Name of work: Supply Installation testing and commissioning of 800 kVA transformer (Outdoor)
for replacement of existing 750 KVA transformer(Indoor) with supply and
laying of HT & LT Cables at CSL Substation at SAC Campus Ahmedabad. -
Electrical works.
PART I
TECHNO-COMMERCIAL BID
Note: Only English version should prevail & will be final
This bid contains 37 pages (including serially numbered 35 pages + A & B).
A
GOVERNMENT OF INDIA
SPACE APPLICATIONS CENTRE
CONSTRUCTION & MAINTENANCE GROUP
CIVIL & ELECTRICAL DIVISION
Name of work: Supply Installation testing and commissioning of 800 kVA transformer (Outdoor)
for replacement of existing 750 KVA transformer(Indoor) with supply and
laying of HT & LT Cables at CSL Substation at SAC Campus Ahmedabad.-
Electrical works.
INDEX
2 INDEX B
3 NOTICE INVITING TENDERS 1 to 7
SCANNED DOCUMENTS TO BE SUBMITTED BY TENDERER
4 8
ALONG WITH TECHNO-COMMERCIAL BID
ITEM RATE FOR WORK MEMORANDUM & DECLARATIONS BY
5 9 to 12
THE TENDERER / CONTRACTOR
6 IMPORTANT GUIDELINES FOR TENDERERS 13
8 SCHEDULE – ‘A’ TO ‘I’ 14 to 17
9 TRANSFORMER TECHNICAL SPECIFICATION AS ANNEXURE-I 18 to 27
10 APRROVED MAKE LIST FOR ELECTRICAL WORKS 28 to 34
11 ANNEXURE – 1 : CHECK LIST 35
B
भारत सरकार GOVERNMENT OF INDIA
अंतररक्ष विभाग DEPARTMENT OF SPACE
अंतररक्ष उपयोग केंद्र (सैक) SPACE APPLICATIONS CENTRE (SAC),
निर्ााण एिं अिुरक्षण सर्ूह CONSTRUCTION & MAINTENANCE GROUP (CMG),
नसविल एिं विधुत विभाग CIVIL & ELECTRICAL DIVISION
जोधपुर टे करा, अंबािाडी विस्तार पो.ऑ. JODHPUR TEKRA, AMBAWADI VISTAR P.O.,
अहर्दाबाद – 380015 AHMEDABAD –380015
दरू भाष सं : Ph. No: )079) 26914909/12/26/01 फैक्स सं. FAX No: 079- 26915800
ई-निविदा सूचिा सं.: एिं ददिांक: सैक/सीएर्जी/नस&ईडी/इएल/एर्/् 71/2018-19 एिं दद. : 10.01.2019
E-Tender Notice No.: & Date: SAC/CMG/C&ED/EL/M/71/2018-19 Dt: 10.01.2019
1. भारत के राष्ट्रपनत की ओर से, निम्िनलखित काया के नलए ई-निविदा र्ाध्यर् से ओिलाईि र्द-दर
निविदाएं आर्ंवित की जाती हैं ।
क्र.सं.
वििरण DESCRIPTION ब्यौरा Details
Sl. No
1. काया का शीषाक सैक पररसर, अहर्दाबाद खस्ित सीएसएल
Title of work
सबस्टे शि र्ें र्ौजूदा 750 केिीए ट्ांसफार्ार
(इं डोर) की प्रनतस्िापिा के नलए एचटी एिं
एलटी केबल्स की आपूनता एिं वबछािे सदहत
800 केिीए ट्ांस्फार्ार (आउटडोर) की
आपूनता, संस्िापिा, परीक्षण एिं चालू करिा
- विद्युत काया।
Supply Installation testing and
commissioning of 800 kVA transformer
(Outdoor) for replacement of existing 750
KVA transformer(Indoor) with supply and
laying of HT & LT Cables at CSL
Substation at SAC Campus
Ahmedabad.-Electrical works.
2. निविदा र्ें दी गई प्राक्कनलत लागत ` 24.25 Lakhs
Estimated cost put to tender
3. काया पूरा होिे की अिनध, र्हीिो र्ें, खजसे छह र्हीिा Six Months
काया आदे श जारी होिे की नतनि के 15िें
ददि से नगिा जाए
Period of completion in months
reckoned from the 15th day of date
of issue of work order.
4. निविदा दस्तािेज डाउिलोड करिे की 24.01.2019 को 10:00 बजे से 04.02.2019
अिनध Period during which the tender को 17:00 बजे तक
document can be downloaded.
From 24.01.2019 at 10:00 Hrs. to
04.02.2019 up to 17:00 Hrs.
5. बोली स्पस्टीकरण 24.01.2019 को 11:00 बजे से 06.02.2019
Bid clarifications
को 17:00 बजे तक
From 24.01.2019 at 11:00 Hrs. to
06.02.2019 up to 17:00 Hrs.
-1-
6. निविदा पािे की अंनतर् नतनि एिं सर्य 08.02.2019 को 14:30 बजे तक
Last date and time for receipt of 08.02.2019 up to 14:30 Hrs.
tenders
7. निविदा िुलिे की अंनतर् नतनि एिं सर्य 12.02.2019 को 15:00 बजे (तकिीकी एि
Due date and time of opening of
tenders. िाखणखययक बोली
15:00 Hrs. 12.02.2019 (Technical &
commercial bid)
8. अनिर् धि निक्षेप (ई.एर्.डी.) ` 48,500.00
Earnest money deposit (EMD)
क्र. अहा ता र्ापदं ड Eligibility Criteria अहा ता हे तु नलखित प्रर्ाण (स्ियं द्वारा
अिुप्रर्ाखणत प्रनतयां भेजी जाएं)
सं. Documentary proof for the eligibility
Sl. (Self attested copies to be submitted)
No
a. वपछले सात िषों के दौराि निम्िनलखित काया I. काया आदे शों तिा स्िापिा काया अिुभि से
संतोषजिक रूप से पूणा दकए होिे चादहए। संबनं धत प्रानधकारी द्वारा जारी पूणत
ा ा
Should have satisfactorily completed the प्रर्ाणपि की प्रर्ाखणत प्रनत।
works as mentioned below during the last Certified copy of work orders an
Seven years ending previous day of last dcompletion certificates issued by
date of submission of bids.
the authority concerned to establi
I. तीि सर्ाि काया, प्रत्येक की लागत प्राक्कनलत sh work experience.
लागत के 40% से कर् िहीं होिा चादहए यानि
Rs 9.70 लाि (या) II. निजी कंपनियों द्वारा कायों हे तु पूणत
ा ा
Three similar works each costing not प्रर्ाणपि के साि टी.डी.एस. (स्रोत पर कटौती
less than 40% of the estimated cost i.e दकया गया कर) प्रर्ाणपि भी दे िा होगा।
Rs 9.70 Lakhs (or) Completion certificates for works
II. दो सर्ा काया, प्रत्येक की लागत प्राक्कनलत लागत के issued by Private parties shall be
60% से कर् िहीं होिा चादहए यानि Rs. 14.55 supported by TDS (Tax Deduc
लाि (या) ted at Source) certificates.
