Boq 6.7M
Boq 6.7M
Boq 6.7M
SUMMARY
I. GENERAL REQUIREMENTS 200,000.00
II. SITE PREPARATION 75,000.00
III. STRUCTURAL WORKS 2,357,500.00
IV. ARCHITECTURAL WORKS 1,055,800.00
V. ELECTRICAL WORKS 450,340.50
VI. PLUMBING WRKS 263,400.00
VII. PAINTING WORKS 758,482.20
VIII. TINSMITHRY WORKS 759,555.75
IX. MISCELLANEOUS WORKS 215,895.00