The document discusses providing support structure details for a new bus duct installation. It notes that the support structure is not clearly mentioned in section A-A and asks to provide an updated section view showing the new structure raised above the new duct. It also requests to ensure at least 1.5m clearance from the road level while considering the supporting span and to mark support column locations clearly in section C-C.

Uploaded by

Senthilkumar K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
198 views1 page

30.04 (L&T Reply)

The document discusses providing support structure details for a new bus duct installation. It notes that the support structure is not clearly mentioned in section A-A and asks to provide an updated section view showing the new structure raised above the new duct. It also requests to ensure at least 1.5m clearance from the road level while considering the supporting span and to mark support column locations clearly in section C-C.

Uploaded by

Senthilkumar K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Mention clearly

the scope of
support structure
for Bus duct.

Please refer to section B-B.


1)The self-standing structure will be
structure for new installed between existing LCC's by
bus duct not clearly anchor set.
provide the section
mentioned in 2)Ring-type support will be installed
section A-A on existing GIB in 2no.s of points.
L&T Reply:Noted. can you plz
L&T Reply: updated those details in Section A-
Bus duct support is please provide A . New Structure has to be raised
very near to road. the section view till the new duct.
try to provide more
than 1.2 m from
road level. try to
keep 1.5m
Considering span of supporting,
Noted. only 400mm is shifted to downward.
Hence, 1215mm could be ensured.

Noted. try to keep column


1.5m from the road
Considering span of supporting, only
400mm is shifted to downward.
Too much indication of every Hence, 1215mm could be ensured.
structure could make the Please consider that we have
poor visibility. it is sufficient. ensured the sufficisent clearance
anyhow, every embedded from road. Too much clearance could
plate will have its single connection is It is Ring-type support, not fixed make another problem by increasing
structure menber. not clear type. you could get the detail in the span of supporting points
kinldy provide shared Autocad file.
kindly mark clearly blow out and
in section-C-C how L&T Reply:Noted.
provide
many column in the separately.
location