Two similar works each costing not
less than 60% of the estimated cost i.e
Rs. 14.55 Lakhs (or)
III. एक सर्ाि काया, प्रत्येक की लागत प्राक्कनलत लागत
के 80% से कर् िहीं होिा चादहए यानि Rs. 19.40
लाि ।
One similar work costing not less than
80% of the estimated cost i.e. Rs. 19.40
Lakhs.
िोटः Note:
I. सर्ाि काया से आशय “कर् से कर् 630 केिीए ट्ांस्फार्ार की आपूनता, संस्िापिा, परीक्षण एिं
-2-
क्र. अहा ता र्ापदं ड Eligibility Criteria अहा ता हे तु नलखित प्रर्ाण (स्ियं द्वारा
अिुप्रर्ाखणत प्रनतयां भेजी जाएं)
सं. Documentary proof for the eligibility
Sl. (Self attested copies to be submitted)
No
चालू करिा का काया होिा चादहए”
Similar work shall mean “SITC of atleast mimimum capacity 630 KVA Transfromer
work ”
II. दकए गए कायों का र्ूल्य, काया के िास्तविक र्ूल्य र्ें 7% प्रनत िषा की साधारण दर से बढ़ोत्तरी करिे पर
ितार्ाि लागत स्तर तक हो जािा चादहए, खजसकी गणिा काया सर्ाप्त होिे की नतनि से बोली हे तु आिेदि
की प्रानप्त की अंनतर् नतनि तक की जाए।
The value of executed works shall be brought to current costing level by enhancing
the actual value of work at simple rate of 7% per annum, calculated
from the date of completion to last date of submission of bids.
III. उप सविदा अििा संयक्त
ु आधार पर संपन्ि दकए गए काया को पािता/आकलि के योग्य िहीं र्ािा जाएगा।
Work executed as sub-contract or joint-venture will not merit for eligibility /
evaluation
b. बोलीकताा के पास केंद्रीय अििा रायय विद्युत प्रानधकारी द्वारा जारी दकया गया उपयुक्त कक्षा एिं श्रेणी
का िैद् युत संविदाकार का विनधर्ान्य लाइसेंस होिा चादहए।
The bidder shall possess valid electrical contractor’s license of appropriate class and
category issued by Central or State Electricity Authority.
c. र्ाि अिुरक्षण काया हे तु लागू होिा चादहए पीएफ एिं ईएसआई पंजीयि संख्या की प्रनतनलवप
Applicable only for maintenance works - लागु
पीएफ एिं ईएसआई पंजीयि होिा चादहए Applicable
Should have PF and ESI registration
निविदा दस्तािेज निविदा विजाडा के साि पंजीयि तिा निविदा प्रदक्रया शुल्क का भुगताि करते हुए
ई-निविदा िेबसाईट www.tenderwizard.com/ISRO से डाऊिलोड दकए जा सकते है | विक्रेता के
पंजीयि करिे की प्रदक्रया उपयुक्त
ा िेबसाईट र्ें प्रदनशात की गई है | निविदा प्रदक्रया शुल्क र्ें र्ेससा.
आईटीआई नल. को ई-गेटिे के र्ाध्यर् से भुगताि करे |
3. निविदा को केिल डाउिलोड कर लेिे से बोलीकताा बोली प्रदक्रया र्ें भाग लेिे का पाि िहीं होगा।
निविदाकार द्वारा अपलोड दकए गए प्रेलेिों को बाद र्ें विभाग द्वारा सत्यावपत दकया जाएगा।
आिश्यकता के अिुरूप ि पाए जािे िाले प्रस्तािों को रद्द कर ददया जाएगा ।
Downloading of tender documents alone will not make a tenderer eligible for
participating in the bidding. The documents uploaded by the tenderers will be
subjected to verification subsequently by Department. If found not meeting the
requirement, such offers will be rejected.
-3-
4. (a) निविदा के साि उपयुक्त
ा पैरा 1 र्ें उखल्लखित र्ूल्य की बयािा रानश संलग्ि होिी चादहए ,जो
दकसी अिुसनू चत बैंक द्वारा लेिा अनधकारी ,सैक ,अहर्दाबाद के पक्ष र्ें जारी कॉल रसीद / नर्यादी
जर्ा / दडर्ांड ड्राफ्ट अििा बैंक गारं टी के रूप र्ें होिी चादहए। बयािा रानश ,निविदा प्राप्त होिे की
अंनतर् नतनि से 180 ददिों तक र्ान्य होिा चादहए। बयािा धि अर्ाित यदद डीडी के रूप र्ें प्रस्तुत
की गई है , तो निविदाओं के िोलिे के तुरंत बाद इन्हें भुिा नलया जाएगा और असफल निविदाकरों को
बयािा धि अर्ाित विभाग द्वारा चेक इलेक्ट्निक र्ाध्यर् से िापस/भेजी जाएगी ।
Tenders should be accompanied with Earnest Money Deposit for value specified in
Para 1 above, in the form of Deposit at Call receipt/ Term Deposit Receipt/ Demand
Draft of any Scheduled Bank issued in favour of “Accounts Officer SAC,
Ahmedabad’’ (or) in the form of Bank guarantee issued by a scheduled bank.
Earnest Money Deposit shall be valid for 180 days from the due date of receipt of
tenders. In Case EMD in the form of DD is furnished, the same will be encashed
immediately on opening of tenders and refund of EMD for unsuccessful
tenderers will be made through Cheque /electronically by Department
4 (b) “निविदा कीर्त/ईएर्डी से छूट का दािा करिे िाली एर्एसएर्ई इकाईयों को खजला उद्योग केंद्र
(डीआईसी)/िादी एिं उद्योग बोडा (केिीआईबी)/कोयर बोडा /राष्ट्रीय लघु उद्योग आयोग
(एिएसआईसी)/हस्तनशल्प तिा हिकरघा निदे शालय अििा सूक्ष्र् लघु र्ध्यर् उद्यर् र्ंिालाय द्वारा
निधााररत दकसी अन्य निकाय द्वारा जारी पंजीकरण प्रर्ाणपि के साि एर्एसएर्ई उद्योग आधार
ज्ञापि प्रस्तुत करिा होगा। ज्ञापि/प्रर्ाणपि र्ें स्पष्ट रूप से वित्तीय सीर्ा का उल्लेि दकया जाए तिा
िह निविदा की दे य नतनि/बढ़ाई गई नतनि तक िैध होिा चादहए। इसर्ें ईएर्डी/निविदा शुल्क छूट प्राप्त
करिे के नलए निविदा की गई सार्नियों का उल्लेि भी होिा चादहए।”
“The MSME units claiming exemption of Tender cost / EMD should submit MSME
UDYOG ADHAR MEMORANDUM along with registration certificate issued by District
Industries Centre (DIC) / Khadi & Industries board (KVIB) / Coir board / National small
industries commission (NSIC) / Directorate of Handicrafts and handlooms or any
other body specified by Ministry of MSME. The memorandum / certificate shall clearly
indicate the monetary limit and shall be valid as on due date / extended due date of
the tender. Also it should cover the items tendered to get EMD / Tender fee
exemptions.”
