Annexure 8 - Scope Split
Annexure 8 - Scope Split
Annexure 8 - Scope Split
Flexible Nozzle
Hydraulic power
pack
Hydraulic cylinders
Hydraulic power
Locating pins pack
Slotted walls
Slotted wall insert Schlieren /optical
access
Project : ISRO- 1.2m Trisonic Blow Down Wind Tunnel - BDWT
EPC Contractor : Tata Projects Limited
Client : Indian Space Research Organization
Engineering scope Matrix
Porous walls
Porous wall insert
Schlieren /optical
access
Model Cart Pressure shell Locating pins
Transport system
Hydraulic cylinders
Model Cart Pressure shell Locating pins
Transport system
Hydraulic power
pack
Bogies
Sting
Commissioning Equipment
Supersonic flow quality Traversing rake
Centreline pole
Transonic flow quality
10deg Cone model
Cone/cylinder model
Porous wall optimization
Project : ISRO- 1.2m Trisonic Blow Down Wind Tunnel - BDWT Tata Projects Limited
EPC Contractor : Client : Indian Space Research Organization
Document : Preliminary & Detail Engineering scope Matrix
Equipment
Foundations
Storage Rack Rails
Drive
Bldg No.2 - Compressor House
Bldg No.3 - Technical Block-1
Bldg No.5- Muffler Exhaust Section
Bldg No.6 - Maintenance room
Bldg No.8 - Technical Block 2
Bldg No.9- Cooling water system for
compressor
Bldg No.11 - Electrical control Room
Bldg No.12 - Fire Water Pump
House
Bldg No.13-Ground Level Reservoir
Bldg No.14-Store Room
Bldg No.15- Substation - MCC Building
DG Set Room
Bldg No.9- Cooling water system for
compressor
Bldg No.11 - Electrical control Room
Bldg No.12 - Fire Water Pump
House
Bldg No.13-Ground Level Reservoir
Bldg No.14-Store Room
Bldg No.15- Substation - MCC Building
DG Set Room
Bldg No.18 - Security room Bldg No.
21- Workshop Instrument air Package
Shed Storm water Drain system-
Watch Tower
RCC Water Tank - Elevated
AIOLOS TPL
Preliminary Detail Engineering Preliminary Detail
Technical Scope of Work Engineering Engineering Engineering
√ √
√ √
Size, Specs √
Size, drawing √ √
Date : 20/10/2018
Page : 2 of 5
Rev. : V1.0 Document : Preliminary & Detail
AIOLOS TPL
Preliminary Detail Engineering Preliminary Detail
Technical Scope of Work Engineering Engineering Engineering
√ √
Size and number and detail drawing
Structural definition (drawings) √ √
Nos, Size, type, loads
√ √
Hydraulic schematic by AEC and MR √ √
/PR by TPL detailing of connection to
cylinders
Longitudinal drive and fabrication dwgs
√ √
Size, range of motionand fabrication dwgs √ √
Size √ √
AIOLOS TPL
Preliminary Detail Engineering Preliminary Detail
Technical Scope of Work Engineering Engineering Engineering
√ √
√ √ √
Size √ √
Size, open area ratio, fabrication dwgs Size, √ √
number & performance, fabrication drawings
√ √
√ √
√ √
Process control & Safety PLC √ √
Automation & control ( Software Develoment
, Integration ) √ √
Measuring Instrument & Wiring
Data acquisition
• Tunnel Channels (PPLC / SPLC)
• LSDAS √ √
• HSDAS
• Wireless DAS √ √
√ √
Size, range of motion √ √
Pitot tube number
√ √
Size √ √
AIOLOS TPL
Preliminary Detail Engineering Preliminary Detail
Technical Scope of Work Engineering Engineering Engineering
√ √
√ √
√ √
√ √
√ √
√ √
√ √
√ √
√ √
Date : 20/10/2018
Page : 5 of 5
Rev. : V1.0 Document : Preliminary & Detail
AIOLOS TPL
Preliminary Detail Engineering Preliminary Detail
Technical Scope of Work Engineering Engineering Engineering
HT Panel Detailing √ √
Compressor and everything else
11 KV compressor motor soft starter
Design of PMCC for Compressor Aux. Air drier , Air
cooling System ,HVAC , UPS inside MCC
substation.
Number and type
Detailing of VFD Panels with VFD Feeders for
flexible nozzle ,screw stop motors,Model
Cart ,Variable Diffuser, TTS wall porosity drives etc
inside MCC substation
HT Panel Detailing
Compressor and everything else
11 KV compressor motor soft starter
Design of PMCC for Compressor Aux. Air drier , Air
cooling System ,HVAC , UPS inside MCC √
substation.
Number and type
Detailing of VFD Panels with VFD Feeders for √ √
flexible nozzle ,screw stop motors,Model
Cart ,Variable Diffuser, TTS wall porosity drives etc
inside MCC substation √ √
Design for battery back up duration 1
Hr.Located in MCC substation
Design for battery back up duration 1
Hr.Located in UPS/ Battery Room of technical √ √
block-1
Detailing of 415 Volt 3 Phase 125 KVA DG for √ √
Emergency power
Power and Control cabling
Design as per latest IS requirement
For Lighting Transformer , LDB,Panels ,
Fixtures Layout √
√
√