. Below are the list of the line and grade aid:
Yours truly,
Noted by:
TO : PAYROLL DEPARTMENT
Good day! I would like to inform your good office and request for your consideration for my, Nichole Dannielle Cortez – CS
REBAR of North Tower, straight time last March 26, 2022 from 11:30am to 2:00pm this is due to Monitoring of
Rectification of Punchlist of Rebar Installed at Block 9 and 10 Ground Floor Slab
Yours truly
Dannielle Cortez
Construction Superintendent
Noted by:
TO : PAYROLL DEPARTMENT
Sir/Ma’am,
Good day! I would like to inform your good office and request for your consideration for my straight time last February 7,
2020 from 5:00pm-6:00pm this is due to the preparation of the area for rebar inspection in preparation for concrete pouring
of North Tower Mat Foundation.
Yours truly,
Benarch Frias
Construction Superintendent
Noted by:
TO : PAYROLL DEPARTMENT
Sir/Ma’am,
Good day! I would like to inform your good office and request for your consideration on the straight time work
of the following Admin Workers listed below from 12:00 m.n. to 5:00 a.m. for the scheduled concrete pouring
of basemen 2 slab, July 6, 2019.
- SEBASTIAN SOBRERA
- REVELANDO MATOTE
- ROLLY GABRERA
- RAFFY GABRERA
Yours truly,
Engr. ND Cortez
Construction Superintendent
Noted by:
Sir,
Good day! I would like to inform your good office and request for your consideration on the straight time work
of the following Admin Workers listed below last November 06, 2021 from 5:00 p.m. to 6:00 p.m. for the
scheduled concrete pouring of South Tower Retaining Wall (GL A’/6-11).
1. MARLON ABARQUEZ
2. SLAUGHTER DUMALI
3. JELLY REQUINALA
4. LIBO-OH JOSEPH JR.
5. JEFFREY REONAL
6. RAYMOND JUMAQUIO
7. JERIC CARULLIO
8. LEO REQUINALA
9. JULIO ALPITCHE
Yours truly,
JERANIE SIMBULAN
Construction Superintendent
Noted by:
TO : PAYROLL DEPARTMENT
Sir,
Good day! I would like to inform your good office and request for your consideration on the straight time work
of the following Admin Workers listed below last Ocober 21, 2021 from 5:00 p.m. to 6:00 p.m. for the
scheduled concrete pouring of South Tower Slab (GL F-G/4-6).
1. MARLON ABARQUEZ
2. SLAUGHTER DUMALI
3. MANUEL DELA CRUZ
4. JEFFREY REONAL
5. LEO REQUINALA
6. JELLY REQUINALA
7. JULIO ALPITCHE
8. JERIC CARULLO
Yours truly,
Benarch Frias
Construction Superintendent
Noted by: