The document provides a checklist for testing a 4G modem application. It includes sections to test the prototype PCBA, component changes, PCB layout, firmware/software versions, communication ports, parameter settings, reading/writing status, network connectivity, meter functionality, and continuous testing and monitoring. The checklist specifies procedures, expected results, and spaces to record pass/fail results and actual findings.

Uploaded by

zamani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views

Application Testing Check List

The document provides a checklist for testing a 4G modem application. It includes sections to test the prototype PCBA, component changes, PCB layout, firmware/software versions, communication ports, parameter settings, reading/writing status, network connectivity, meter functionality, and continuous testing and monitoring. The checklist specifies procedures, expected results, and spaces to record pass/fail results and actual findings.

Uploaded by

zamani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

4G MODEM CHECKLIST

Application Testing Checklist


Tested By Date
Application Name
Pass/Fail
Procedure Expected Result (P/F) Actual Results/Comments

PCBA PROTOTYPE
To get Final BOMLIST including the price NA
1) Final BOMLIST

i) Change chipset (comparison) NA


- Reason
- Specification
- Price

2) Component
ii) Addition Battery NA
Changes
- Final Schematic drawing
- Battery functionality
- Battery test report / 10 years
lifetime

To check new version PCB measurement size


compared with old version.
3) PCB Layout
Note : New PCBA cannot fit with casing

Test By : Verify By :
4G MODEM CHECKLIST

Application Testing Checklist


Tested By Date
Application Name
Pass/Fail
Procedure Expected Result (P/F) Actual Results/Comments

SOFTWARE (GUI) & FIRMWARE

1) Firmware Latest firmware version


Version
Latest Software version
2) Software Version

3) Software Software Login :


Authentication - Create User Login
Login
Port setting :
4) Communication
i) Direct Comport
Port Setting
ii) Using TCP/IP
Software can write and read parameter as per
TNB list

5) Parameter Setting Note : 4G Attached Modem Technical


Specification

Test By : Verify By :
4G MODEM CHECKLIST

Application Testing Checklist


Tested By Date
Application Name
Pass/Fail
Procedure Expected Result (P/F) Actual Results/Comments
Parameter / Setting read from the modem
6) Read Status

Parameter / Setting write to the modem


7) Write Status

Log status during read / write


8) Log Status

i) Save modem setting file

9) Setting File
ii) Upload modem setting file

i) 4G Backward 3G/2G – Force setting

ii) Signal Strength

10) Network
iii) Network ping connectivity

iv) Firmware update / Parameter write over


the air

Test By : Verify By :
4G MODEM CHECKLIST

Application Testing Checklist


Tested By Date
Application Name
Pass/Fail
Procedure Expected Result (P/F) Actual Results/Comments
i) Using outsource software

11) SNMP
ii) Using Modem Software

i) Security / Login Setting

ii) Parameter List

12) GUI Comment


iii) Port Setting

iv) Over The Air (OTA)

13) Others

14)

15)

Test By : Verify By :
4G MODEM CHECKLIST

Application Testing Checklist


Tested By Date
Application Name
Pass/Fail
Procedure Expected Result (P/F) Actual Results/Comments

MODEM FUNCTIONALITY (TEST WITH METER)


i) Communication port (Modem →
Meter)
1) Communication - To check the port diagram is follow
Port Diagram & TNB requirement
Cable ii) Communication Port ( Modem → PC)
- Direct setting purpose

i) Read billing using MAP110


< 1min 10s
ii) Load profile 24H using MAP110
< 1min 10s
iii) Read Full Load Profile using MAP110
2) Read Meter Data

iv) Read Event Log using MAP110


< 1min 10s
v) Others

Test By : Verify By :
4G MODEM CHECKLIST

Application Testing Checklist


Tested By Date
Application Name
Pass/Fail
Procedure Expected Result (P/F) Actual Results/Comments
i) Upload Meter Scheme using MAP120

ii) Write Date & Time

3) Write Meter Data


iii) Clear Log

iv) Others

Test Last Gap function


4) Last Gap

Read Using MV90 Software


i) Full Billing Data
ii) Partial Data
5) MV90

iii) Data status

6) Continuous Test
& Monitoring

Test By : Verify By :
4G MODEM CHECKLIST

Application Testing Checklist


Tested By Date
Application Name
Pass/Fail
Procedure Expected Result (P/F) Actual Results/Comments

Test By : Verify By :
4G MODEM CHECKLIST

Application Testing Checklist


Tested By Date
Application Name
Pass/Fail
Procedure Expected Result (P/F) Actual Results/Comments

Test By : Verify By :
4G MODEM CHECKLIST

Test By : Verify By :

You might also like