Telescopic Tiltable Movable Lighting Tower
Dear Customer,
We request you to read his manual and follow carefully the information on
installation and adjustment so that you may enjoy many years of dependable
Yours,
INDEX
1.
2. PRODUCT INFORMATION DATA
The Telescopic & Tiltable Moveable Lighting Tower having height 9 mtr.
Consist of following main parts:
1. TROLLEY
2. TOWER
The tower is made of 2/3/4 numbers of M.S pipes having square shape
and sections, which are hinged with each other. The tower telescopic
and tilting action can be done with the help of winch. First it should be
brought to vertical position and then telescoped up to its maximum
permissible height i.e. 9 mtr
3. WINCH
2.
4. LUMINAIRE
The lamp is easily replaceable from rear end, thus preventing soiling of
reflectors
and disturbance of optical axis. The luminaire can be set at any desired
angle, with a yellow passivated M.S. cradle.
OR
The luminaire is provided with aluminum reflector cum body.
3.
5. CONTROL PANEL:
6. D.G. SET:
Engine Specification:
Model: 15LD440
Cylinder: 1 No
Power: 10 BlIP
RPM: 3000
Warning:
Spare Parts:
to ADICO branch office (find Branch office list with this manual).
OR
Email ID:[email protected]
4.
3. INSTALLATION & COMMISSIONING
ERECTION
• Pull out all Riggers and lock it by locking pin and Release all Jackscrews
to Ground which are provided for leveling the trolley. Please ensure the
level base with the help of Sprit Level.
• Check all nut bolts, (winches, tower hinge, shaft lock nut and bolt, D. G.
Set mounting bolts, wire rope, clamps - bolts of tilting and telescoping
wire ropes, panel mounting bolt) and tighten them.
• Fix the luminaire post (to the top truss now in horizontal position) the
hardware and spanner is provided in the toolbox.
• Fix the luminaires with lamp on to the luminaire post. Keep the
luminaires at desired angles.
• Connect the provided wires to the terminal block provided in the terminal
box.
• Check the alignment of D.G. Set and Bolts and Nuts of Coupling should
be tightened.
• Fill diesel in the diesel tank. Check the lubricant oil level in the engine
, (Oil is already filled in the engine. However, if required please top it up
with multi grade engine oil as recommended by engine manufacture).
5.
4.0PERATION
• Start the engine with the key provided. The engine starting is electrical.
Alternatively it can be started manually also with the help of cranking
handle (in tool box).
• After the engine catches the desired 'speed & check voltage. If voltage is
less or more than 230 V, check engine speed.
• Release tower telescopic lock provided on top truss, Raise the tower to
vertical position by handle. Lock the tower in vertical position with the
locking pin.
• Raise the top truss to its position indicated by blue-red strip.
• Come back to control panel and Switch on the MCB. After that switch on
one by one all lamps by MCB.
• With the final steps above you have installed and commissioned the
movable tower.
• Shut off the D. G. Set or main supply.
• Switch 'Off the light with 'OFF' control switch.
• Down the telescopic mast. Remove the vertical position lock pin. Tilt the
mast to horizontal position.
• Push all riggers inside & Release all the jackscrews to up side.
VERY IMPORTANT!
• Telescope down the tower.
• Tilt the tower to horizontal resting position
• Lock the tower in horizontal position.
• Release all jackscrews to ground.
• Tow the trolley from front side with the help of towing hook provided.
6.
5. EQUIPMENT MAINTENANCE
~ ROUTINE MAINTENANCE
TOWER MAINTENANCE
• Tower hanging shaft fixed at column post to be checked and ensure that
is tight.
• Telescopic winch nut bolt and wire rope mounting bolt should be
checked and ensure that it is tight.
• Grease the winches after every 15 days.
• Telescopic pulley mounted on the top section should be checked every
time before operation.
• Luminaire post and luminaries nut bolt should be checked and tightened
at least once in a month.
• Terminal box, nut bolts and cable connections should be checked once in
a fortnight.
TROLLEY MAINTENANCE
Please Check
• Disc nut bolt of tyre wheel should be tight.
• Door hinges of the trolley to be checked.
JACK SCREW MAINTENANCE
7.
PLEASE NOTE!! !
8.
6. Do & Don't
Do
• After erection tighten all nut bolts. Check the locking, split pins
etc. and fix them.
• Check the grease in all pulleys.
• Check wiring/cable termination in Junction Box on luminaire
post as well as incoming and outgoing of MLCP. Tighten the
connections.
• Tighten the jacks of trolley, which will make the Tyres free
from ground.
• Tighten nut bolts of ant vibrating pads and coupling every time
before starting the DG. Set.
• Check oil/diesel levels before starting DG. Set.
• While towing the trolley, release the all jackscrews to top
position giving maximum distance from ground.
• While towing remove the luminaire post if possible. Otherwise
tighten the bolts of the luminaire.
• Use special spanner provided for the Tyre bolts.
Don't
• Do not tilt the mast in fully erected condition (when the tower
is in 9 mtrs, heights). First bring the mast down by telescopic
winch then tilt the assembly parallel to ground level by tilting
winch.
• Do not release the Jackscrews to upside during erection.
9.
IT.NO DESCRIPTION
~J
I TOWER SECTION
rnr
¥v..
Z
3
D.G.SET
TROLLEY
i II , ..~
4 COLUHN POST
I 5 RESTING POST
I I 6 RIGGER BOX
I I
I I 7 HUDGUARD
I I
I I 8 LEAF SPRING
I I
9 TYRE
~LtI
10 BooH
11 TOWING HOOK
-11
I
0 12 JACK SCREW
If)
I CO
I ~I ~
13 LUHINAIRE POST
-~.
I 14 LUHINAIRE
I
I I 15 TELESCOPIC WINCH
~
I : 16 TILTING WINCH
• I-f)
o
~ II
I
I
1560 ~I ]lJ==! CIT 17
18
BODY
AIRVENTILATION
13
I 19 DG EXHAUSTER
I
~
I
X
o
(k t"1I
0...
0... I 3360
« t 3600 ROTATABLE
~
o
o
o
,
I
I
FRONT SIDE VIEW (FULL EXTENDED POSmON)
C!' I
I
\
I
I
I DIMENSION:
I
:1
I DESCRIPTION COMPRESSED EXTANDED
(MIN.) (MAX.)
LENGTH 4750 4750
LJ I WIDTH 1560 3360
HEIGHT 1850 9000
o
If)
co DGN BY
DATE I NAME
DRN BY 119.11.07ILR
CKD BY 120.11.07·
"sk" SAFETY DEVICES.
C-19120,DEVBOOHMIINDUSTRIAL ESTATE, ROORKEE
-+
APPD BY·
GENERAL ARRANGEMENT 100
4750
EJ DRG.NO.ASD/D/SOJ \REV NO
THIRD ANGLE PROJECTION SHEET NO. 01 OF 01 I MOVABLE LIGHTING TOWER- 9Mtr (LOM)
SIDE ELEVATION (FULL EXTENDED & TILTING pOSmON)
ALL DIMENSION ARE IN MMI SCALE NTS
ASDIMLT/07/JC
Model · .
Equipment No. ·
• II •
Engine No. · .
Alternator No ·
• •••••• II .
12
Consumable Spare Part List for Lornbardlnl Engine (LD 440) for the Aska Make Mobile Lighting Tower
Qty.
