NSB - Justification Letter

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 8

Date : April 2, 2022

TO : Safety Department

CC : MR. Darwin Maravilla


EHS in Charge

PROJECT NEW SENATE BUILDING


Taguig City

SUBJECT : Work Access

Sir/Ma’am,

Good day! I would like to inform your good office and request for your consideration on the additional
manpower of Xander Construction who will work at rebar works for two weeks without medical
requirements

1. Eduardo Hallasgo
2. Melvin Gumboc
3. Jayson Grantes
4. Perlito Magdaong
5. Ronald Gerante
6. Adonis Tiozon
7. Noli Nasinopa
8. Rolly Del Abanda
9. Andrew Abanil

I am looking forward for your kind consideration regarding this matter.

Thank you very much.

Yours truly,

Geralyn Baliguat
Owner - Xander Construction

Noted by:

Engr. Gilbeys Cabral


Construction Manager North Tower

Engr. Edgar S. Tullao


Project Manager

Date : December 4, 2021

TO : PAYROLL DEPARTMENT
CC : MR. ISMAEL REPOLLO
Project Time Keeper

PROJECT THE DESIGN AND BUILD CONTRACT FOR THE CONSTRUCTION OF


THE NEW SENATE BUILDING
Navy Village, Taguig City

SUBJECT : STRAIGHT TIME

Sir/Ma’am,

Good day! I would like to inform your good office and request for your consideration on the straight time work at Concrete
Pouring of North Tower Second Floor Fire Exit Stairs of the following ADMIN workers Below are the list of manpower:

1. Sally Ogale
2. Aquilino Cabreros
3. Gilbert Abalos
4. Christian Cabreros
5. Deo Duran
6. Ramond Mayugba
7. Bernabe Labaniego

I am looking forward for your kind consideration regarding this matter.

Thank you very much.

Yours truly,

Dannielle Cortez
Construction Superintendent

Noted by:

Engr. Gilbeys Cabral


Construction Manager

Engr. Edgar Tullao


Project Manager

Date April 2, 2022

TO : PAYROLL DEPARTMENT

CC : MR. BENHUR RUBIN


Project Time Keeper
PROJECT THE DESIGN AND BUILD CONTRACT FOR THE CONSTRUCTION OF
THE NEW SENATE BUILDING
Navy Village, Taguig City

SUBJECT : STRAIGHT TIME

Sir/Ma’am,

Good day! I would like to inform your good office and request for your consideration on the straight time work of the
following line and grade aid who complete the layout punch listed by the DPWH inspector at Ground Floor Slab North
Tower, April 2, 2022 from 11:30 a.m. to 02:00p.m. Below are the list of the line and grade aid:

1) Orbon, Cesar 6) Peleno, Marvin


2) Maulas, Joan 7) Salvo, Melvin
3) Premalon, Leo 8) Rubio, Romeo
4) Abello, Bernie
5) Rivera, Jerwin

I am looking forward for your kind consideration regarding this matter.

Thank you very much.

Yours truly,

Engr. Glenn Frey Layug


Construction Superintendent

Noted by:

Engr. Julius Roldan Engr. Edgar Tullao


Construction Manager Project Manager

Date : April 2, 2022

TO : PAYROLL DEPARTMENT

CC : MR. BENHUR RUBIN


Project Time Keeper

PROJECT THE DESIGN AND BUILD CONTRACT FOR THE CONSTRUCTION OF


THE NEW SENATE BUILDING
Navy Village, Taguig City

SUBJECT : STRAIGHT TIME


Sir/Ma’am,

Good day! I would like to inform your good office and request for your consideration for my, Nichole Dannielle Cortez – CS
REBAR of North Tower, straight time last March 26, 2022 from 11:30am to 2:00pm this is due to Monitoring of
Rectification of Punchlist of Rebar Installed at Block 9 and 10 Ground Floor Slab

I am looking forward for your kind consideration regarding this matter.

Thank you very much.