5. निविदाएं िुप प्रधाि के कायाालय, निर्ााण एिं अिुरक्षण िुप सैक, अहर्दाबाद र्ें पैरा 1 के अिुसार
निधााररत नतनि एिं सर्य को िोली जाएंगी ।
Tenders will be opened at the Office of the Group Director, Construction and
Maintenance Group, SAC, Ahmedabad on the stipulated date and time specified
in Para 1above.
6. a) निविदा िोलिे की निधााररत नतनि और सर्य तक या उससे पहले िुप निदे शक, निर्ााण एिं
अिुरक्षण िुप, सैक, अहर्दाबाद के कायाालय र्ें ईएर्डी के र्ूल दस्तािेज पहुुँच जािे चादहए। यदद
-4-
निविदा िोलिे की निधााररत नतनि या सर्य से पूिा िैध ईएर्डी प्राप्त िहीं होती है तो, अंतत: निविदा
प्रस्ताि को निरस्त कर ददया जाएगा ।
Original instrument of EMD shall be submitted to the Office of the Group Director,
Construction and Maintenance Group, SAC, Ahmedabad on or before due date
and time of opening of tender. If valid EMD is not received on or before due date
and time of opening of tender, the tender offer shall be summarily rejected.
6 (b) निविदा कीर्त/ईएर्डी से छूट का दािा करिे िाली एर्एसएर्ई इकाइयां उपयुक्त
ा पैरा 4 (b) र्ें
उखल्लखित पंजीकरण प्रर्ाणपि के साि एर्एसएर्ई उद्योग आधार ज्ञापि की सत्यावपत हाडा प्रनत
प्रस्तुत करें ।
The MSME units claiming exemption of Tender cost / EMD should submit attested
hard copy of MSME UDYOG ADHAR MEMORANDUM along with registration
certificate as indicated in para 4 (b) above.
उपयुक्त
ा ज्ञापि/प्रर्ाणपि की हाडा कॉपी सर्ूह निदे शक, निर्ााण एिं अिुरक्षण सर्ूह, सैक,
अहर्दाबाद के कायाालय र्ें दे य नतनि तिा निविदा िोले जािे के सर्य से पूिा प्रस्तुत की
जाए। यदद हाडा कॉपी दे य नतनि तिा निविदा िोले जािे के सर्य से पूिा प्राप्त िहीं होती है
तो निविदा प्रस्ताि रद्द कर ददया जाएगा।
The hard copy of above memorandum / certificate shall be submitted to the Office
of the Group Director, Construction and Maintenance Group, SAC, Ahmedabad
on or before due date and time of opening of tender. If hard copy is not received
on or before due date and time of opening of tender, the tender offer shall be
summarily rejected.
7. निविदा िोलिे की नियत नतनि को केिल बयािा रानश जर्ा करिे िाले निविदाकारों की
िाखणखययक बोलीओं को ही िोला जाएगा। तकिीकी एिं िाखणययक बोली के िोलिे पर, पुि:
विस्तृत संिीक्षा एिं र्ूल्यांकि दकया जाएगा । तकिीकी एिं िाखणखययक बोली के र्ूल्यांकि
के दौराि, निविदाकारों द्वारा प्रस्तुत दकए गए दस्तािेजों की विस्तृत जाुँच की जाएगी। यदद
यह पाया जाता है दक कोई निविदा अहा ता पािता को पूरा िहीं करती है तो इसी चरण र्ें यह
निरस्त कर दी जाएगी और उि प्रस्तािों को आगे की प्रदक्रया हे तु शानर्ल िहीं दकया जाएगा।
जाुँच एिं तकिीकी र्ूल्यांकि र्ें योग्य पाए गए निविदाकारों की र्ूल्य बोनलयों को विनिददाष्ट
नतनि को (योग्य बोलीकतााओं को विनधित सूचिा दी जाएगी) अलग से िोला जाएगा और
आगे निविदा प्रदक्रया नियर्ों के अिुसार कारा िाई की जाएगी।
On the due date of opening, the Technical & Commercial bid of those tenderers
who furnished valid EMD only will be opened. On opening of Technical &
commercial bid further detailed scrutiny / evaluation will be carried out. During the
evaluation of techno-commercial bids, the documents furnished by the tenderers
will be scrutinized in detail. Any tender, found as not fulfilling the eligibility criteria
will be rejected at this stage and such offers will not be considered for further
processing. The price bid of only those tenderers who have been qualified during
the scrutiny and technical evaluation will be opened separately on a specified date
-5-
(with due intimation to the qualified bidders) and further processed, as per tender
procedure/ stipulations.
8. सफल ठे केदार की बयािा रानश को निष्पादि गारं टी के रूप र्ें रूपांतररत दकया जाएगा । कार्
पूरा होिे पर इसे सुरक्षा रानश के रूपांतररत दकया जाएगा। स्िीकृ नत पि /काया आदे श प्राप्त
होिे पर बयािा रानश के भुगताि से छूट के र्ार्लों र्ें आकनलत लागत की 2% रानश को
निष्पादि गारं टी के रूप र्ें शानर्ल करते हुए तत्काल प्रस्तुत करिा होगा ।
Intending tenderers may inspect the site before submitting the tenders, with the
prior permission of Group Director, CMG/ Head CMD/ Engineer-SG / Engineer-
SF/ Engineer-SE/ Engineer-SD
10. भारत के राष्ट्रपनत की ओर से निविदा स्िीकार करिे िाला प्रानधकरण न्यूि या दकसी अन्य निविदा को
स्िीकार करिे हे तु बाध्य िहीं है और कोई कारण बताए वबिा दकसी या प्राप्त सभी निविदाओं को रद्द
करिे का अनधकार रिता है । सभी निविदाएं जो निददा ष्ट शतों र्ें से यदद दकसी शता को पूरा िहीं करती
हों या कोई शता खजसर्ें निविदाकार द्वारा सशता छूट दी गई है , निरस्त कर दी जाएंगी।
11. भारत के राष्ट्रपनत की ओर से निविदा स्िीकार करिे िाला प्रानधकरण काया आदे श जारी करिे से पहले
कायाक्षेि र्ें पररिताि/ या काया की र्ािा र्ें कर्ी का भी अनधकार रिता है तिा निविदाकार इस संबध
ं
र्ें कोई भी दािा िहीं करे गा।
The tender accepting authority on behalf of President of India also reserves the
right to alter the scope/ or reduce quantum of work before issue of work order and
the tenderer shall not have any claim what so ever on this account.
12. भारत के राष्ट्रपनत की ओर से निविदा स्िीकार करिे िाला प्रानधकरण निविदा को पूणा रूप से या उसके
दकसी भाग को स्िीकार करिे का अनधकार रिता है तिा निविदाकार को ददए गए र्ूल्य पर ही काया
करिा होगा।
The tender accepting authority on behalf of President of India reserves the right of
accepting the whole or any part of the tender and the tenderer shall be bound to
perform the same at the rate quoted.