Recomme
S.No. Part No. Part Name nded
The above consumable parts are to be procured for day to day maintenance and can be purchased in six
sets for the periodic maintenance from below locations
Website www.askagroup.com
EmaiIID.suDDort(a)askaarOUD.com
GORAKHPUR MIS. ADICO SPARES PVT. LTO, Nr. SIRAJ CLINIC, 0661· 3091391
2 12610612004 PURDILPUR, GOLGHAR, GORAKHPUR
MARKETING OFFICE
DEHRADUN MIS. ADICO SPARES PVT. LTO JAY COMMERCIAL 0136·6464444 06001136896 l.N.Srivastava
02106106 COMPLEX, TYAGI ROAD, DEHRADOON (UTN) 09360262224
DEPOT
KOlKATTA MIS. ADICO SPARES PVT. LTD, 2/1/1B, STRAND ROAD, 1ST 033·30222231, 19490720027 19490720221 [email protected] Alok Maitra
0110412002 FLOOR, KOLKATTA-700 001 (W.B.) DEPOT 09331066963
GAUHATI MIS. ADICO SPARES PVT. LTD., C/O. SRI RAM MARKET, 2ND 9864036989 0361·118670000019 GWDICSTI0041 [email protected] IShewli Bose
6 10110812003 FLOOR, CHATRIBARI ROAD GAUHATI-781 001 DEPOT 2608441
PATNA MIS. ADICOSPARESPVT.LTD, VIDYANILAY,BENI 0612·3298471 10122140024 10122140121 [email protected] Rajeev Ranjan
7 10110212004 DEPOT 09334113869
BAGICHA,RAJENDRA PATH.TELEEXA..PATANA.
RANCH' MIS. ADiCO SPARES PVT. LTD., BUIYA TOll, B. T. ROAD, 0661·2211280, 20590200141 [email protected] IPyarelal Pandey
8 11910112004 GARIKHANA RANCHI-834 001. DEPOT 09334436736
RAIPUR MIS. ADICO SPARES PVT. LTO., 14/1394, BAMBLESHWARI 0771·6039096 22191201174 aspr [email protected]
2110712003 MARKET, STATION ROAD, Nr. DESH BANDHU SCHOOL, 09329101676
9 DEPOT
RAIPUR-492 009 (C.G.)
INDORE MIS. ADICO SPARES PVT. LTD., to-e, SHALIMAR PLAZA, 0731·2361604 23620601994 1·7·2003 [email protected] Sanjay Bajpayee
10 ,03/0812001 12-JAWAHAR MARG, Nr. PATEL BRIDGE CORNER, INDORE (M.P.) DEPOT 09302106309
COIMBATORE MIS. ADICO SPARES PVT. LTD., MUBARAK COMPLEX, 124-G, 0422·2230196, 33782142441 [email protected] I Navin Kumar
14 11910412004 RANGA KONAR STREET, KATTOR. COIMBATORE- 641 009 DEPOT 09344832868
16 I HUBll MIS. ADICO SPARES PVT. LTD PUJARI BUILDING, SHOP NO. 04, 0836·2363616, 29160236688 S.S.Ghooli
0710712004 NEELIGIN ROAD, NEW COTTON MARKET, HUBLI-580 029 DEPOT 09343107243 [email protected]
16 ITHRISSUR ADICO SPARES PVT. LTD., 7, LAMEXARCADE, 0487-2423437 32080748804 Miss. Manju
24/09/2004 POST OFFICE ROAD, THRISSUR DEPOT [email protected]
17 !CHENNAI MIS. ADICO SPARES PVT. LTD., SHOP NO.-46/22, SRINVASA 044-4660622066162676
01.11.2004 READY STREET, T-NAGAR, CHENNAI [email protected]
~
M 16.06.06
MANSION, LEELAMAHAJN, VISAKHAPATNAM - 530 020 MARKETING OFFICE
22 jSURAT M/S.ADICO SPARES PVT. LTD. J-G 0261·2452248 24091100075 1·7·2002 Bhaskarbhai
14/07/05 66, JAPAN MARKET, NEAR BELGIUM SQUARE,RING ROAD, SURAT - 395 DEPOT
002.