SAP MM Transaction Code List
SAP MM Transaction Code List
Material Master
Vendor Master
Source List
Purchase Requisition
Quotations
Purchase Order
Reservation
Inventory Count
sapeducation.atos.net
OPEN
SAP Training by Atos
ME2C- Display Purchase Orders by Material Group
CL02 - Classes
SAP Endorsed
Open
Apps for HXM
SAP Store
Comments
03 Apr 2008 11:36 am paddhu
hi,
Can Please send how to work on CIN in MM one by one step wise settings with screen shots if possible.
Thanks in advance
padmaraju
how transfer the stock from one site to another site,i want know the transaction,
regds,
Thani
When Purchase Order text is changed with MM02, how can we see the old Purchase Order text for history
reasons?
Thank you,
mcmahont
How can I find GR NO. and tax information related to the same GR in a single transaction. Please its
1.How can I find GR NO. and tax information related to the same GR in a single transaction. Please its
needed. Your help required.
2.When Purchase Order text is changed with MM02, how can we see the old Purchase Order text for history
reasons?
3.how transfer the stock from one site to another site,i want know the transaction/
4.how to work on CIN in MM one by one step wise settings with screen shots if possible.
regards,
Owaise
Sir,
Which transaction code is used for findout the Opening balnace of Materials Receipts for the month and
Consumption for the month and closing Balance of the Particualr month.It should give
Rawmaterial wise Monthly Receipts consumption Abstract with Opening Balance and Month end closing
Balance.
Hi
2.How to inter change a Bin which is picked for delivery in Transfer Order (pick list) without creating a new
Transfer Order.
Regards
Fazal
Hi,
do you know how/what should i set up in MM for not having materials entering without inspection lot being
created for it? I have several materials created somehow, entering into my plant without MM screen been
mantained and this material is sent into unrestricted stock.
Thanks a lot
Hi,
do you know a method/transaction which shows the materials shown in MB51 but not shown in QA33? For
the moment i have only an empiric method of downloading QA33 and MB51 entries into an excell file and
from now on... manual work :-)
Thanks a lot,
Adrian
S.kamal
9841068510
Hi,
Can SAP allow for one location within a plant to have stock reservations while another location within that
same plant that does not reserve stock ?? I need that as certain orders have a longer leadtime (like export
Hello,
Could you please mail me handbooks for F3 Problem Reporting and Q2 Quality Reporting?
Also, how can I print out Delivery Schedules manually from SAP?
Thanks in advance!
Best Regards,
Rithik
thnx
Diesh k Yadav
hi,
Mohan
HOW EDIT FIELD SETTING OF ME21N T-CODES,IF ANYONE KNOW PLS SEND ME ON
[email protected].
Hi there,
Could anybody help me in indicating the tcode for showing the value in accounting for the stock of one
material at a certain date or the value of the used stocks during a selected period of time?...
Kind regards,
Mihaela Anca.
HELLOW
can you please send any PDF book of SAP customizing "purchasing"
also in the report ME2K the field 'netwr' shows the value 0-zero , anyone knows if there is a released note
on the problem ??
thnx
didi
I am Raju and i have started a course of sap mm. i am going to buy a laptop.so i want to know minimum
system configuration for installing this.
email : [email protected]
Dear Sir I am working In Sap MM as End user It is beneficial for me to do a course of SAP MM as
aconsultant. Pl tell
can you tell me the difference between end user and end to end implementation
09 Mar 2013 6:45 am Muhammad Ali Mushtaq
Hello All I am Muhammad Ali Mushtaq and I am Very Intrested in SAP Training, I am Specialy Interested in
Ware House System Under the (WHM) Technology, Under SAP SCM (Supply Chain Management)I want a
Learn This One Technology, With SAP Compelet Guides Step By Steps and EAsy Steps.
My Question is Here.
1:How many Can I Start Step on WHM Under SCM with SAP?
how to take report of new material code generated for perticular period (ex 1wwek/2week/1 month) along
with time of generation of the material code
Recommended Posts:
agilemania.com
OPEN
Professional Scrum Master