-6-
13. निविदा के संबध
ं र्ें प्रत्यक्ष या अप्रत्यक्ष रूप से कोई भी पक्षप्रचार सख्तता से निवषद्ध है और ठे केदार
खजसिे पक्षप्रचार करिे की कोनशश की है उसके द्वारा प्रस्तुत की गई निविदा निरस्त कर दी जाएगी।
14. निविदा स्िीकार करिे िाला प्रानधकरण सरकार द्वारा सर्य-सर्य पर जारी की जािे िाली िीनतयों के
अिुसार प्रस्तािों को प्रािनर्कता दे िे का विकल्प रिता है ।
The tender accepting authority reserves the option to give preferences to the offers in
accordance with the policies of the Government from time to time.
15. निविदाकार को विभाग के केंद्र के उस प्रभाग र्ें निविदा जर्ा करिे की अिुर्नत िहीं दी जाएगी
खजसर्ें संविदा दे िे और उसके कायाान्ियि हे तु खजम्र्ेदार कायाारत व्यवक्त उसका/उसकी कोई िजदीकी
ररस्तेदार है । उसे उि व्यवक्तयों का िार् भी सूनचत करिा होगा जो उसके साि दकसी भी क्षर्ता र्ें कार्
कर रहें हैं या जो उसके िहा कायारत हैं और जो अंतररक्ष विभाग र्ें कायारत राजपवित अनधकारी का
िजदीकी ररस्तेदार है । ठे केदार द्वारा इस शता का उल्लंघि करिे पर उसके द्वारा जर्ा की गई निविदा
रद्द कर दी जाएगी तिा संविदा निरस्त हो जाएगी।
The contractor shall not be permitted to tender for works in the Division of that
particular Centre of the Department responsible for award and execution of contracts
for which his/her near relative is working. He/she shall also intimate the names of
persons who are working with him in any capacity or are subsequently employed by
him and who are near relatives to any Gazetted Officer in the Department of Space.
Any breach of this condition by the contractor would render him liable for rejection of
tender or cancellation of contract.
The tender should be valid for minimum period of 120 days from the due date of
receipt of the tender specified in Para 1 above. If any tenderer withdraws the offer
within the validity period or makes any modifications in the terms and conditions of
the tender which are not acceptable to the Department, the Government shall without
prejudice to any other right or remedy, be at liberty to forfeit 50% (Fifty Percent) of the
Earnest Money Deposit absolutely. Further, the tenderer shall not be allowed to
participate in the re-tendering process of the work.
17. निविदा पूरी होिे पर, सफल निविदाकारों के साि एक करार दकया जाएगा।
On concluding the tender, an agreement shall be drawn with the successful tenderer.
-7-
तकिीकी-िाखणखययक बोली के साि निम्िनलखित दस्तािेजों की स्कैि की हुई कॉवपयाुँ प्रस्तुत करिी
होगी, ऐसा ि करिे निविदाकारों को रद्द दकया जा सकता है ।
SCANNED COPY OF THE FOLLOWING DOCUMENTS SHALL BE SUBMITTED
ALONG WITH TECHNO-COMMERCIAL BID, FAILING WHICH THE TENDERERS
ARE LIABLE TO BE REJECTED.
1. चल रहे कायों के प्रर्ाण स्िरूप संबंनधत प्रानधकारी द्वारा जारी काया आदे श ।
Work orders issued by the authority concerned to establish work on hand.
2. कायंिुभि के साक्ष्य के रूप र्ें संबंनधत प्रानधकारी द्वारा जारी पूणत
ा ा प्रर्ाणपि ।
Completion certificates issued by the authority concerned to establish work
experience.
3. पािता र्ापदं ड के अिुसार सर्ाि प्रकृ नत के काया निष्पाददत दकए जािे के दस्तािेजीय साक्ष्य
Documentary proof for having executed the work of similar nature and
comparable magnitude as per the eligibility criteria.
4. निजी पादटायों द्वारा जारी दकए गए काया पूणत ा ा प्रर्ाणपिों के साि र्ूल स्रोत पर कर कटौती
प्रर्ाणपि ।
Completion certificate for works issued by private parties shall be supported by
TDS (Tax Deducted at Source) certificates.
5. ईएसआई एिं पीएफ पंजीकरण िं की प्रनतनलवप
Copy of ESI and PF registration number
6. संविदा की सार्ान्य शतों र्ें ददए गए फार्ेट-1 के अिुसार काया का र्ूल्य, पूणत
ा ा की नतनि,
सर्य का बढ़ािा इत्यादद का उल्लेि करते हुए पूणा दकए गए कायों की सूची।
A list of completed works indicating value of work, date of completion,
extension of time etc., as per Format-1 in General Conditions of Contract.
7. पैि /टै ि वििरण PAN / TAN details.
8. बयािा रानश दडपोखजट Earnest Money deposit.
9. कंपिी का प्रोफाइल वििरण के साि Company Profile with details.
10. अनतररक्त दस्तािेज, यदद है तो Additional Documents, if any.
-8-
Item Rate Tender for Works
Memorandum
1. I/ We hereby tender for the execution for the President of India for the work specified in
the this Written Memorandum and the notification inviting tender (NIT) within the time/s
specified in the Memorandum at the rates specified in the attached schedule of quantities
(schedule A) and in all respects with these specifications, design, drawings and
instructions in writing referred to in Rules here of and in clause 11 of the General
conditions of Contract (GCC) and with such materials as provided for by and all other
respects in accordance with such conditions so far as applicable.
2. Should this tender be accepted in whole or in part, I/We hereby agree to abide by and fulfil
all the terms and provisions of General conditions of contract (GCC) and General
Guidelines to be read in conjunction with GCC, annexed here to and all the terms and
provisions contained in NIT, which has been read by me/ us and explained to me/ us so
far as applicable or in default thereof to forfeit and pay to the President of India or the
successors in Office the sums of money mentioned in the said conditions.
3. A sum of Rs…………. is hereby forwarded by crossed D.D, fixed deposit, Bank Guarantee
by approved Scheduled bank, Call Receipt of a Scheduled Bank guaranteed by the
Reserve Bank of India as Earnest Money. If I/ We fail to commence the work specified in
the above Memorandum, I/ We agree that the said President or his successors in office
shall, without prejudice to any other right or remedy be at liberty to forfeit the said EMD
absolutely.
4. In the event of accepting my/ our offer by Department, I/ We agree to deposit the required
Performance Guarantee within 15 days from the date of issue of letter of intent/ work
-9-
order. In case, if I/ We fail to deposit the same within the period specified including the
extended period if any, I/ We agree that the said President or his successors in office
shall, without prejudice to any other right or remedy be at liberty to forfeit the said EMD
absolutely.
5. I/ We agree to execute all the works referred to in the tender documents upon the terms
and conditions contained or referred therein and to carry out such deviation as may be
ordered subject to the condition of clause 12 herein after referred to as the deviation limit
at the rates quoted in the tendered documents and those in excess of that limit at the
rates to be determined in accordance with the provision contained in clause 12 of the
General conditions of Contract (GCC)
6. I/We hereby declare that I/ We shall treat the tender documents, drawings and other
records connected with the work as secret/ confidential documents and shall not
communicate the same or use the information in any matter prejudicial to the safety of the
country.
