PERFORMANCE EVALUATION

OHS-PR-09-25-F04 (I) AUDIT PLAN

AUDIT ITINERARY
Project Name: Construction of 132Kv (8358 SS&L), Misk city.

Contract No.: PTS-20CN190

Contractor Name: Al-Babtain

Location: Project Site & Office

Applicable Standards / Criteria: SEC New OHSMS Standards, Protocol and


Procedure.

Type of Audit: Self - Audit

Audit Date: 12 – 13, June 2022.

Audit Team:

Team Leader: Engr. Muhammad Arslan Ahsan

Member:

Date / Time Process Auditor Auditee

June 12, 2022 Day 1

0700H - 0730H Opening Meeting & Eng. Muhammad Arslan Project Manager

OHS Forms  Procedure Reference Revision Number Revision Date Approved By

Audit Plan OHS-PR-09-25-F04 (I) 0 MAY 2021 OHSMS


PERFORMANCE EVALUATION
OHS-PR-09-25-F04 (I) AUDIT PLAN

Introduction Ahsan Site Manager


Safety Personnel

0730H - 1030H Site Visit / Inspection Eng. Muhammad Arslan Site Manager
Ahsan Site Engineer
Safety Personnel
Site Foreman
Workers

1030H - 1200H Offices, storage area and Eng. Muhammad Arslan Storekeeper
laydown yard inspection Ahsan Nurse
Office Staff
Workers
Safety personnel

1200H - 1300H Lunch Break

1300H - 1700H Documents Review and Eng. Muhammad Arslan Document Controller
Audit (OSH Procedure 1- Ahsan Safety Personnel
10)

June 13, 2022 Day 2

0730H - 1200H Documents Review and Eng. Muhammad Arslan Document Controller
Audit (OSH Procedure 11- Ahsan Safety Personnel
21)

1200H - 1300H Lunch Break

1300H – 1430H Documents Review and Eng. Muhammad Arslan Document Controller
Audit (OSH Procedure 22- Ahsan Safety Personnel
26)

1430H - 1500H Closing Meeting & Initial Eng. Muhammad Arslan Project Manager
Audit Result Ahsan Site Manager
Safety Personnel

OHS Forms  Procedure Reference Revision Number Revision Date Approved By

Audit Plan OHS-PR-09-25-F04 (I) 0 MAY 2021 OHSMS