0% found this document useful (0 votes)
141 views4 pages

(Project Name) Estimation Workbook v1.04

This document contains templates and instructions for estimating project efforts, resources, and work products. It includes sections for documenting assumptions, creating a work breakdown structure (WBS) with estimated efforts for each task, and estimating work products and module sizes with related efforts. The purpose is to estimate all components of a project for planning and management.

Uploaded by

madan1981
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
141 views4 pages

(Project Name) Estimation Workbook v1.04

This document contains templates and instructions for estimating project efforts, resources, and work products. It includes sections for documenting assumptions, creating a work breakdown structure (WBS) with estimated efforts for each task, and estimating work products and module sizes with related efforts. The purpose is to estimate all components of a project for planning and management.

Uploaded by

madan1981
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

Assumptions Sheet:

This sheet contains all assumptions made during estimation of effort.


Assumptions are made when estimating on the following components of the project:
- Effort/schedule
- Financial
- Resources (staff, Hardware and Software)
-Scope/Requirements

Effort Estimation:
To fill this up do the following:
1. Create a WBS (Work Breakdown Structure)
The WBS should contain ALL activities that will be done in the project. Decision-Making Activities, Review Activities
should be included
2. Define the estimated effort for each task. For the technical solution part of the WBS or the SDLC, the estimated effort should
be based on the Estimation Model that is defined for the project

Work Product & Product Size Estimation:


To fill up do the following:
1. For section 1, fill up the author name and efforts for each work product that is applicable. There are some work product that
is being default in the section. If any of the work product is not applicable to the project, please put n/a on all the field. Fill up
any other work product that is not listed in the list.
2. For section 2, fill up the Main Modules, Sub-Modules and efforts identified In the project.

Quality Assurance Department


IPOWER-PM-T-047-v2.0.0 Page 1 of 4
Estimation Workbook
Version 1.0
Released September, 2005
Project Name : <Project Name>
Date : <date of estimation>
Version No. : <version # of worksheet>
Author : <author of this worksheet>
Description of Change : <description of changes in this worksheet>

Ref. No. Description


SCHEDULE/EFFORT
1

RESOURCES (e.g. STAFF, HARDWARE, SOFTWARE)

SCOPE/REQUIREMENTS

LEGAL/CONTRACTS

SOLUTION/TECHNOLOGY

Quality Assurance Department


IPOWER-PM-T-047-v2.0.0 Page 2 of 4
Estimation Workbook
Version 1.0
Released September, 2005
Project Name : <Project Name> Date : <date of estimation>
Working Hours per Day : 8 Ver. No. : <version # of worksheet>
Productive Hours per Day : 7.00 Author : <author of this worksheet>
Description of Change : <description of changes in this worksheet>

Work Breakdown Structure Effort Effort Workdays


(Man-days) (Man-hours) (Man-days)

Initiate Plan Stage 3.75 30 4.50


Prepare Project Management Plan (PMP) 2.00 16 2.50
Review PMP 0 0.00
Prepare Individual Project Objectives 0 0.00
Prepare Project Activation Workshop (PAW) Materials 0 0.00
Review PAW Materials 0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
Project Management Controls 0 0.00
Weekly Status Review & Tracking 0 0.00
Monthly Status Review & Tracking 0 0.00
<Software Development Life Cycle WBS> 0 0.00
0 0.00
0 0.00
0 0.00

0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
TOTAL : 5.75 46 7.00
End of Estimation

Quality Assurance Department


IPOWER-PM-T-047-v2.0.0 Page 3 of 4
Estimation Workbook
Version 1.0
Released September, 2005
List of work product that will be prepared for <project name>

Work product Author Effort Effort:


User Requirements Specification 1 day
System Design Specifications 2 days
User Manual 5 days
Test Case
Test Plan
Project Schedule
Project Plan
Risk Management Log
CM Plan
Metrics Plan & Objectives and Measures
PPQA Plan
<others>

Work product estimation for <project name>

Main Module Sub-Module Effort Effort:


<Main Module 1> <Sub-Module 1> <mandays> 3 mandays
<Sub-Module 2> <mandays> 5 mandays
<Main Module 2> <Sub-Module 1> <mandays>
<Sub-Module 2> <mandays>