I/We also declare that I/We have perused in detail and examined closely the specifications
and I/We agree to be bound by and comply with all such specifications for this work.
I/We declare that the work will be carried out as per the specification in tender document
and as per the specifications said above. The items of work not covered in the
specifications said above will be carried out as per the specifications in the relevant
CPWD specifications, and if not covered in CPWD specifications the work will be carried
out as in the relevant specifications of Bureau of Indian Standard, and if not covered in
any of the above, the work will be carried out as directed in writing by the Engineer-in-
charge.
8. I/We declare that I/We…………………………. are not associated, nor has been
associated in the past, directly or indirectly with the consultant or any other entity that has
prepared the design, specification and other documents for the project for which tenders
are invited.
- 10 -
I/We also declare that I/We ……………………. are not associated, nor has been
associated in the past, directly or indirectly with the consultant or any other entity who has
been engaged by the Department to provide consulting services for the preparation of
supervision of the works for which tenders are invited.
I/We declare that the rates quoted by me/us are on the basis of the above.
- 11 -
Name of work: Supply Installation testing and commissioning of 800 kVA transformer
(Outdoor) for replacement of existing 750 KVA transformer(Indoor) with
supply and laying of HT & LT Cables at CSL Substation at SAC Campus
Ahmedabad. -Electrical works.
1. I hereby declare that I have gone through clearly and understood the General
Conditions of Contract for Civil and allied works along with the Schedules
appended (Schedules G, H and I) and other relevant formats (Formats 1 to 5)
available in Office of Group Director, Construction & Maintenance Group, SAC,
Ahmedabad & uploaded in website at http://www.isro.gov.in/tenders.
2. My offer submission for the tender for “Supply Installation testing and
commissioning of 800 kVA transformer (Outdoor) for replacement of existing 750
KVA transformer(Indoor) with supply and laying of HT & LT Cables at CSL
Substation at SAC Campus Ahmedabad. -Electrical works.” is after fully
considering the above and also the other documents issued along with the tender.
3. I also confirm that the offer now submitted is totally in agreement with the General
Conditions of Contract provided in the above ISRO website read in conjunction
with the documents, drawings and specification issued for this particular tender,
except for commercial & technical deviation, if any, specifically brought out in my
Techno-Commercial offer, submitted herewith.
- 12 -
Name of work: Supply Installation testing and commissioning of 800 kVA transformer
(Outdoor) for replacement of existing 750 KVA transformer(Indoor) with
supply and laying of HT & LT Cables at CSL Substation at SAC Campus
Ahmedabad. -Electrical works.
(i) www.isro.gov.in/tenders
(ii) www.tenderwizard.com/ISRO
In addition to soft copy available on website, they are also available in the office of
the Group Director, CMG, SAC for reference and study of tenderers. Contract
Agreement shall be drawn with the successful bidder incorporating hard bound
copy of the NIT, General Conditions of Contract along with full set of documents,
every page of which should be signed by the contractor. Tenderer shall quote his
rates as per various terms & conditions of the standard tender form which will form
part of the Agreement. To this effect, Tenderer shall submit the scanned copy of
duly signed Declaration attached with Techno- Commercial bid at page No:12.
*For formats vide Nos. 1, 2a, 2b, 2c, 3 & 4 i.e. Draft Bank Guarantee bond for
earnest money, performance security (Guarantee), security deposit, Affidavit &
Indemnity Bond, please refer e-tendering GCC (General Conditions of Contract)
for Maintenance/Minor works (Page No. E-52 to E-61) uploaded on above
websites.
2. Labour Cess @ 1% or applicable from time to time in the state of Gujarat will be
recovered from your gross amount of each running bill and from final dues as per
“Building and Other Construction Worker’s (BOCW) Welfare Cess Act.
3. The original EMD instrument shall be placed in the Electrical tender box kept in
CMG / SAC (building no. 49) near room no. 12 in First Floor inside SAC Campus.
Applicants / Bidders are requested not to place the original instrument of EMD in
Tender Box kept at Main Gate of SAC or any other place. Tenderers having
MSME registration & seeking exemption of EMD, are also requested to submit /
place the photo copy of their MSME certificate & valid NSIC registration in the
tender box as mentioned above
- 13 -
SCHEDULES ‘A’ TO ‘I’
SCHEDULE `A’ - SCHEDULE OF QUANTITIES (PRICE SCHEDULE SEPARATELY
ATTACHED)
General notes:
Rates for various items of work in the accompanying schedule of quantities for “Supply
Installation testing and commissioning of 800 kVA transformer (Outdoor) for replacement
of existing 750 KVA transformer(Indoor) with supply and laying of HT & LT Cables at CSL
Substation at SAC Campus Ahmedabad. -Electrical works.” shall be quoted after taking
into account of the following notes.
1. This is an indivisible works contract. The rates quoted shall include all taxes
including Goods and Service Tax (GST) at applicable rates and all levies, duties,
cess etc. payable under respective statues. Deductions as per statues will be
effected from the bill and remitted to the Department concerned.
2. The rate quoted shall abide all the provisions mentioned in General Conditions
of Contract (GCC) and other general guidelines mentioned in this tender.
3. The rates for various items of works in the Schedule of quantities shall be quoted
taking into account the cost of materials, labour, tools and plants, scaffolding,
necessary wastages, cost of handling and conveyance of materials to place of
work, over heads and profits and any other incidentals included therein.
4. Rates quoted by the Tenderers for various items of work shall be deemed to be
inclusive of such leads and lifts mentioned therein and/or as shown in the
accompanying tender drawings. Where such information is absent, the rates
shall be deemed to be inclusive of the necessary leads and lifts to complete the
item of work occurring at any height and with any required leads.
6. In the ‘Item of work/ description of work’ column ‘unit’ column, the various
abbreviations shall mean as below.
- 14 -
d. Kg/kg/KG shall mean ‘Kilogram’ in weight.
e. MT/mT/Mt/T shall mean ‘Metric Tonne’ in weight
f. Cm/CM/cm shall mean ‘Centimetre’
7. In the event no rate has been quoted for any item(s), leaving space both in
figure(s), word(s), and amount blank, it will be presumed that the contractor has
included the cost of this/ these item(s) in other item(s). The rate for such item(s)
will be considered as ZERO. The work will be required to be executed as specified.
- 15 -
SCHEDULE ‘B, C, D & E’ – DELETED
Name of work: Supply Installation testing and commissioning of 800 kVA transformer
(Outdoor) for replacement of existing 750 KVA transformer(Indoor) with
supply and laying of HT & LT Cables at CSL Substation at SAC Campus
Ahmedabad. -Electrical works.
1. Estimated cost of work ` 24.25 Lakhs
2. Earnest Money ` 48,500.00
3. Performance guarantee ` 48,500.00
4. Security Deposit ` 48,500.00
- 16 -
REF: CLAUSE 12 OF GCC: DEVIATIONS/ VARIATIONS, EXTENT AND PRICING
Deviation limit beyond which clause 12 shall apply
- 17 -
Annexure-I
TECHNICAL SPECIFICATIONS
1.0 SCOPE
This specification covers, engineering, manufacture, assembly, inspection and
testing before supply and delivery at site of outdoor, oil immersed, naturally
cooled, three-phase, 800 kVA, 11kV/433V, 50Hz, Delta-Star (Dyn11), ONAN,
Outdoor type, oil immersed copper wound, plinth mounted power transformers
with Off-Load Tap Changer.
