This document provides details of the construction of a handball court situated at Bhagat Singh College in Jaora, Ratlam district, including a bill of quantities. It lists 6 line items with specifications and quantities for works like clearing jungle, earth excavation, soil filling, cement concrete work, supplying and fixing angle iron posts and struts, and supplying welded steel wire fabric. The total estimated cost for all items is Rs. 344,953.1 or approximately Rs. 345,000.
This document provides details of the construction of a handball court situated at Bhagat Singh College in Jaora, Ratlam district, including a bill of quantities. It lists 6 line items with specifications and quantities for works like clearing jungle, earth excavation, soil filling, cement concrete work, supplying and fixing angle iron posts and struts, and supplying welded steel wire fabric. The total estimated cost for all items is Rs. 344,953.1 or approximately Rs. 345,000.
This document provides details of the construction of a handball court situated at Bhagat Singh College in Jaora, Ratlam district, including a bill of quantities. It lists 6 line items with specifications and quantities for works like clearing jungle, earth excavation, soil filling, cement concrete work, supplying and fixing angle iron posts and struts, and supplying welded steel wire fabric. The total estimated cost for all items is Rs. 344,953.1 or approximately Rs. 345,000.
This document provides details of the construction of a handball court situated at Bhagat Singh College in Jaora, Ratlam district, including a bill of quantities. It lists 6 line items with specifications and quantities for works like clearing jungle, earth excavation, soil filling, cement concrete work, supplying and fixing angle iron posts and struts, and supplying welded steel wire fabric. The total estimated cost for all items is Rs. 344,953.1 or approximately Rs. 345,000.
Handball Court Situated At Bhagat Singh College Jaora, Dist.
Ratlam
S.No. Perticulars No L B D Qty Unit Rate Amount
2.2 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings 1 of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. 1 40 20 800 Sqm 4.14 3312
2.6 Earth work in excavation by mechanical
means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including dressing of sides 2 and ramming of bottom disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. (No extra lift is payable if work is done by mechanical means) All kinds of soil Col. 1 40.00 20.00 0.30 240.000 40 0.40 0.40 0.45 2.880
Total 242.880 Cum 129.00 31332
2.27.2 Supplying and filling in plinth under floors including watering ramming consolidating in layers not exceeding 20cm in depth and dressing complete. Supplying and filing in plinth with soil(other then 3 BC soil ) having MDD notless than 1.85 t/m3 under floorsincluding watering, ramming andcompacting (minimum compaction 95%of MDD)in layers not exceeding 15cmdepth and dressing complete. Col. 1 40.00 20.00 0.40 320.000 Total 320.000 Cum 250.00 80000
4.1.2.2 Providing and laying in position cement
concrete of specified grade excluding the cost of 4 centering and shuttering - All work upto plinth level : M-10 Nominal (Mix -1 Cement : 3 sand : 6 graded stone aggregate) 40 0.40 0.40 0.50 3.200 Cum 3808.00 12186 10.29.2 Angle iron post and strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length 5 and drilling holes upto 10 mm dia. etc. complete. (cost of earth work in excavation and concrete work in foundation to be paid separately)
40 3.40 4.5kg/mtr 612.000 Kg 67.00 41004
S.No. Perticulars No L B D Qty Unit Rate Amount 10.29.3Supplying at site -Welded steel wire fabric of required width having rectangular mesh 6 painted with two or more coats of enamel paint of approved shade over a coat of primer (Priming painting to be paid for separately).
2 40.00 3.00 240.000
2 20.00 3.00 120.000 Total 360.000 6Kg/Sqm x 360.00 2160.000 Kg 82.00 177120 Total 344953.1 Say