Yours truly

Dannielle Cortez
Construction Superintendent

Noted by:

Engr. Gilbeys Cabral Engr. Edgar Tullao


Construction Manager Project Manager

Date : February 8, 2020

TO : PAYROLL DEPARTMENT

CC : MR. ISMAEL REPOLLO


Time Keeper Head

PROJECT THE DESIGN AND BUILD CONTRACT FOR THE CONSTRUCTION OF


THE NEW SENATE BUILDING
Navy Village, Taguig City

SUBJECT : Straight Time

Sir/Ma’am,
Good day! I would like to inform your good office and request for your consideration for my straight time last February 7,
2020 from 5:00pm-6:00pm this is due to the preparation of the area for rebar inspection in preparation for concrete pouring
of North Tower Mat Foundation.

I am looking forward for your kind consideration regarding this matter.

Thank you very much.

Yours truly,

Benarch Frias
Construction Superintendent

Noted by:

Engr. Gilbeys Cabral Engr. Edgar Tullao


Construction Manager Project Manager

Date : July 7, 2020

TO : PAYROLL DEPARTMENT

CC : MR. ISMAEL REPOLLO


Time Keeper Head

PROJECT NEW SENATE BUILDING


Taguig City

SUBJECT : STRAIGHT TIME

Sir/Ma’am,
Good day! I would like to inform your good office and request for your consideration on the straight time work
of the following Admin Workers listed below from 12:00 m.n. to 5:00 a.m. for the scheduled concrete pouring
of basemen 2 slab, July 6, 2019.
- SEBASTIAN SOBRERA
- REVELANDO MATOTE
- ROLLY GABRERA
- RAFFY GABRERA

I am looking forward for your kind consideration regarding this matter.

Thank you very much.

Yours truly,

Engr. ND Cortez
Construction Superintendent

Noted by:

Engr. Gilbeys Cabral


Construction Manager

Engr. Angelito Ollieres


Project Manager

Date : November 12, 2021

TO : MR. ISMAEL REPOLLO


Project Time Keeper

PROJECT NEW SENATE BUILDING


Taguig City

SUBJECT : STRAIGHT TIME

Sir,

Good day! I would like to inform your good office and request for your consideration on the straight time work
of the following Admin Workers listed below last November 06, 2021 from 5:00 p.m. to 6:00 p.m. for the
scheduled concrete pouring of South Tower Retaining Wall (GL A’/6-11).

1. MARLON ABARQUEZ
2. SLAUGHTER DUMALI
3. JELLY REQUINALA
4. LIBO-OH JOSEPH JR.
5. JEFFREY REONAL
6. RAYMOND JUMAQUIO
7. JERIC CARULLIO
8. LEO REQUINALA
9. JULIO ALPITCHE

I am looking forward for your kind consideration regarding this matter.

Thank you very much.

Yours truly,

JERANIE SIMBULAN
Construction Superintendent

Noted by:

Engr. Gilbeys Cabral


Construction Manager

Engr. Edgar Tullao


Project Manager

Date : October 22, 2021

TO : PAYROLL DEPARTMENT

CC : MR. ISMAEL REPOLLO


Project Time Keeper

PROJECT NEW SENATE BUILDING


Taguig City

SUBJECT : STRAIGHT TIME

Sir,

Good day! I would like to inform your good office and request for your consideration on the straight time work
of the following Admin Workers listed below last Ocober 21, 2021 from 5:00 p.m. to 6:00 p.m. for the
scheduled concrete pouring of South Tower Slab (GL F-G/4-6).

1. MARLON ABARQUEZ
2. SLAUGHTER DUMALI
3. MANUEL DELA CRUZ
4. JEFFREY REONAL
5. LEO REQUINALA
6. JELLY REQUINALA
7. JULIO ALPITCHE
8. JERIC CARULLO

I am looking forward for your kind consideration regarding this matter.

Thank you very much.

Yours truly,

Benarch Frias
Construction Superintendent

Noted by:

Engr. Gilbeys Cabral


Construction Manager

Engr. Edgar Tullao