18
The transformer shall be suitable for outdoor installation with three-phase,
50 Hz, 11 kV, effectively earthed neutral and they shall be suitable for service
under fluctuations in supply voltage up to + 10% to -15%. The transformer shall
conform to the following specific parameters: -
Rated Capacity 800 kVA
System Voltage (max.) 12 kV
Rated HT voltage 11 kV
Rated LT voltage 433V
Frequency 50 Hz ± 5%
No. of Phases Three-phase
Connection HV Delta
Vector group Dyn11
Type of cooling ONAN
Tap changing arrangement Off-load tap changer on HV side
+5% to -10% in steps of 2.5 %
Percentage Impedance 5.0% (IS tolerance)
Permissible temperature rise
Of winding 45C
Of top-oil measured 40C
19
SURFACE PREPARATION & PAINTING
All paints shall be applied in accordance with manufacturer’s recommendations.
Particular attention shall be paid to the following:
Proper storage to avoid exposure as well as extremes of temperature.
Surface preparation prior to painting.
Mixing and thinning
Application of paints and recommended time intervals between coats.
Shelf-life for storage
All paints, when applied in a normal full coat, shall be free from runs, sags,
wrinkles, patchiness, brush marks or other defects.
All primers shall be well marked on to the surface, particularly in areas where
painting is evident, and the first priming coat shall be applied as soon as possible
after cleaning. The paint shall be applied by airless spray as per manufacturer’s
recommendations. However, wherever airless spray is not possible, conventional
spray shall be used. The supplier shall protect nameplates, lettering gauges, sight
glasses, light fittings and similar such items prior to painting.
TANK
Tank shall be of all welded construction & fabricated from commercial grade low
carbon steel of adequate thickness. All seams shall be properly welded and
stress relieved.
The tank wall shall be reinforced by stiffener to ensure rigidity so that it can
withstand mechanical shock during transportation and during oil filling by vacuum
without any deformation.
Transformer tank shall be provided with one set of bi-directional flanged wheels
for rolling the Transformer parallel to either centre line over rail gauge.
All heavy removable parts shall be provided with eye bolt for ease of handling.
Manholes of sufficient size shall be provided for access to leads, winding, bottom
terminals of bushings and taps
WINDINGS
Double paper covered copper conductor of 99.9% purity shall be used for the
transformer. Current density for HV and LV shall be at least 2.5 A/sq.mm.
OIL
The insulating oil shall comply with the IS 335. Oil shall be filled under vacuum
of 250 Torr ± 5%.
LOSSES
The bidder shall guarantee individual no-load loss and load loss without any
positive tolerance. The bidder shall also guarantee the total losses at 50% load
condition (50% of rated kVA rating at rated voltage and frequency and at 75C
without any positive tolerance) as per IS 1180.
CONSERVATOR
20
When a conservator is provided, oil gauge and the plain or dehydrating breathing
device shall be fixed to the conservator also provided, with a drain plug and a
filling hole with cover. The capacity of a conservator tank shall be designed to
contain 10% of the total quantity of oil and its contraction and expansion due to
temperature variations. Normally, 3% quality of total oil will be contained in the
conservator. In addition, the cover of main tank shall be provided with an air
release plug to enable air trapped within to be released, unless the conservator
is so located as to eliminate the possibility of air being trapped within the main
tank.
The inside diameter of pipe connecting conservator and main tank shall be within
30 to 50 mm and it shall be projected into the conservator so that its end is
approximately 20 mm above the bottom of the conservator so as to create a sump
for collection of impurities. The minimum oil level (corresponding to – 5C) shall
be above the sump level.
BREATHER
Breather shall be screw type with die cast aluminium body, inside container for
silica gel shall be of tin sheet with minimum weight of silica gel of 0.5 kg.
BUSHINGS
Cable end box at HV side suitable for connecting one Run of 3C x 185 Sq.mm
Aluminium XLPE, armoured 11kV cable and provision for connecting LT Cables
(4 Runs of 4C X 300 sq mm ) on secondary side of the transformer.
6.0 FITTINGS
The following standard fittings shall be provided.
i) Rating and non-detachable terminal marking plates
ii) Metallic name plate
iii) Earthing terminals with lugs
iv) Conservator tank with interconnecting pipes.
v) Oil level gauge with toughened glass with minimum marking.
vi) Thermometer pocket.
vii) Dehydrating breather.
viii) Air release plug on the transformer tank to release tapped air inside
the tank when filling oil through conservator.
ix) Oil level gauge showing the maximum, normal and minimum oil
levels with contacts for low oil level alarm. The gauge shall be
readable from base level.
x) Silica gel breather.
xi) Buchholz relay with alarm and trip contacts with one shut-off valve
on conservator side and flange couplings to permit easy removal
without lowering oil level in the main tank.
xii) Pressure relief vent (As per OEM standard)
xiii) Dial type temperature indicator with maximum reading indicator
21
pointer and two sets of contacts. A dial type, weatherproof,
indicating thermometer shall be mounted on the side of transformer
in the hottest part of the oil, fitted with alarm and trip contacts.
xiv) Winding temperature indicator with two contacts, indicating type,
responsive to the combination of hot oil temperature and winding
current, calibrated to the hottest spot temperature of transformer
winding. It shall operate a remote alarm and trip in the event of a
hotspot temperature approaches dangerous values.
xv) Valves
Valve between cooler and main tank
One drain cum sampling valve
One filter valve on the upper top side of the tank
Drain valve.
Two filter valves
Two sampling valves at top and bottom of main tank
xvi) Two earthing terminal with lugs.
xvii) Valve schedule plate.
xviii) Jacking pads.
xix) Lifting bollards with fastening holes.
xx) Haulage & Cover lifting lugs
xxi) Bi-directional flanged rollers with locking and bolting device. Track
gauge in both longitudinal and transverse direction shall be
indicated.
xxii) weatherproof marshalling box mounted on tank mounted for
housing and control equipment and the terminal connections.
xxiii) Air release devices.
xxiv) Wiring up to marshalling box with copper cables.
xxv) Cooling accessories such as requisite number of radiators with
shutoff valves, Drain and sampling devices and Air release devices.
xxvi) Cable end box at HV side suitable to connect One Run of 3C x 185
Sq.mm Aluminium XLPE armoured 11kV cable and provision for
connecting LT cables (4Runs X 3.5C X 300 sq mm) on secondary
side of the transformer.
xxvii) Separate neutral terminal on LV side.
xxviii) Necessary oil for first filling, 10% extra oil for topping up.
xxix) Bottom mounting channels.
xxx) Explosion vent with diaphragm
xxxi) Sampling devices (Bottom and Top)
xxxii) All other standard accessories as per manufacture’s standards
Note: Any other fittings that are necessary for satisfactory operation
of the transformer also shall be provided without any extra cost.
