Control Room Risk Assessment 3 1
Control Room Risk Assessment 3 1
Control Room Risk Assessment 3 1
PRODUCTION COMPANY
ACTIVITY Filming
DATE TIME
START FILMING 10/5/22 10am
HAZARDS
1 Audience or Public Safety X
2 Cables X
3 Camera Cranes / Dolly / Slider / Drones
4 Covid - 19 X
5 Derelict Buildings
6 Electricity
7 Fire - Flammable materials etc
8 Hazardous Terrain - Slipping / Tripping / Falling
9 Noise / Sound levels
10 Medical Conditions – Allergies / Health problems etc
11 Physical Exertion
12 Public Transport X
13 Stunts / Dangerous activities
14 Theft of Equipment
15 Weapons – Prop Guns / Knives / Swords etc
16 Weather Conditions - Hot / Cold / Rainy / Windy / Snow etc
17 Working with Animals
18 Working with Children
19 Working with Disabled / Elderly
20 Working at Night
21 Working on or near Water
22 Vehicle safety
22 Other -
PRODUCTION RISK ASSESSMENT Sheet 1 of 2
Public Transport Producer and Actors L Ensuring we are safe when Costa
taking public transport
I have read the above and I am happy that:
Signed:
Producer
Date:
Signed:
Tutor or Technician