ROOT CAUSE ANALYSIS OF INLET HOLE AND LEAK OFF HOLE OPERATION
MISSING PROBLEM IN CRI BODY USING SHAININ APPROACH 1 ROOT CAUSE
ANALYSIS OF INLET HOLE AND LEAK OFF HOLE OPERATION MIS...
CITATIONS READS
0 1,085
3 authors, including:
Some of the authors of this publication are also working on these related projects:
All content following this page was uploaded by Shashank Pansari on 25 September 2017.
Abstract: The two major challenges that industries are facing today are continuous improvement in productivity and quality
of the product. Bosch Production System (BPS) is one of the leading manufacturers in Diesel system equipment’s. Fuel
Injector is main product of Bosch India Nashik. This plant produce around 10,000 injector per day. They are having mass
production, it may happen that in such mass production their might be some part with operation missing. Such operation
missing parts contribute a lot in defect cost. There are two holes in injector body inlet hole and leak off hole with dia. 2.2 mm
and 1.43 mm. This holes are gun-drilled into the forged body. Many times it is observed that drilling operation is half done,
there might be many root causes like drill breakage, drill blunt, interruption in machine due to coolant level low etc. there was
need of finding dominant root cause and eliminate it. Bosch Production System (BPS) - one of the leading manufacturers in
Diesel system equipment’s, has been successfully employing the efficient statistical tool ‘Shainin’ for the root cause
identification and Design of Experiments (DOE) techniques for analysis and optimization of the quality related issues. Shainin
is popular being a simplest and effective tool to employ in solving the manufacturing related problems. So it was decided to
go with Shainin and find the dominant root cause. Shainin® system could be effectively used for solving the problems with
the theory that “there is a dominant cause of variation in the process output that defines the problem” and it is analogous to
Pareto principle of ‘vital few and trivial many’ or ‘20/80 principle’. The categorization of the problem done in order to choose
the best effective techniques such as Component search, Paired comparison, Concentration chart, Strategy diagram etc.
Classification of the problem that is GreenY (as termed in Shainin® system) is done as Property, Profile, Defect or Event.
Event subcategorized as destructive or malfunction event.
1. INTRODUCTION
2.2 Approach
2.2 Converge
Converging towards the RedX causing the GreenY
Fig.5. Isoplot
has been achieved by Component search technique.
The solution tree for the GreenY to determine the
RedX. Discrimination ratio is greater than 6 hence we can
eliminate potential root cause in measurement. If we
look towards approach, there is large contrast in Time
to Time for same machine and also machine to
machine in same plant
3
ROOT CAUSE ANALYSIS OF INLET HOLE AND LEAK OFF HOLE OPERATION MISSING PROBLEM IN CRI BODY USING SHAININ APPROACH
3.1. Test
All the process parameters and machine
parameters were checked and machine was run. It was
seen that If there is no interruption no operation
missing parts are produced.
CONCLUSIONS