INTERNAL EARTHING
22
The framework and clamping arrangement of core and coil shall be securely
earthed inside the tank by copper strap connection to the tank.
7.0 TESTS
All the equipment offered shall be fully type tested as per IS. The type test
must have been conducted on a transformer of same design. The bidder shall
furnish type test reports along with the offer.
Type Tests
Type tests as per IS 2026 shall be conducted on the transformer and Type test
certificates shall be furnished for the transformer for scrutiny.
Routine Tests
The following routine tests shall be conducted as per IS at the factory/ works
in the presence of Department’s representatives prior to despatch of
equipment.
i) Ratio, polarity and phase sequence.
ii) No-load current and losses at service voltage and formal frequency
iii) Magnetic balance test
iv) Load losses at rated current and normal frequency
v) Impedance Voltage test
vi) Resistance of windings at each tap
vii) Insulation resistance
viii) Induced overvoltage withstand test.
ix) Separate source voltage withstand test.
x) Heat run Test.
Note: losses, % impedance and temperature rise test as per IS 1180.
Tests at Site
The following tests shall be conducted prior to commissioning: -
i) Insulation resistance of the winding between phases and between
individual phases and earth on both HV and LV and also between
HV and LV windings.
ii) Winding resistance
iii) Dielectric strength of transformer oil.
iv) Voltage ratio test at all tap positions.
v) Polarity test.
vi) Magnetic balance test
vii) Proper functioning of all protective relays.
23
connecting it to supply, the transformer tank shall be earthed. All connections
of the earthing system shall be visible for periodical inspection. Copper strip
as specified shall be used for earthing to the earth grid. The transformer neutral
point shall be brought out and solidly earthed by copper strip of suitable size.
After commissioning, the LV voltage shall be measured at different tap
positions. The transformer shall be kept on no-load for 24 hours, and it shall
be ensured that there is no undue temperature rise before loading.
RCC Foundation for Transformer will be provided by bidder as per OEM
recommendation and department approval.
10.0 WARRANTY
Transformer shall be covered under warranty for a period of 24 months from
the date of commissioning.
24
GUARANTEED TECHNICAL PARTICULARS FOR
800 kVA, 11kV/433V TRANSFORMER
(To be filled in by the Bidder)
Sl.
Technical Particulars Guaranteed Value
No
1. Name & Address of Manufacturer
2. Service
3. Rated kVA
4. Rated voltage of HV
5. Rated voltage of LV
6. Rated Frequency
7. No. of Phases
8. Reference ambient temperature in °C
9. Temp. rise in oil
10. Temp. rise by resistance of windings
11. Type of cooling
12. Type of connection
i. High voltage side
ii. Low voltage side
iii.Vector group
iv. Neutral connection
13. Tap settings at HV side apart from normal tap by
varying off circuit tap changer
14. No-load loss at rated voltage & rated frequency
15. Load loss at rated current & rated frequency at
principal tapping at 75 °C
16. Impedance at rated current at principal tapping
17. Reactance at rated current and rated frequency
18. Efficiency at UPF and 0.8 PF at
i. Full load
ii. 75% of full load
iii. 50% of full load
19. Regulation at full load
25
Sl.
Technical Particulars Guaranteed Value
No
i. At unity PF
ii. At 0.8 PF lagging
20. No load current at rated voltage and frequency
21. Terminal arrangement
i. High voltage
ii. Low voltage
22. Maximum flux density at rated voltage and
frequency
23. Load at which maximum efficiency occurs
24. Maximum Efficiency
25. Separate source power frequency with stand
voltage
i) HV winding
ii) LV winding
26. Induced overvoltage withstand
27. Impulse levels with 1/50 µs wave on the HV
winding
28. Insulation Materials
i. Turn insulation, HV side
ii. Turn insulation, LV side
iii. Insulation, core to LV side
iv. Insulation, between HV/LV
26
27
LIST OF APPROVED MAKES FOR ELECTRICAL WORKS
RAJNIGANDHA
1 PVC Wires POLYCAB STANDARD RALLISON EON MYSOCABLES CABLE
SALZER
NORTH- BCH-
Sockets & Plugs (with ABB MENNEKES LEGRAND HAVELLS WEST ELECTRIC
3 Polycarbonate/FRP/
BEST & CROMPTON
Metal Clad Body) SCHNEIDER HENSEL STANDARD CYCLO CROMPTON GREAVES
ENDO LIGHTING
PHILIPS OSRAM LIGHTING IGUZZINI JAQUAR TECHNOLOGIES
5 Light fittings (Indoor)#
CROMPTON
WIPRO TRILUX BAJAJ SURYA HAVELLS GREAVES
6 ENDO
PHILIPS OSRAM BAJAJ IGUZZINI SCHRÉDER LIGHTING
LIGHTING
WIPRO TRILUX K-LITE SURYA HAVELLS TECHNOLOGIES
Light fittings (Outdoor
applications only)#
HALONIX JAQUAR
# LEDs SHALL BE OF NICHIA, CREE, OSRAM, PHILIPS LUMILEDS, CITIZEN & SEOUL SEMICONDUCTORS
MAKE ONLY
Decorative/Special TRANSRAIL
7 Streetlight Pole BAJAJ ASTER K-LITE
LIGHTING
SUMIP
8 FRP/GRP Poles COMPOSITES
BAJAJ
Lighting Management
10 System
SCHNEIDER LUTRON PHILIPS
HONEYWELL WIPRO
28
Sl.No. Items/ Products Name of Brand / Make
BCH-
LEGRAND L&T HAGER ELECTRIC THEBEN SIEMENS
Electronic time switch,
14
Time delay relay, Timer GE POWER
SCHNEIDER CONTROLS ABB HAVELLS
VERSA
15 b BLDC Ceiling Fans DRIVES
CROMPTON
USHA KHAITAN POLAR EPC GREAVES V-GUARD
17 Exhaust Fans
CATA-C
ORIENT
CROMPTON
18 Air Circulators ALMONARD KHAITAN EPC BAJAJ GREAVES
Flameproof luminaires
SUDHIR
19 (Including LED) & BALIGA FCG STAHL FLEXPRO BAJAJ
SWITCHGEAR
Control gears
GE POWER C&S
L&T SIEMENS CONTROLS ELECTRIC HAVELLS INDO ASIAN
22 HRC Fuses
CROMPTON
GREAVES STANDARD
GE POWER
L&T SIEMENS ABB CONTROLS HAVELLS STANDARD
HRC Fuse Base &
23
Carriers
SCHNEIDER
GE POWER
L&T SIEMENS ABB HPL INDO-ASIAN CONTROLS
MV Switch fuse units &
24 C&S
Isolators up to 250A
ELECTRIC HAVELLS SCHNEIDER STANDARD
GE POWER
L&T SIEMENS SCHNEIDER HPL INDO-ASIAN
CONTROLS
Changeover
26
Switches C&S
ELECTRIC STANDARD HAVELLS
29
Sl.No. Items/ Products Name of Brand / Make e
Miniature Circuit
27 Breakers (MCBs) & L&T HAVELLS HPL STANDARD NORTH-WEST HAGER
Distribution Boards
C&S ELECTRIC
SIEMENS
OBO
BETTERMANN LEGRAND SCHNEIDER SIEMENS ABB ERICO
Surge Protection Devices
31
(SPDs)
DEHN
ECE
PETE- BHARAT INDUSTRIES
SCHNEIDER ESSENAR KEL
HAMMOND BIJLEE LTD.
Transformers
34
(Oil-cooled) CROMPTON VOLTAMP
KAVIKA GREAVES
NEUTRONICS
LT Current/Voltage KAPPA AUTOMATIC MANUFACTURING
37 NIPPEN PARAS INTRANS
ELECTRICALS ELECTRIC (AE)
Transformer COMPANY
30
Automatic Voltage
Regulators (AVR) / Servo- AUTOMATIC
39 ELECTRIC (AE)
SERVOMAX
Controlled Voltage
Stabilizers (SCVS)
VOLVO
40 Diesel Engine for DG sets CUMMINS PERKINS CATERPILLER MTU
PENTA
CROMPTON
HT Alternators for DG STAMFORD- LEROY GREAVES
42 TDPS
SOMER
sets AVK
CORDS
CABLE INSUCON
Armoured/ THERMO
47 Unarmoured Telephone V-GUARD CABLES ELKAY SINCO VICCO LAPP INDIA
Cable
ADVANCE CORDS
CABLE CABLE
Double Walled
REX POLYEXTR-
49 Corrugated HDPE Pipes GAMSON DURA-LINE
USIONS
(for UG Cables)
31
Automatic Power factor POWER
52 SCHNEIDER L&T BELUK
MONITOR
PROK DV’s EPCOS
Correction (APFC) Relay
CG
L&T SCHNEIDER MECO NEUTRONICS NIPPEN SCHLUMBERGER
Measuring Instruments
(Analog & Digital meters, AUTOMATIC
53 ELMEASURE RISHAB KRYKARD CIRCUTOR RIKEN ELECTRIC (AE)
Data Loggers & Event
Recorders)
SATEC SECURE
SECURE
CROMPTON BCH-
TEKNIC ABB L&T SIEMENS GREAVES ELECTRIC
Push-Button Stations,
Key Actuators, Rotary C&S GE POWER
56 Switches, Toggle SCHNEIDER KAYCEE JAY JAINSON ELECTRIC CONTROLS
Switches, Indicators,
Selector Switch
VAISHNAV
CROMPTON
ABB GE SIEMENS KIRLOSKAR GREAVES JYOTI
BCH- GE POWER
L&T ABB SIEMENS SCHNEIDER ELECTRIC CONTROLS
58 Starters
CROMPTON
CONTROLS
ALLEN- CROMPTON
59 Soft Starters ABB SCHNEIDER SIEMENS
BRADLEY CONTROLS
LANDIS &
ABB SIEMENS SCHNEIDER DANFOSS NELCO STAEFA
60 Variable Speed Drives
HITACHI VERTIV
EASUN
Protective Relays ABB SIEMENS L&T JYOTI ALIND REYROLLE
61 (Electro mechanic &
C&S ELECTRIC
Numeric) SCHNEIDER PROK DV’s
MORLEY
RAVEL SECUTRON HONEYWELL HOCHIKI NOTIFIER
(HONEYWELL)
Fire Alarm/Smoke
Detection System & THORN SECURITY
62 SIEMENS ZITON EDWARD TELEFIRE SIMPLEX
Control Panels (FACP) &
Aspiration System
SCHRACK
GST (UTC) SECONET FFE LTD.
32
Flame proof Detection
63 FFE LTD.
system
66 a UPS (of all ratings) VERTIV APC RIELLO PILLER EPI SOCOMEC
CONSUL-
UPS (of rating up to 30
66 c RIELLO APLAB GE EATON NEOWATT KELTRON
kVA) & Inverters
TECHSER
POWER
TECHSER
POWER ONE ENERTEC DUBAS
POWER
ECE INDUSTRIES
VERTIV PILLER ESSENAR SOCOMEC APC
LTD.
NUMERIC
Thermoplastic
BCH- PYROTECH
(Polycarbonate/FRP) / HENSEL SPELSBERG ABB DEVI POLYMER
ELECTRIC ELECTRONICS
72 Steel Switch box /
Junction Box &
PUSTRON SAFYBOX SINTEX
Distribution Boards
33
Cable trays CABLOFIL SUMIP COMPOSITES
(PVC, FRP & GI) SINTEX L&T PROFAB (LEGRAND) OBO BETTERMANN
73
PATNY
INDIANA SYSTEMS
Sandwiched Busbar
74 Trunking System SCHNEIDER LEGRAND
GE ENERGY L&T C&S ELECTRIC
OBO
Lightning Protection BETTERMANN
75 DEHN ERICO
Accessories
76 Unitised/ Package
Substation* ABB SCHNEIDER
SIEMENS PETE VOLTAMP
TATA RUBBER
Shock-Proof Insulation
77 SAFEVOLT STANVAC
Mat & Paint
ELECTROMATHILTI
CORPORATION
Maintenance-free
earthing kit with solid
earth electrode & Earth OBO
79 BETTERMANN
TEREC (SGI) ERICO (GEM)
Enhancing Compound
34
Annexure- I
CHECK LIST TO BE FILLED BY TENDERER REGARDING SUBMISSION OF DOCUMENTS WITH
TECHNO-COMMERCIAL BID.
Name of work: Supply Installation testing and commissioning of 800 kVA transformer (Outdoor) for
replacement of existing 750 KVA transformer(Indoor) with supply and laying of HT & LT Cables at CSL
Substation at SAC Campus Ahmedabad.-Electrical works.
Sl Submitted :
Documents
No. Yes / NO
1 संबलं ित प्रालिकारी द्वारा कार्य हे तु जारी ककर्ा गर्ा कार्य आदे श
Work orders issued by the authority concerned to establish work on hand.
2 कार्य अनुभव के लिए संबलं ित प्रालिकारी द्वारा जारी कार्य पूर्त
य ा प्रमार् पत्र
Completion certificates issued by the authority concerned to establish work experience.
3 अहय ता मापदण्ड के अनुसार समान प्रकार तिा मात्रा के कार्य के लनष्पादन के लिए दस्तावेजीर् प्रमार्
Documentary proof for having executed the work of similar nature and comparable
magnitude as per the eligibility criteria.
4 लनजी संस्िाओ द्वारा जारी कार्य के पूर्तय ा प्रमार्-पत्र के साि टी.डी.एस. (स्रोत पर कटौती ककर्ा गर्ा
कर) प्रमार्-पत्र भी प्रस्तुत ककर्ा जाए ।
Completion certificate for works issued by private parties shall be supported by TDS
(Tax Deducted at Source) certificates.
5 ई-लनववदा के लिए संववदा की सामान्र् शतों (जीसीसी) में प्रपत्र-1 के अनुसार कार्य का मूल्र्, समालि
की लतलि, समर् बढ़ाना, इत्र्ादी को दशायते हुए पुरे ककए गए कार्ों की सूची।
A list of completed works indicating value of work, date of completion, extension of
time etc., as per Format-1 in e-tendering General Conditions of Contract (GCC)
35